Preview

Management and Project

Better Essays
Open Document
Open Document
1486 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Management and Project
Project Human Resource Management (DAPM07T)
Assignment 03
Portfolio of Evidence

Table of Contents
Contents
1 Introduction 3 2 Project Scope 3 2.1 Project Statement 3 3 Project Objectives. 3 4 Matrix Organisation and responsibilities 4 5 Project title and responsibilities 4 5.1 Project Team 5 5.2 Roles Of the project team 5 5.2.1 Project Manager 5 5.2.2 Project sponsor 6 5.2.3 Contractor Construction 6 5.2.4 Project engineers 6 5.2.5 Project Coordinator 6 5.2.6 Contractor plumbing 6 6 Advantages and disadvantages of a matrix Organisation 6 6.1 Advantages of Matrix organisation 6 6.2 Disadvantages of matrix organisation 7 7 Communication 7 8 Conclusion 7 9 References 8

*

Introduction

The department of Public works in Mpumalanga province has a requirement to oversee the construction of a community hall as per regulations received from the department to set a project team to be involved in a construction and provide tem with responsibilities.
Project Scope

Project Statement
This project portfolio will follow these aspects: communication process with the team and communities, Project preparation and planning, project execution, WBS, management of progress and time frames, supporting aspects e.g. roles and responsibilities, risks , control measures, execution, controlling and monitoring, time management and financial control.
Project Objectives.
The objectives of building a community hall requested by department of public works, also setting up a project team that can be involved in the whole project,. To set up a team that will follow rules and procedures, deliver the project in time. To sensitise the community on a different way of building using sustainable and eco friendly materials and professional design. To deliver a quality project on time with without exceeding the project is to set up a project team that can build members names and their responsibilities.

Matrix Organisation and responsibilities
Project



References: Copyright (c) 2012 principles of management by: Corporate office; http://management-at-sight.blogspot.com/2012/08/advantages-and-disadvantages-of-matrix.html Ms Word document for project managers - http://www.gla.ac.uk/media/media_26397_en.pdf MatrixOrganisation http://kalyan-city.blogspot.com/2011/05/matrix-organisation-meaning-features.html

You May Also Find These Documents Helpful

  • Satisfactory Essays

    The project will be initiated in which details for the project will be discussed, as well as interviews with key stakeholders will be had. Following this planning will be begun to set project dates and goals. The next step will be execution of the project, and then the project will be observed and…

    • 337 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    CIS590: Project Plan Paper

    • 4496 Words
    • 18 Pages

    The purpose of this document is to define the scope of the project, assign a Project Manager (PM), define the scope of authority and responsibilities of the PM, identify the project team and its functions and responsibilities, indicate the sources of funding and key stakeholders, and outline oversight and governance organizations. This document also lays the groundwork for decisions and planning regarding project direction, outcomes, and delivery. Upon approval of this project plan, work will be initiated on the project and the necessary resources will be committed to achieve project success.…

    • 4496 Words
    • 18 Pages
    Powerful Essays
  • Good Essays

    Admn232 Assignment 1

    • 993 Words
    • 4 Pages

    Goals in planning involve completing the project on time and under budget, with a high quality of workmanship. Determining and organizing available resources involves preparing contracts for sub-contractors and choosing a site superintendent. Daily correspondence with the site superintendent facilitates the controlling function. Leadership is displayed through clear communication regarding what needs to be done, and encouragement when expectations are exceeded.…

    • 993 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Term Paper Sec 402

    • 1192 Words
    • 5 Pages

    An outline of the proposed project approach, process, procedures and timelines in other to meet the objectives of the project. If you have a lengthy document please provide a summary no more than 3 pages.…

    • 1192 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    Project Charter

    • 505 Words
    • 3 Pages

    a. The project goal is to build a livable space for the additional member of the house hold.…

    • 505 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Project Management

    • 1515 Words
    • 7 Pages

    Construct a Cost-Benefit Analysis matrix for an organization that is considering replacing its internal payroll system with a payroll outsourcing service. Include direct and indirect revenue enhancements and direct and indirect cost reductions.…

    • 1515 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    Summary: Project Charter

    • 572 Words
    • 3 Pages

    Preparing and building out the 1500 Spring Garden Data Center facilities, physical security and operational procedures November 30, 2013.…

    • 572 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Project management

    • 1280 Words
    • 7 Pages

    Provide evidence for grading criterion P1. (identify the various stages of the construction process for a low-rise domestic or commercial building)…

    • 1280 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    Project Management

    • 289 Words
    • 2 Pages

    Apply the project management concepts discussed in Weeks 1–3 to this project. This information will also be used in next week’s individual…

    • 289 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Project Management

    • 252 Words
    • 2 Pages

    2. Assume that the project is time constrained and try to resolve any over allocation problems by leveling within slack. What happens?…

    • 252 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    − General Projects and other items such as Masterplan, Section 106 constructions, Project insurances and Security associated with the construction phase…

    • 952 Words
    • 4 Pages
    Satisfactory Essays
  • Best Essays

    The paper discuss the need and justification of the PMP for this construction project, areas that are discussed further in this paper are the audiences of the PMP and why they need to sight the PMP, the major stakeholder, the project owner (Village Investments) is found to be the main audience for this projects as the project owner needs to approve the PMP for the project to continue. In the last section of the body of the paper, it identifies the PMBOK guide as the base of the structure and contents of the PMP, it identify the PMBOK’s nine functions of project management are in the Clift’s PMP in some way with the major function having a lot more detail put into them. The major functions discuss were scope, time, cost, HR, quality and procurement management. One major lesson to be learnt is in the HR management plan with the stakeholder analysis, the school next to the car park was not inputted into the analysis and issues occurred with the closure of the access point to the school, the project anger needs to spend more time on external orientation of the stakeholder analysis to reduce issues in the future. The project manger had a simple PMP that was useful within the budget restraints and time allocated to prepare it, if more time was allowed in preparing this plan some issues during the project may have been reduced or stopped.…

    • 3230 Words
    • 13 Pages
    Best Essays
  • Powerful Essays

    FBI Case study

    • 1127 Words
    • 4 Pages

    In Matrix organizational structure, the work force does not report to a single supervisor but to supervisors/managers of different departments basing on their business strategy. IS enables to reduce the complexity of information sharing by making the information available to all the supervisors at the same time. The drawback of such a complexity is however confusion in decision making and overloading of information to managers.…

    • 1127 Words
    • 4 Pages
    Powerful Essays
  • Good Essays

    Management

    • 942 Words
    • 4 Pages

    As a form of organizational design, matrix design is based on overlapping sets of product departments on an existing functional organization. It relies on a structure composed of multiple command levels. In a matrix design, employees working on a project are both members of their…

    • 942 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Management Project

    • 2595 Words
    • 11 Pages

    W: Not have enough capability to fulfill customers need in summer season. In winter its demand fall, but with other food products it overcome.…

    • 2595 Words
    • 11 Pages
    Powerful Essays