Page 1 of 2
YOUR PURPOSE – Penetrate the enemy’s defenses to secure the crossing sites over Stony Creek IOT allow the ME to continue on to attack the MEB Obj.
YOUR RELATIONSHIP TO HIGHER AND ADJACENT PURPOSES
1/6 (Rein) prevents the enemy’s guard force (1/87th (Rein) from conducting a successful delay, which allows the 34th MID’s main effort (86th MIBR) to establish a prepared defense. This allows the RCT’s main effort to rapidly pass forward to destroy the enemy in the vicinity of (vic) MEB Obj 1 (RCT-6 task) in order to deny the 34th MID an orderly withdraw through JTF-V Obj A.
SPECIFIED TASKS
Conduct a forward passage of lines with LAR as passing force
*Attack in zone to destroy En forces in vic of Reg Obj 2
Conduct a forward passing of lines with 3/6 at Phase Line Green
BPT follow on ME’s attack to MEB Obj
*Secure key crossing sites on Stony Creek
Locate Artillery Battalion
Located Tank Reserve
Turn over EPWs to CLB
Report usable LZs to RCT S-4
Plan NBC decontamination sites
IMPLIED TASKS
Breach obstacles en route to Reg Obj 2
Use engineering assets to create a crossing location on Stony Creek if current bridges are not capable.
BPT continue attack with MOPP level increase
LIMITATIONS (CONSTRAINTS [C] and RESTRAINTS [R])
[C] Fires into no-fire areas (NFA) must be approved by RCT-6 fire support coordination center (FSCC). (p. 71)
[C] MOPP level 1. (p. 48)
[C] Report battalion aid station location. (p. 51)
[C] Turn over to maintenance collection point for all vehicles “down” > 24 hours. (p. 51)
[R] Dismounted LOA is PL Green initially. (p. 48)
[R] Family of scatterable mines (FASCAM) release authority: short duration—RCT-6. (p. 70)
[R] Bypass units must be < platoon. (p. 50)
* Denotes mission-essential tasks
1/6 MISSION ANALYSIS WORKSHEET (cont’d)
Page 2 of 2
ASSUMPTIONS
At least two 70-ton-capable bridges/fording sites