Project Kasturi: 1000 MW CCGT, MALAYSIA Functional Requirements for the Works
Part B: Technical Specification Section 6 Development Requirements – Civil Works
Project Kasturi/MFS Part B Technical Specification, Section 6 Development Requirements – Civil Works
Powertek Berhad Project Kasturi – Combined Cycle Power Plant Functional Requirements for the Works Part B: Technical Specification Section 6 Development Requirements – Civil Works
Issue and Revision Record Rev Date Originator Checker Approver Description
0
1-6-12
S Nash
W Howieson
W Howieson
First Issue
This document is issued for the party which commissioned it and for specific purposes connected with the abovecaptioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it.
.
i
Project Kasturi/MFS Part B Technical Specification, Section 6 Development Requirements – Civil Works
List of Contents
6
Development Requirements - Civil Works 6.1 6.2 General Preparatory Works 6.2.1 Site Characterisation Works 6.2.2 Preliminary Design Studies 6.2.3 Construction Facilities Scope of Civil Part of the Development Works 6.3.1 Site Clearance, Ground Treatment, Foundations and Piling Works 6.3.2 General Infrastructure, Buildings and Store Building 6.3.3 Buildings and Structures for Power Generation (Turbine Hall and Boiler house) 6.3.4 Cooling Water System 6.3.5 Ancillary Systems 6.3.6 Roads, Footpaths and Lighting Systems 6.3.7 Gate House 6.3.8 Lighting System around Power