Preview

nebosh certificate ngc3

Good Essays
Open Document
Open Document
794 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
nebosh certificate ngc3
NATIONAL GENERAL
CERTIFICATE Candidate report template
(2009 specification)

UNIT NGC3 – THE HEALTH AND
SAFETY PRACTICAL APPLICATION

Student number:

Location Date of review / /

Structure report under the following headings:

Introduction including overview of area inspected and activities taking place:

Date of inspection 14/09/12

As part of my Nebosh NGC3 I carried out a health and safety inspection at my employers premises. Their business is medium to heavy engineering; OEM and repair and overhaul activities take place; with machine and assembly workshops yard, office and welfare areas all being inspected. It was a normal working shift when the inspection was carried out and workers would have been unaware I was carrying out an inspection.

Executive Summary

After the completion of the workplace inspection it was obvious that a great deal of time, effort and money had been invested in health and safety and in some areas it was very good. However there are problems that require immediate action if the company is to avoid breaches of regulations, increased risk of accidents and the subsequent cost of these unplanned events;

Immediate action areas

1. Implement a system to deal with visitors (typically delivery/ collection) drivers entering the workshop.
2. Improving the way components are transferred between the machine and assembly shops
3. Managing employees from other sites to keep exits clear

Main findings of the inspection

In terms of health and safety the Management try hard to tick all the boxes; but a lot of the controls already in place get forgotten when a job needs doing in a hurry; existing procedures are not being adhered to; mandatory wearing of safety glasses being the number one failure.

1. Delivery drivers

There entry through the goods in gate is uncontrolled in terms of personnel entering the workshops. When visitors or contractors enter

You May Also Find These Documents Helpful