ASSIGNMENT NICMAR / SODE OFFICE 1. PROGRAMME : GRADUATE PROGRAMME IN CONSTRUCTION PROJECT MANAGEMENT : : MODULE # 18

2. COURSE 3. COURSE TITLE 4. COURSE No 5. REG No

MATERIALS & EQUIPMENT MANAGEMENT : NCP-24/25 : 211-08-14-9831-2131

A)

Overview of Contract: Developing & Constructing New International Airport B) Key Scope of works: Cutting, Excavation & Dozing of 100,000 M3 Disposal of surplus earth 20,000 m3 Imported materials filling Filling of sand 3000 m3 including spreading & leveling Road work including procurement of 1,50,000 liters of Bitumen C) Main Constraints: The proposed project is 30 KM away from the main city. The project is to be constructed in two Phase, and first phase to be completed i n 100 days. Mobilization of Equipment & proper utilization Identification of agencies for supplying of sand from 20 km and work including s preading & leveling Procurement of Bitumen 1,50,000 liters from Assam which is having lead time of 4 5 days. Storage facility available at site only for 50,000 liters D) Tentative programme for the work: Excavation of 100,000 m3 earth – to be completed in 50 days. Per day approximately -2,000 m3 to be excavated so that we can complete the excavation work in 50 day s E) Cost working for Excavation works Selection of equipment – a) Excavator with bucket Komatsu PC 200 – productivity – 600 m3/per day considered. Option -1 - Cost working for PC 200: 1. Hire charges per Hour – Rs.850.00 rate for 10 hrs = 8,500 2. Cost of Diesel 7 litres per hour @ 70 Rs per litre considered for 10 hrs = 4,900 3. Operator wages included 4. Operator food, accommodation & transport per day =Rs.300 5. Wages for Banks man – Rs.400 TOTAL COST PER DAY = RS.14,100 X 4 Excavators required = Rs.56,400 per day and t otal cost estimated for 50 days is 56,400 x 50 = Rs.28.20 lacs

Selection of equipment – b) Excavator with bucket Komatsu PC 400 – productivity – 800 m3/per day considered. Option -2 - Cost working for PC 400: 1. Hire charges per Hour –



Bibliography: 1. NICMAR Lessson book – Construction Equipment & Materials management. 2. Other miscellaneous hand books on construction equipments & materials.

You May Also Find These Documents Helpful

  • Satisfactory Essays

    This assignment is being submitted on July 22, 2014, for Even Anderson introduction to project management PM3110…

    • 271 Words
    • 1 Page
    Satisfactory Essays
  • Better Essays

    Project Management Institute. (2000). _A Guide to the Project Management Body of Knowledge (4th ed.)._…

    • 1150 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    They are allocated 3 weeks on the schedule for their work to be carried out. (6 Man Excavation Crew x 8 Hrs/Day x 5 days/week x 3 weeks) x $85/Hrs = Round to $62,000 D) Carpenters: We can assume that there will be a 2 man crew. They will be present for 2 days to construct any concrete forms, install sight railings, and installation of wood nailer at perimeter curb. (2 CAR x 8 hrs/day x 2 days) x $85/hr = Roundup to $3,000 E) Plumbers: We can assume that there will be a 3 man crew present on site 6 days per week for 2 weeks to install all plumbing/drainage works shown on the contract documents. (3 PLU x 8 hrs/day x 6 days/week x 2 weeks) x $85/hr = Roundup to $25,000 F) Concrete/Pavement Installers: We can assume that there will be a 3 man crew present on site for 9 hrs per day for 1 week to install all concrete work shown on the contract documents. (3 CONC x 9 hrs/day x 5 days/week x 1 week) x $85/hr = Round to $11,000 G) Synthetic Turf Installers (Surface Carpet): We can assume that there will be a 5 man crew present on site for 2 weeks to install all synthetic turf work shown on the contract documents. (5 ST x 8 hrs/day x 5 days/week x 2 weeks)) x $95/hr = Roundup to $38,000 H) Landscaper: We can assume that there will be a 4 man crew present on site for 1 week to install all Landscaping work shown on the contract…

    • 3396 Words
    • 14 Pages
    Powerful Essays
  • Satisfactory Essays

    Happyland Construction, an engineering firm engaged in the design and construction of oil shale plants, is building a new plant in Blissful Valley that requires the use of a new piece of equipment, a new crane. The GargantuLift 6000 crane model produced by Mega Corporation is the recommended crane by engineering, maintenance, finance, purchasing, and management staff. Senior management needs to decide whether it is more beneficial for Happyland Construction to purchase the crane outright from Mega Corp or subcontract (lease) it from Digger Construction. Both options require substantial resources and will affect future business. The figures presented by Sid, the chief purchasing officer demonstrated that it is less expensive to buy the crane directly from Mega Corporation than to lease it. The total cost of ownership for buying the crane is $14.52 million over 10 years’ period vis-à-vis $17.52 million to lease. (See Annexure 1 and 2 respectively)…

    • 943 Words
    • 5 Pages
    Satisfactory Essays
  • Powerful Essays

    Projects are used today as a way of achieving a variety of outcomes in local or international locations for new constructions, new product development, product improvement, process design, process improvement, utility installation, theory and technology development, and many more. Bringing a project to a successful conclusion requires the integration of numerous management functions like controlling, directing, team building, communication and others. It also requires cost and schedule management, technical and risk management, conflict and stakeholder 's management, and life cycle management.…

    • 2105 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    Project Management

    • 289 Words
    • 2 Pages

    Apply the project management concepts discussed in Weeks 1–3 to this project. This information will also be used in next week’s individual…

    • 289 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    ‘Project management is the application of knowledge, skills, tools and techniques to project activities to meet the project requirements’ (Project Management Institute, 2009, p12). Once a project has been approved a project manager is assigned to the project, and ‘is expected to integrate all aspects of the project, ensure that the proper knowledge and resources are available when they are needed, and ensure that the results are produced in a timely, cost-effective manner’ (Meredith and Mantel, 2010, p5). In order to allow this to happen there are several key aspects of a project which need to be carefully thought out and controlled.…

    • 1355 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Construction Contracts

    • 1050 Words
    • 5 Pages

    2. If you were asked to perform an excavation contract competitively with limited boring data, what type of contract would you want and why?…

    • 1050 Words
    • 5 Pages
    Good Essays
  • Best Essays

    PUSPASARI, T.R.. (2005). FACTORS CAUSING THE POOR PERFORMANCE OF CONSTRUCTION PROJECT . Available: http://eprints.utm.my/3723/2/TatianaRinaPuspasariMAD2005ABS.pdf. Last accessed 10/11/2012.…

    • 2267 Words
    • 10 Pages
    Best Essays
  • Good Essays

    Written by ABOYI Adakole Brown. Submitted to the university of Liverpool project management MSc programme.…

    • 956 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Pmp Study Guide

    • 5693 Words
    • 23 Pages

    ** PMP – Project Management Professional Exam STUDY GUIDE – Fifth Edition, Kim Heldman, 2009, ISBN: 978-0470-45558-6…

    • 5693 Words
    • 23 Pages
    Satisfactory Essays
  • Powerful Essays

    Centre for Research in the Management of Projects, University of Manchester, P.O. Box 88, Manchester M60 1QD, UK Centre for Research in the Management of Projects, School of Construction and Project Management, The Bartlett University College London, UK Received 8 July 2003; received in revised form 30 January 2004; accepted 15 June 2004…

    • 6037 Words
    • 25 Pages
    Powerful Essays
  • Good Essays

    Work Study Definition: Work study can defined as the analysis of a task for the best optimal method and optimal time to perform. There for this method investigate two branches one is Method of work should carry out and the best timing to perform that task. So it focus on not only high production the efficiency of the production so called productivity. Influence of Work Study in Improving Productivity In order to recognize the function of work study, need to classify method study and that of time study. Method study is typically used to improve the method of performing work. It is applicable for new and existing task , method study focus to find more efficient and effective methods of doing the jobs that are cost-effective and safe, involve less man power input, and need shorter duration to complete. The better method associated with use of best materials and right manpower so that work is carryout in well controlled method towards to increased resource utilization, better quality and lower costs. Time study provides the standard time, the time duration actually required by worker to complete a task by the standard method. The standard time depend…

    • 621 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Feasibility Study

    • 2381 Words
    • 10 Pages

    Indicate the cost of equipment and facilities needed for the project. The proponents should undertake reliable canvassing using at least two or three supplier and be particulars to models and capacities of equipment as well as the availability of materials.…

    • 2381 Words
    • 10 Pages
    Powerful Essays
  • Good Essays

    Nicmar

    • 22518 Words
    • 91 Pages

    According to Vaastu Shastra every living and non-living element on Earth is composed of the five elements - Earth, Fire, Water, Air and Space.…

    • 22518 Words
    • 91 Pages
    Good Essays

Related Topics