VINAY KUMAR VINAY GUIDED BY:-
ELECTRICAL & ELECTRONICS ENGINEERING OIST BHOPAL.
ACKNOWLEDGEMENT
Firstly, I DHEERAJ KUMAR a vocational trainee-2012 batch would like to thank the management of NTPC LIMITED for arranging such a well managed training programme for the vocational training which I hope is highly beneficial to the organization and students in course of time.
I sincerely acknowledge the co-operation and complete support provided by Sh. A K Jha (Deputy General Manager, O&M), Sh. Suresh Kumar Sr. Engineer (Commissioning) Sh. Bikram Kumar (Engineer, O&M), Sh. Randhir Kumar (Engg. O&M) and all Executives of O & M department posted at Barh Super Thermal Power Project. I am deeply indebted to our training coordinator Sh. Anurag Sinha and Sh.N .K.Singh (DGM ,HR) and all seniors for giving us all valuable support and information which was instrumental in all stages of our training at Barh STPP.
I thank this opportunity to extend our heartfelt thanks to NTPC Ltd.
INDEX 1. INTRODUCTION TO BARH STPP 2. KEY DATA 3. BRIEF SYSTEM DESCRIPTION AND GENERAL INFORMATION 4. 400/132 KV switchyard 5. Transformers 6. 11 & 3.3 KV SWITCHGEAR TO BE INSTALLED IN THE PLANT 7. TECHNICAL PARAMETERS & DETAILS OF SWITCHGEAR USED IN BARH STPP 8. 11KV MISCELLANEOUS SWITCHGEAR (UNDER TESTING) 9. COMMISIONING CHECKS/TESTS 10. MAJOR PROTECTIONS USED IN THE SWITCHGEAR 11. CONCLUSION
INTRODUCTION
Location :-
The project site is located about 3kms east of Barh town in Patna district in the state of Bihar, location being Latitude – 25o 28' N & Longitude – 85o 45' E.
The plant and township are located between NH-31 and railway line. The ash disposal area is located in the south of the railway line.
Land