Mark Holt Specialist in Energy Policy May 27, 2010
Congressional Research Service 7-5700 www.crs.gov RL33558
CRS Report for Congress
Prepared for Members and Committees of Congress
Nuclear Energy Policy
Summary
Nuclear energy issues facing Congress include federal incentives for new commercial reactors, radioactive waste management policy, research and development priorities, power plant safety and regulation, nuclear weapons proliferation, and security against terrorist attacks. Significant incentives for new commercial reactors were included in the Energy Policy Act of 2005 (EPACT05, P.L. 109-58). These include production tax credits, loan guarantees, insurance against regulatory delays, and extension of the Price-Anderson Act nuclear liability system. Together with higher fossil fuel prices and the possibility of greenhouse gas controls, the federal incentives for nuclear power have helped spur renewed interest by utilities and other potential reactor developers. Plans for as many as 31 reactor license applications have been announced, although it is unclear how many of those projects will move forward. In his January 2010 State of the Union Address, President Obama called for “building a new generation of safe, clean nuclear power plants” as a key component of his “clean energy” program. Financing for new reactors is widely considered to depend on the loan guarantees authorized by EPACT05 Title XVII, administered by the Department of Energy (DOE). The total amount of loan guarantees to be provided to nuclear power projects has been a continuing congressional issue. Nuclear power plants are currently allocated $18.5 billion in loan guarantees, enough for three or four reactors. President Obama’s FY2011 budget request would nearly triple the loan guarantee ceiling for nuclear power plants, to $54.5 billion. However, opponents of nuclear power contend that the Administration’s proposed increases in nuclear loan guarantees would provide an unjustifiable subsidy to a mature industry and shift investment away from environmentally preferable and more cost-effective energy technologies. DOE’s nuclear energy research and development program includes advanced reactors, fuel cycle technology and facilities, and infrastructure support. The Obama Administration’s FY2011 funding request for nuclear energy research and development totals $824.1 million—4.8% above the FY2010 appropriation. An additional $88.2 million is requested under Other Defense Activities for DOE’s Office of Nuclear Energy to pay for safeguards and security at the Department’s Idaho nuclear facilities. Disposal of highly radioactive waste has been one of the most controversial aspects of nuclear power. The Nuclear Waste Policy Act of 1982 (P.L. 97-425), as amended in 1987, requires DOE to conduct a detailed physical characterization of Yucca Mountain in Nevada as a permanent underground repository for high-level waste. DOE submitted a license application for the Yucca Mountain repository to the Nuclear Regulatory Commission (NRC) on June 3, 2008, with the repository to open by 2020 at the earliest. The Obama Administration has decided to “terminate the Yucca Mountain program while developing nuclear waste disposal alternatives,” according to the DOE FY2010 budget justification. Alternatives to Yucca Mountain are to be evaluated by a “blue ribbon” panel of experts convened by the Administration. President Obama’s FY2011 budget request would provide no further funding for the Yucca Mountain project, and DOE filed a motion with NRC to withdraw the Yucca Mountain license application on March 3, 2010. However, the motion to withdraw has prompted substantial opposition, including lawsuits in federal court.
Congressional Research Service
Nuclear Energy Policy
Contents
Most Recent Developments.........................................................................................................1 Nuclear Power Status and Outlook ..............................................................................................2 Possible New Reactors ..........................................................................................................3 Federal Support.....................................................................................................................5 Nuclear Production Tax Credit ........................................................................................6 Standby Support..............................................................................................................7 Loan Guarantees .............................................................................................................8 Global Climate Change ....................................................................................................... 10 Nuclear Power Research and Development ............................................................................... 11 Nuclear Power Plant Safety and Regulation............................................................................... 15 Safety ................................................................................................................................. 15 Domestic Reactor Safety ............................................................................................... 15 Reactor Safety in the Former Soviet Bloc...................................................................... 16 Licensing and Regulation.................................................................................................... 17 Reactor Security.................................................................................................................. 18 Decommissioning ............................................................................................................... 19 Nuclear Accident Liability .................................................................................................. 20 Nuclear Waste Management ...................................................................................................... 22 Nuclear Weapons Proliferation .................................................................................................. 24 Federal Funding for Nuclear Energy Programs .......................................................................... 25 Legislation in the 111th Congress ............................................................................................... 27 H.R. 513 (Forbes) ......................................................................................................... 27 H.R. 1698 (Van Hollen)................................................................................................. 27 H.R. 1812 (Bachmann) ................................................................................................. 27 H.R. 1936 (Lowey) ....................................................................................................... 27 H.R. 1937 (Lowey) ....................................................................................................... 27 H.R. 2454 (Waxman) .................................................................................................... 27 H.R. 2768 (Wamp) ........................................................................................................ 28 H.R. 2828 (Bishop) ....................................................................................................... 28 H.R. 2846 (Boehner) ..................................................................................................... 28 H.R. 3009 (Ross) .......................................................................................................... 28 H.R. 3183 (Pastor) ........................................................................................................ 28 H.R. 3385 (Barton) ....................................................................................................... 28 H.R. 3448 (Pitts) ........................................................................................................... 29 H.R. 3505 (Gary Miller)................................................................................................ 29 H.R. 4741 (Fattah) ........................................................................................................ 29 S. 591 (Reid)................................................................................................................. 29 S. 807 (Nelson) ............................................................................................................. 29 S. 861 (Graham)............................................................................................................ 29 S. 1333 (Barrasso)......................................................................................................... 30 S. 1462 (Bingaman) ...................................................................................................... 30 S. 1733 (Kerry) ............................................................................................................. 30 S. 2052 (Mark Udall)/H.R. 5163 (Altmire) .................................................................... 30 S. 2776 (Alexander) ...................................................................................................... 30
Congressional Research Service
Nuclear Energy Policy
S. 2812 (Bingaman)/H.R. 5164 (Altmire) ...................................................................... 31 S. 3060 (Hatch)............................................................................................................. 31 S. 3322 (Voinovich) ...................................................................................................... 31
Tables
Table 1. Announced Nuclear Plant License Applications..............................................................4 Table 2. Funding for the Nuclear Regulatory Commission ......................................................... 26 Table 3. DOE Funding for Nuclear Activities ............................................................................ 26
Contacts
Author Contact Information ...................................................................................................... 31
Congressional Research Service
Nuclear Energy Policy
Most Recent Developments
The Obama Administration submitted an $824.1 million FY2011 funding request for Department of Energy (DOE) nuclear energy research and development on February 1, 2010. Including advanced reactors, fuel cycle technology, and infrastructure support, the total nuclear energy request is 4.8% above the FY2010 appropriation. An additional $88.2 million is being requested under Other Defense Activities for DOE’s Office of Nuclear Energy to pay for safeguards and security at the Department’s Idaho nuclear facilities. President Obama’s State of the Union Address on January 27, 2010, called for “building a new generation of safe, clean nuclear power plants” as a key component of the Administration’s “clean energy” program. Obama’s FY2011 budget request would nearly triple the current ceiling on federal loan guarantees for nuclear power plants, to $54.5 billion. The Administration announced the first conditional nuclear power plant loan guarantee on February 16, 2010, totaling $8.33 billion for two proposed new reactors at Georgia’s Vogtle nuclear plant site. Significant nuclear power incentives are included in a discussion draft of greenhouse gas control legislation, the American Power Act, released by Senators Kerry and Lieberman on May 12, 2010. The draft bill would increase the nuclear loan guarantee ceiling to $54 billion, expand federal reimbursement for regulatory delays in opening new nuclear plants, expand nuclear tax credits, and modify nuclear licensing procedures. Seventeen applications for combined construction permits and operating licenses (COLs) for 26 new nuclear power units have been submitted to the Nuclear Regulatory Commission (NRC), although work on several applications has been suspended (see Table 1). NRC is anticipating COL applications for as many as 31 new reactors through 2011. How many of those proposed reactors will actually be constructed is not yet clear. The Administration’s FY2011 budget request would terminate DOE’s Office of Civilian Radioactive Waste Management (OCRWM), which was established by the Nuclear Waste Policy Act of 1982 (NWPA, 42 U.S.C. 10101 et seq.) to dispose of highly radioactive waste from nuclear power plants and defense facilities. OCRWM had been developing a permanent nuclear waste repository at Yucca Mountain, NV, as specified by an NWPA amendment in 1987. DOE filed a license application with NRC for the proposed Yucca Mountain repository in June 2008. The Obama Administration “has determined that developing the Yucca Mountain repository is not a workable option and the Nation needs a different solution for nuclear waste disposal,” according to the DOE FY2011 budget justification. As a result, no funding for Yucca Mountain or OCRWM is being requested for FY2011. DOE filed a motion with NRC to withdraw the Yucca Mountain license application on March 3, 2010. An NRC licensing panel is currently considering DOE’s withdrawal motion, which has drawn opposition, including lawsuits, from states that have defense-related waste awaiting permanent disposal. Alternatives to Yucca Mountain are to be evaluated by the Blue Ribbon Commission on America’s Nuclear Future, which was formally established by DOE on March 1, 2010, and held its first meeting March 25-26. Congress provided $5 million for the Commission in the FY2010 Energy and Water Development Appropriations Act.
Congressional Research Service
1
Nuclear Energy Policy
Nuclear Power Status and Outlook
The outlook for the U.S. nuclear power industry appears to have brightened after decades of uncertainty. No nuclear power plants have been ordered in the United States since 1978, and more than 100 reactors have been canceled, including all ordered after 1973. The most recent U.S. nuclear unit to be completed was TVA’s Watts Bar 1 reactor, ordered in 1970 and licensed to operate in 1996. But nuclear power is now receiving renewed interest, prompted by volatile fossil fuel prices, possible carbon dioxide controls, and new federal subsidies and incentives. Preliminary work on several proposed new U.S. reactors is currently underway, as discussed in the next section. The U.S. nuclear power industry currently comprises 104 licensed reactors at 65 plant sites in 31 states and generates about 20% of the nation’s electricity.1 TVA’s board of directors voted August 1, 2007, to resume construction on Watts Bar 2, which had been suspended in 1985; the project is to cost about $2.5 billion and be completed in 2013. At TVA’s request, NRC in March 2009 reinstated the construction authorization for the two-unit Bellefonte (AL) nuclear plant, which had been deferred in 1988 and canceled in 2006.2 Annual electricity production from U.S. nuclear power plants is much greater than that from oil and hydropower and other renewable energy sources. Nuclear generation has been overtaken by natural gas in recent years, and it remains well behind coal, which accounts for about 45% of U.S. electricity generation. 3 Nuclear plants generate more than half the electricity in six states. The near-record 834 billion kilowatt-hours of nuclear electricity generated in the United States during 20094 was more than the nation’s entire electrical output in the early 1960s, when the oldest of today’s operating U.S. commercial reactors were ordered.5 Reasons for the 30-year halt in U.S. nuclear plant orders include high capital costs, public concern about nuclear safety and waste disposal, and regulatory compliance issues. High construction costs may pose the most serious obstacle to nuclear power expansion. Construction costs for reactors completed since the mid-1980s ranged from $2 to $6 billion, averaging more than $3,700 per kilowatt of electric generating capacity (in 2007 dollars). The nuclear industry predicts that new plant designs could be built for less than that if many identical plants were built in a series, but current estimates for new reactors show little if any reduction in cost.6
U.S. Nuclear Regulatory Commission, Information Digest 2008-2009, NUREG-1350, Vol. 20, August 2008, p. 32, http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/v20/sr1350v20.pdf. 2 Nuclear Regulatory Commission, “In the Matter of Tennessee Valley Authority (Bellefonte Nuclear Plant Units 1 and 2),” 74 Federal Register 10969, March 13, 2009. 3 Energy Information Administration, Net Generation by Energy Source, April 20, 2010, http://www.eia.doe.gov/cneaf/ electricity/epm/table1_1.html. Net generation excludes electricity used for power plant operation. 4 “World Nuclear Performance in 2009 Pushed Down by Lengthy Outages,” Nucleonics Week, April 1, 2010, p. 1. Totals are for gross generation, including electricity used for reactor operation. 5 All of today’s 104 operating U.S. commercial reactors were ordered from 1963 through 1973; see “Historical Profile of U.S. Nuclear Power Development,” U.S. Council for Energy Awareness, 1992. 6 CRS Report RL34746, Power Plants: Characteristics and Costs, by Stan Mark Kaplan.
1
Congressional Research Service
2
Nuclear Energy Policy
Average U.S. nuclear plant operating costs, however, dropped substantially since 1990, and costly downtime has been steadily reduced. Licensed U.S. commercial reactors generated electricity at an average of 89% of their total capacity in 2009, according to industry statistics.7 Fifty-nine commercial reactors have received 20-year license extensions from the Nuclear Regulatory Commission (NRC), giving them up to a total of 60 years of operation. License extensions for 20 additional reactors are currently under review, and more are anticipated, according to NRC.8 The FY2010 Energy and Water Development Appropriations Act provides $10 million for DOE to study further reactor life extension to 80 years, and DOE has requested $25.8 million for that program in FY2011. Existing nuclear power plants appear to hold a strong position in electricity wholesale markets. In most cases, nuclear utilities have received favorable regulatory treatment of past construction costs, and average existing nuclear plant operating costs are estimated to be competitive with those of fossil fuel technologies.9 Although eight U.S. nuclear reactors were permanently shut down during the 1990s, none has been closed since 1998. Despite the shutdowns, annual U.S. nuclear electrical output increased by more than one-third from 1990 to 2006, according to the Energy Information Administration and industry statistics. The increase resulted primarily from reduced downtime at the remaining plants, the startup of five new units (most recently Watts Bar 1 in 1996), and reactor modifications to boost capacity.
Possible New Reactors
The improved performance of existing reactors, federal incentives, the possibility of carbon dioxide controls that could affect coal plants, and volatile prices for natural gas—the favored fuel for new power plants for most of the past 15 years—have prompted renewed electric industry consideration of the feasibility of building new reactors. Electric utilities and other firms have announced plans to apply for combined construction permits and operating licenses (COLs) for about 30 reactors (see Table 1).10 No firm commitments have been made to build the proposed plants if the COLs are issued, but the sponsors of four nuclear projects have signed preliminary engineering, procurement, and construction (EPC) contracts. About 900 workers are currently excavating the site for the planned Vogtle 3 and 4 reactors in Georgia, according to media reports.11 However, Entergy suspended further license review of its planned GE ESBWR reactors at River Bend, LA, and Grand Gulf, MS, and Dominion switched from the ESBWR to the Mitsubishi USAPWR for its planned new reactor at North Anna, VA. 12 AmerenUE suspended review of a COL for its proposed new Callaway unit in Missouri, and Exelon announced June 30, 2009, that it would no longer pursue a COL for a proposed two-unit plant in Victoria County, TX, but would
7 8
World Nuclear Performance in 2009 Pushed Down by Lengthy Outages,” Nucleonics Week, April 1, 2010, p. 1.
Nuclear Regulatory Commission, Status of License Renewal Applications and Industry Activities, February 3, 2010, http://www.nrc.gov/reactors/operating/licensing/renewal/applications.html 9 Energy Information Administration, Nuclear Power: 12 percent of America’s Generating Capacity, 20 percent of the Electricity, July 17, 2003, at http://www.eia.doe.gov/cneaf/nuclear/page/analysis/nuclearpower.html. 10 Nuclear Regulatory Commission, New Reactors, http://www.nrc.gov/reactors/new-reactors.html 11 William Freebairn, “U.S. AP1000 Projects Gain from Chines Lessons,” Nucleonics Week, April 15, 2010, p. 1. 12 ESBWR: Economic Simplified Boiling Water Reactor; APWR: Advanced Pressurized Water Reactor.
Congressional Research Service
3
Nuclear Energy Policy
seek an early site permit instead, laying the groundwork for possible future licensing. TVA issued a final supplemental environmental impact statement (SEIS) on May 12, 2010, for the Bellefonte site. The preferred alternative in the SEIS is to complete the first of two unfinished Babcock & Wilcox reactors already at the site, rather than build a new Westinghouse AP1000 unit.13 As part of the NuStart consortium, TVA had submitted a COL application in October 2007 for two AP1000s at Bellefonte but announced August 7, 2009, that it would consider building only one of them. Table 1. Announced Nuclear Plant License Applications
Announced Applicant Alternate Energy AmerenUE Site Payett (ID) Callaway (MO) Planned Application 2011 Submitted 7/24/08 Reactor Type Not specified Areva EPR Units 1 1 Construction plans suspended 4/23/09; NRC license review suspended 6/23/09 Reactor selection announced 5/7/10 Status
Blue Castle Dominion DTE Energy Duke Energy Entergy Luminant Power (formerly TXU) FPL NRG Energy NuStart
Utah North Anna (VA) Fermi (MI) Cherokee (SC) River Bend (LA) Comanche Peak (TX) Turkey Point (FL) South Texas Project Grand Gulf (MS), Entergy Bellefonte (AL), TVA
2011 Submitted 11/27/07 Submitted 9/18/08 Submitted 12/13/07 Submitted 9/25/08 Submitted 9/19/08 Submitted 6/30/09 Submitted 9/20/07 Submitted 2/27/08 Submitted 10/30/07
Not specified Mitsubishi USAPWR GE ESBWR Westing.house AP1000 Not specified Mitsubishi USAPWR Westinghouse AP1000 Toshiba ABWR Not specified Westinghouse AP1000
1 1 1 2 1 2 2 2 1 2 EPC contract signed with Toshiba 2/12/09 Licensing suspended Jan. 9, 2009 NuStart shifted lead unit to Vogtle 4/30/09; TVA now considering building only one unit Licensing suspended 1/9/09
PPL Progress Energy
Bell Bend (PA) Harris (NC) Levy County (FL)
Submitted 10/10/08 Submitted 2/19/08 Submitted 7/30/08 Submitted 3/31/08
Areva EPR Westinghouse AP1000 Westinghouse AP1000 Westinghouse
1 2 2 2 EPC contract signed EPC contract signed 1/5/09
SCE&G
13
Summer (SC)
Tennessee Valley Authority, “Single Nuclear Unit at the Bellefonte Plant Site,” fact sheet, http://www.tva.gov/ environment/reports/blnp/index.htm.
Congressional Research Service
4
Nuclear Energy Policy
Announced Applicant Southern
Site Vogtle (GA)
Planned Application Submitted 3/31/08
Reactor Type AP1000 Westinghouse AP1000
Units 2
Status 5/27/08 EPC contract signed 4/8/08; conditional DOE loan guarantee announced 2/16/10
Not specified UniStar (Constellation Energy and EDF) Calvert Cliffs (MD) Nine Mile Point (NY) Total Units
2011 Submitted 7/13/07 (Part 1), 3/13/08 (Part 2) Submitted 9/30/08
Not specified Areva EPR
1 1
Areva EPR
1 29
Sources: NRC, Nucleonics Week, Nuclear News, Nuclear Energy Institute, company news releases.
NRC’s current schedules indicate that the first COLs could be issued by 2011 or 2012, depending on the time required for hearings and other factors.14 Issuance of a COL allows construction to begin and also is a prerequisite for federal loan guarantees and “regulatory risk insurance” as described below. If full-scale construction were to begin soon after receipt of the COLs, the first new reactors could begin operating before 2020. Southern Company is projecting that its planned two new reactors at the Vogtle site, currently scheduled to get the first COLs, will begin commercial operation by 2016 and 2017.15 How many of the reactors listed above are likely to move toward construction after receiving COLs remains highly uncertain. Major variables include construction costs, the availability of financing, construction capacity, fossil fuel prices, and federal incentives and carbon control policy. Recent projections of U.S. electric generating capacity show a wide variation in the amount of new nuclear generation that could be built by 2030—from none to 100 gigawatts (approximately double current capacity). (See Table 9 of CRS Report R40809, Climate Change: Costs and Benefits of the Cap-and-Trade Provisions of H.R. 2454, by Larry Parker and Brent D. Yacobucci.)
Federal Support
The nuclear power industry contends that support from the federal government would be needed for “a major expansion of nuclear energy generation.”16 Significant incentives for building new nuclear power plants were included in the Energy Policy Act of 2005 (EPACT05, P.L. 109-58), signed by President Bush on August 8, 2005. These include production tax credits, loan guarantees, insurance against regulatory delays, and extension of the Price-Anderson Act nuclear
14 15
http://www.nrc.gov/reactors/new-reactors/col.html http://www.southerncompany.com/nuclearenergy/timeline.aspx
16 Nuclear Energy Institute, “NEI Unveils Package of Policy Initiatives Needed to Achieve Climate Change Goals,” press release, October 26, 2009, http://www.nei.org/newsandevents/newsreleases/nei-unveils-package-of-policyinitiatives-needed-to-achieve-climate-change-goals/.
Congressional Research Service
5
Nuclear Energy Policy
liability system (discussed in the “Nuclear Accident Liability” section of this report). Relatively low prices for natural gas—nuclear power’s chief competitor—and rising estimated nuclear plant construction costs have decreased the likelihood that new reactors would be built without federal support. As a result, many draft proposals are currently circulating in Congress to strengthen or add to the EPACT05 incentives. On May 12, 2010, Senators Kerry and Lieberman released a discussion draft of greenhouse gas control legislation, the American Power Act, that would increase the nuclear loan guarantee ceiling, expand federal reimbursement for nuclear regulatory delays, expand nuclear tax credits, and modify nuclear licensing procedures.17 Nuclear power critics have denounced the federal support programs and proposals as a “bailout” of the nuclear industry, contending that federal efforts should focus instead on renewable energy and energy efficiency. 18
Nuclear Production Tax Credit
EPACT05 provides a 1.8-cents/kilowatt-hour tax credit for up to 6,000 megawatts of new nuclear capacity for the first eight years of operation, up to $125 million annually per 1,000 megawatts. The Treasury Department published interim guidance for the nuclear production tax credit on May 1, 2006.19 Under the guidance, the 6,000 megawatts of eligible capacity (enough for about four or five reactors) are to be allocated among reactors that filed license applications by the end of 2008. If more than 6,000 megawatts of nuclear capacity ultimately qualify for the production tax credit, then the credit is to be allocated proportionally among any of the qualifying reactors that begin operating before 2021. By the end of 2008, license applications had been submitted to NRC for more than 34,000 megawatts of nuclear generating capacity,20 so if all those reactors were built before 2021 they would receive less than 20% of the maximum tax credit. The credit is not adjusted for inflation. The Nuclear Energy Institute (NEI) is urging Congress to remove the 6,000 megawatt capacity limit for the production tax credit, index it for inflation, and extend the deadline for plants to begin operation to the start of 2025. NEI is also proposing that a 30% investment tax credit be available for new nuclear construction as an alternative to the production credit.21 The May 12 Kerry-Lieberman discussion draft would increase the production tax credit limit to 8,000 megawatts and allow public power entities to transfer their credits to private-sector partners. In addition, it would allow five-year accelerated depreciation of new nuclear plants, establish a 10% nuclear investment tax credit, and provide other tax benefits for new nuclear plants.
Full text and summaries by the sponsors can be found at http://kerry.senate.gov/americanpoweract/intro.cfm. Nuclear Information and Resource Service, “Senate Appropriators Lard President Obama’s Stimulus Package with up to $50 Billion in Nuclear Reactor Pork,” press release, January 30, 2009, http://www.nirs.org/press/01-30-2009/1. 19 Department of the Treasury, Internal Revenue Service, Internal Revenue Bulletin, No. 2006-18, “Credit for Production From Advanced Nuclear Facilities,” Notice 2006-40, May 1, 2006, p. 855. 20 Energy Information Administration, Status of Potential New Commercial Nuclear Reactors in the United States, February 19, 2009. 21 Nuclear Energy Institute, Legislative Proposal to Help Meet Climate Change Goals by Expanding U.S. Nuclear Energy Production, Washington, DC, October 28, 2009, p. 4, http://www.nei.org/resourcesandstats/documentlibrary/ newplants/policybrief/2009-nuclear-policy-initiative.
18
17
Congressional Research Service
6
Nuclear Energy Policy
Standby Support
Because the nuclear industry has often blamed licensing delays for past nuclear reactor construction cost overruns, EPACT05 authorizes the Secretary of Energy to provide “standby support,” or regulatory risk insurance, to help pay the cost of regulatory delays at up to six new commercial nuclear reactors, subject to funding availability. For the first two reactors that begin construction, the DOE payments could cover all the eligible delay-related costs, such as additional interest, up to $500 million each. For the next four reactors, half of the eligible costs could be paid by DOE, with a payment cap of $250 million per reactor. Delays caused by the failure of a reactor owner to comply with laws or regulations would not be covered. Project sponsors will be required to pay the “subsidy cost” of the program, consisting of the estimated present value of likely future government payments. DOE published a final rule for the “standby support” program August 11, 2006.22 According to a DOE description of the final rule
Events that would be covered by the risk insurance include delays associated with the Nuclear Regulatory Commission’s reviews of inspections, tests, analyses and acceptance criteria or other licensing schedule delays as well as certain delays associated with litigation in federal, state or tribal courts. Insurance coverage is not available for normal business risks such as employment strikes and weather delays. Covered losses would include principal and interest on debt and losses resulting from the purchase of replacement power to satisfy contractual obligations.23
Under the program’s regulations, a project sponsor may enter into a conditional agreement for standby support before NRC issues a combined operating license. The first six conditional agreements to meet all the program requirements, including the issuance of a COL and payment of the estimated subsidy costs, can be converted to standby support contracts. No conditional agreements have yet been reached, according to DOE, primarily because the subsidy cost estimates have not been approved by the Office of Management and Budget.24 The Nuclear Energy Institute has called for expanding the Standby Support program to $500 million for all six covered reactors, rather than just the first two. In addition, NEI proposed that if a reactor begins operating without any delay payments, that plant’s Standby Support coverage, instead of expiring unused, be allowed to “roll over” to the next plant with a conditional agreement.25 The Kerry-Lieberman discussion draft would increase the number of covered reactors to 12 at a time, allowing for rollovers of unused coverage, for up to $500 million per reactor.
22 Department of Energy, “Standby Support for Certain Nuclear Plant Delays,” Federal Register, August 11, 2006, p. 46306. 23 DOE press release, August 4, 2006 http://nuclear.gov/home/08-04-06.html. 24 Meeting with Rebecca F. Smith-Kevern, Director, DOE Office of Light Water Reactor Deployment, October 7, 2009. 25 Nuclear Energy Institute, op. cit.
Congressional Research Service
7
Nuclear Energy Policy
Loan Guarantees
Title XVII of EPACT05 authorizes federal loan guarantees for up to 80% of construction costs for advanced energy projects that reduce greenhouse gas emissions, including new nuclear power plants. Under such loan guarantee agreements, the federal government would repay all covered loans if the borrower defaulted. This would reduce the risk to lenders and allow them to provide financing at low interest rates. The Title XVII loan guarantees are widely considered crucial by the nuclear industry to obtain financing for new reactors. However, opponents contend that nuclear loan guarantees would provide an unjustifiable subsidy to a mature industry and shift investment away from environmentally preferable energy technologies.26 The total amount of Title XVII loan guarantees to be made available for nuclear power has been the subject of considerable congressional debate. President Obama’s FY2011 budget request would nearly triple the current ceiling on federal loan guarantees for nuclear power plants, from $18.5 billion to $54.5 billion. That would increase the number of reactors that could receive loan guarantees from about three or four to about a dozen, depending on their size. The Administration announced the first conditional nuclear power plant loan guarantee on February 16, 2010, totaling $8.33 billion for two proposed new reactors at Georgia’s Vogtle nuclear plant site. The Administration asked Congress on May 21, 2010, to shift $9 billion of the proposed FY2011 increase in nuclear loan guarantees to FY2010, through the supplemental appropriations process. The change is intended to allow conditional loan guarantees to be offered this year to the other previously identified first-round finalists, comprising five reactors at three sites: Calvert Cliffs, the South Texas Plant, and Summer. 27 DOE issued final rules for the program October 4, 2007,28 and finalized the first loan guarantee on September 4, 2009, totaling $535 million for a plant to produce photovoltaic panels.29 DOE’s proposed loan guarantee rules, published May 16, 2007, had been sharply criticized by the nuclear industry for limiting the guarantees to 90% of a project’s debt. The industry contended that EPACT05 allows all of a project’s debt to be covered, as long as debt does not exceed 80% of total construction costs. In its explanation of the proposed rules, DOE expressed concern that guaranteeing 100% of a project’s debt could reduce lenders’ incentive to perform adequate due diligence and therefore increase default risks. In the final rule, however, DOE agreed to guarantee up to 100% of debt, but only for loans issued by the Federal Financing Bank. Title XVII requires the estimated future government costs resulting from defaults on guaranteed loans to be covered up-front by appropriations or by payments from project sponsors. These “subsidy costs” are calculated as the present value of the average possible future net costs to the government for each loan guarantee. If those calculations are accurate, the subsidy cost payments for all the guaranteed projects together should cover the future costs of the program. However, the Congressional Budget Office has predicted that the up-front subsidy cost payments will prove too
26 Thomas B. Cochran and Christopher E. Paine, Statement on Nuclear Developments Before the Committee on Energy and Natural Resources, United States Senate, Natural Resources Defense Council, March 18, 2009, http://energy.senate.gov/public/index.cfm?FuseAction=Hearings.Testimony&Hearing_ID=f25ddd10-c1f5-9e2e-528ec4321cca4c1b&Witness_ID=9f14a78d-58d0-43fb-bf5b-21426d1d888e. 27 Letter from Office of Management and Budget Director Peter R. Orszag to House and Senate leaders, May 21, 2010, http://www.whitehouse.gov/omb/assets/legislative_letters/Pelosi_05212010.pdf. 28 Published October 23, 2007 (72 Federal Register 60116). 29 Department of Energy, “Vice President Biden Announces Finalized $535 Million Loan Guarantee,” press release, September 4, 2009, http://www.lgprogram.energy.gov/press/090409.pdf.
Congressional Research Service
8
Nuclear Energy Policy
low by at least 1% and is scoring bills accordingly.30 For example, appropriations bills that provide loan guarantee authorizations include an adjustment totaling 1% of the loan guarantee ceiling. DOE loan guarantees for renewable energy and electricity transmission projects under EPACT05 section 1705, added by the American Recovery and Reinvestment Act of 2009 (P.L. 111-5), do not require payments by project sponsors, because potential losses are covered by advance appropriations in the act. No such appropriations are currently available for nuclear power projects, so it is anticipated that nuclear loan guarantee subsidy costs would be paid by the project sponsors. As a result, the level of the subsidy costs could have a powerful effect on the viability of nuclear power projects, which are currently expected to cost between $5 billion and $10 billion per reactor. For example, a 10% subsidy cost for a $7 billion loan guarantee would require an upfront payment of $700 million. No subsidy cost amount has yet been established for any nuclear loan guarantee, including the lead Vogtle project in Georgia. The Administration’s continuing internal deliberations over that question may reflect its importance and the amount of controversy being generated. Energy Secretary Steven Chu stated in March that the subsidy cost would probably be about 1%.31 The nuclear industry, contending that historical experience indicates defaults are likely to be minimal, agrees with Chu’s assessment that nuclear plant subsidy costs should be low.32 However, nuclear power critics contend that nuclear power plants are likely to experience delays and cost overruns that could lead to much larger losses under the loan guarantee program. The Center for American Progress concluded that nuclear subsidy costs “should be at least 10 percent and possibly much more.”33 Under the Federal Credit Reform Act (FCRA), federal loan guarantees cannot be provided without an authorized level in an appropriations act. The Senate-passed version of omnibus energy legislation in the 110th Congress (H.R. 6) would have explicitly eliminated FCRA’s applicability to DOE’s planned loan guarantees under EPACT05 (Section 124(b)). That provision would have given DOE essentially unlimited loan guarantee authority for guarantees whose subsidy costs were paid by project sponsors, but it was dropped from the final legislation (P.L. 110-140). Similar language has been included in subsequent legislative proposals, such as energy legislation reported by the Senate Committee on Energy and Natural Resources July 16, 2009 (S. 1462). Pursuant to FCRA, the FY2007 continuing resolution (P.L. 110-5) established an initial cap of $4 billion on loan guarantees under the program, without allocating that amount among the various eligible technologies. The explanatory statement for the FY2008 omnibus funding act (P.L. 110-
Congressional Budget Office, S. 1321, Energy Savings Act of 2007, CBO Cost Estimate, Washington, DC, June 11, 2007, pp. 7-9, http://www.cbo.gov/ftpdocs/82xx/doc8206/s1321.pdf. 31 William Freebairn, “U.S. Industry, Interest Groups Differ on Credit Fees,” Nucleonics Week, March 18, 2010, p. 1. 32 Statement of Leslie C. Kass, Nuclear Energy Institute, to the Subcommittee on Domestic Policy, House Committee on Oversight and Government Reform, April 20, 2010, http://www.nei.org/newsandevents/speechesandtestimony/april20-2010-kass. 33 Richard Caperton, Protecting Taxpayers from a Financial Meltdown, Center for American Progress, Washington, DC, March 8, 2010, p. 2, http://www.americanprogress.org/issues/2010/03/nuclear_financing.html.
30
Congressional Research Service
9
Nuclear Energy Policy
161) increased the loan guarantee ceiling to $38.5 billion through FY2009, including $18.5 billion specifically for nuclear power plants and $2 billion for uranium enrichment plants.34 The FY2009 omnibus funding act increased DOE’s total loan guarantee authority to $47 billion, in addition to the $4 billion authorized in FY2007. Of the $47 billion, $18.5 billion continued to be reserved for nuclear power, $18.5 was for energy efficiency and renewables, $6 billion was for coal, $2 billion was for carbon capture and sequestration, and $2 billion was for uranium enrichment. The time limits on the loan guarantee authority were eliminated. The loan guarantee ceilings remain the same for FY2010, but, as noted above, the FY2011 budget request would allow an additional $36 billion in nuclear loan guarantees. The Kerry-Lieberman discussion draft would raise the nuclear loan guarantee ceiling to $54 billion, similar to the Administration request. DOE issued a solicitation for up to $20.5 billion in nuclear power and uranium enrichment plant loan guarantees on June 30, 2008.35 According to the nuclear industry, 10 nuclear power projects are currently seeking $93.2 billion in loan guarantees, and two uranium enrichment projects are asking for $4.8 billion in guarantees, several times the amount available. 36 Under the program’s regulations, a conditional loan guarantee commitment cannot become a binding loan guarantee agreement until the project receives a COL and all other regulatory requirements are met; as noted above, the first COLs are not expected until late 2011 at the earliest. In the uranium enrichment solicitation, DOE in July 2009 informed USEC Inc., which plans to build a new plant in Ohio, that its technology needed further testing before a loan guarantee could be issued. 37 DOE notified Congress in March 2010 that it would reprogram $2 billion of its unused FY2007 loan guarantee authority toward uranium enrichment, increasing the uranium enrichment total to $4 billion. The move would potentially allow guarantees to be provided to both USEC and the other applicant in the uranium enrichment solicitation, the French firm Areva, which is planning a plant in Idaho.38 DOE offered a $2 billion conditional loan guarantee to Areva on May 20, 2010.39
Global Climate Change
Global climate change that may be caused by carbon dioxide and other greenhouse gas emissions is cited by nuclear power supporters as an important reason to develop a new generation of reactors. Nuclear power plants emit relatively little carbon dioxide, mostly from nuclear fuel production and auxiliary plant equipment. This “green” nuclear power argument has received growing attention in think tanks and academia. As stated by the Massachusetts Institute of Technology in its major study The Future of Nuclear Power: “Our position is that the prospect of
Congressional Record, December 17, 2007, p. H15585. http://www.lgprogram.energy.gov/keydocs.html 36 Marvin S. Fertel, Statement for the Record to the Committee on Energy and Natural Resources, U.S. Senate, Nuclear Energy Institute, March 18, 2009, p. 9, http://energy.senate.gov/public/index.cfm?FuseAction=Hearings.Testimony& Hearing_ID=f25ddd10-c1f5-9e2e-528e-c4321cca4c1b&Witness_ID=4de5e2df-53fe-49ba-906e-9b69d3674e41. 37 Department of Energy, “800 to 1000 New Jobs Coming to Piketon,” press release, July 28, 2009, http://www.lgprogram.energy.gov/press/072809.pdf. 38 Maureen Conley, “DOE Finds $2 Billion More for SWU Plant Loan Guarantees,” NuclearFuel, April 5, 2010, p. 3. 39 Department of Energy, “DOE Offers Conditional Loan Guarantee for Front End Nuclear Facility in Idaho,” press release, May 20, 2010, http://www.energy.gov/news/8996.htm.
35 34
Congressional Research Service
10
Nuclear Energy Policy
global climate change from greenhouse gas emissions and the adverse consequences that flow from these emissions is the principal justification for government support of the nuclear energy option.”40 However, environmental groups have contended that nuclear power’s potential greenhouse gas benefits are modest and must be weighed against the technology’s safety risks, its potential for nuclear weapons proliferation, and the hazards of radioactive waste. 41 They also contend that energy efficiency and renewable energy would be far more productive investments for reducing greenhouse gas emissions.42 Congressional proposals to reduce carbon dioxide emissions, either through taxation or a capand-trade system, could significantly increase the cost of generating electricity with fossil fuels and improve the competitive position of nuclear power. Utilities that have applied for nuclear power plant licenses have often cited the possibility of federal greenhouse gas controls as one of the reasons for pursuing new reactors. (For more on federal incentives and the economics of nuclear power and other electricity generation technologies, see CRS Report RL34746, Power Plants: Characteristics and Costs, by Stan Mark Kaplan.)
Nuclear Power Research and Development
The Obama Administration’s FY2011 funding request for nuclear energy research and development totals $824.1 million—including advanced reactors, fuel cycle technology, and infrastructure support. The total nuclear energy request is 4.8% above the FY2010 appropriation. An additional $88.2 million is requested under Other Defense Activities for DOE’s Office of Nuclear Energy to pay for safeguards and security at DOE’s Idaho nuclear facilities. According to DOE’s FY2011 budget justification, the nuclear energy R&D program includes “generation, safety, waste storage and management, and security technologies, to help meet energy and climate goals.” However, opponents have criticized DOE’s nuclear research program as providing wasteful subsidies to an industry that they believe should be phased out as unacceptably hazardous and economically uncompetitive. Although total funding in the FY2011 nuclear energy request is similar to levels in previous years, the Obama Administration has significantly reorganized the budget request and established new priorities. The Nuclear Power 2010 Program, which assists the near-term design and licensing of new nuclear power plants, is to be completed in FY2010 and receive no further funding. However, a newly established Reactor Concepts Research, Development and Demonstration Program would include new programs to develop small modular reactors and extend the lives and improve the operation of existing commercial nuclear power plants.
40 41
Interdisciplinary MIT Study, The Future of Nuclear Power, Massachusetts Institute of Technology, 2003, p. 79.
Gronlund, Lisbeth, David Lochbaum, and Edwin Lyman, Nuclear Power in a Warming World, Union of Concerned Scientists, December 2007. 42 Travis Madsen, Tony Dutzik, and Bernadette Del Chiaro, et al., Generating Failure: How Building Nuclear Power Plants Would Set America Back in the Race Against Global Warming, Environment America Research and Policy Center, November 2009, http://www.environmentamerica.org/uploads/39/62/3962c378b66c4552624d09cbd8ebba02/ Generating-Failure—Environment-America—Web.pdf.
Congressional Research Service
11
Nuclear Energy Policy
Fuel Cycle Research and Development would be boosted 47.8%, to $201 million, and continue last year’s shift away from the design and construction of nuclear fuel recycling facilities toward an emphasis on longer-term research. Much of the additional funding is to be used for research on spent nuclear fuel disposal and nuclear fuel cycle options, such as partial recycling. The FY2011 budget request would also establish a new program area called Nuclear Energy Enabling Technologies (NEET), to be funded at $99.3 million. This program area would include research that would support a variety of nuclear technologies, advanced nuclear power concepts, and modeling and simulation. Generation IV Research and Development, previously funded as a separate program to develop advanced reactor technology, would be split between NEET and Reactor Concepts RD&D. Funding for university nuclear education and research, previously provided under the Integrated University Program, is to be continued at the same level, $5 million, under the DOE-wide REENERGYSE initiative. 43 The budget request also includes $3 million for International Nuclear Energy Cooperation, including ongoing international activities by the Global Nuclear Energy Partnership (GNEP), which have continued despite a major refocusing of the domestic portion of the program. The Administration’s FY2011 nuclear R&D budget request is consistent with DOE’s Nuclear Energy Research and Development Roadmap issued in April 2010.44 The Roadmap lays out the following four main goals for the program: • • Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of current reactors; Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; Develop sustainable nuclear fuel cycles; and Understand and minimize the risks of nuclear proliferation and terrorism.
• •
Reactor Concepts
The proposed Reactor Concepts RD&D program area would include the existing Next Generation Nuclear Plant (NGNP) demonstration project and research on advanced reactors previously funded under the Generation IV program. New programs would also be established to develop small modular reactors and enhance the “sustainability” of existing commercial nuclear plants. The total funding request for Reactor Concepts RD&D is $195 million. NGNP is a high-temperature gas-cooled reactor demonstration project authorized by the Energy Policy Act of 2005 (EPACT05). The reactor is intended to produce high-temperature heat that could be used to generate electricity, help separate hydrogen from water, or be used in other industrial processes. The Obama Administration’s first budget request (for FY2010) had not specifically mentioned the NGNP project, but the House Appropriations Committee called it a
Regaining our Energy Science and Engineering Edge. Department of Energy, Nuclear Energy Research and Development Roadmap, Report to Congress, Washington, DC, April 2010, http://nuclear.gov/pdfFiles/NuclearEnergy_Roadmap_Final.pdf.
44 43
Congressional Research Service
12
Nuclear Energy Policy
high priority, and Congress ultimately provided $169 million. The FY2011 budget request would provide $103 million for NGNP, including high-temperature fuel development, process heat applications, and materials testing. DOE on March 8, 2010, announced the selection of two industry teams to receive cost-shared awards totaling $40 million to develop NGNP conceptual designs. The conceptual design work is to be completed in FY2010, after which DOE is to make a decision on moving forward to final design and construction. If the project goes forward, a costshared contract for final design and construction is not expected to be awarded before FY2012, and therefore no design funds are being requested for FY2011. 45 The newly established Advanced Reactor Concepts program, with a funding request of $21.9 million, is described by the budget justification as “an expanded version” of the existing Generation IV Nuclear Energy Systems program. “The program will focus on reactors that could dramatically improve performance in sustainability, safety, economics, security, and proliferation resistance,” according to the justification. Nuclear technology development under this program is to include “fast reactors,” using high-energy neutrons, and reactors that would use a variety of heat-transfer fluids, such as liquid sodium. International research collaboration in this area would continue under the Generation IV International Forum (GIF). DOE’s proposed Light Water Reactor Sustainability Program, to receive $25.8 million, would conduct research on extending the life of existing commercial light water reactors beyond 60 years, the maximum operating period currently licensed by the Nuclear Regulatory Commission. The program is to study the aging of reactor materials and analyze safety margins of aging plants. Other research under this program is to focus on improving the efficiency of existing plants, through such measures as increasing plant capacity and upgrading instrumentation and control systems.
Small Modular Reactors
Rising cost estimates for large conventional nuclear reactors—widely projected to be $6 billion or more—have contributed to growing interest in proposals for small modular reactors (SMRs). Ranging from about 40 to 350 megawatts of electrical capacity, such reactors would be only a fraction of the size of current commercial reactors. Several modular reactors would be installed together to make up a power block with a single control room, under most concepts. Current SMR proposals would use a variety of technologies, including high-temperature gas technology in the NGNP program and the light water (LWR) technology used by today’s commercial reactors. DOE is requesting $38.9 million for its proposed Small Modular Reactors Program for FY2011 as part of the Reactor Concepts RD&D program area. DOE plans to hold a competitive solicitation to award cost-shared financial assistance to as many as two SMR designs, according to the FY2011 budget justification. The program would be similar to DOE’s support for larger commercial reactor designs under the Nuclear Power 2010 Program, which is ending during FY2010. DOE would provide support for design certification, standards, and licensing. Legislation to authorize the program (S. 2812) was introduced by Senator Bingaman November 20, 2009.
45
E-mail from Thomas J. O’Connor, Director of Gas Reactor Deployment, U.S. Department of Energy, March 9, 2010.
Congressional Research Service
13
Nuclear Energy Policy
The Senate Appropriations Committee included instructions in its report on the FY2010 Energy and Water Appropriations Act that NRC use carryover funds to “support license application reviews of any new reactor designs, including modular reactors.” NRC held a two-day workshop on small modular reactor licensing in early October 2009. Small modular reactors would go against the overall trend in nuclear power technology toward ever-larger reactors intended to spread construction costs over a greater output of electricity. Proponents of small reactors contend that they would be economically viable despite their far lower electrical output because modules could be assembled in factories and shipped to plant sites, and because their smaller size would allow for simpler safety systems. In addition, although modular plants might have similar or higher costs per kilowatt-hour than large conventional reactors, their ability to be constructed in smaller increments could reduce the financial commitment and risk to electric utilities.
Fuel Cycle Research and Development
The Fuel Cycle Research and Development Program conducts “long-term, science-based” research on a wide variety of technologies for improving the management of spent nuclear fuel, according to the DOE budget justification. The total FY2011 funding request for this program is $201 million, $65 million above the FY2010 appropriation. Under the George W. Bush Administration, when the program was called the Advanced Fuel Cycle Initiative (AFCI), it had focused on near-term development and deployment of a specific type of spent fuel reprocessing technology, UREX, which was intended to recycle plutonium, uranium, and other long-lived radioactive materials into new nuclear fuel. AFCI had constituted the domestic portion of the Bush Administration’s GNEP initiative, which had been intended to provide secure nuclear fuel services to discourage the international spread of nuclear fuel cycle technology. Under the Obama Administration, the program will develop technology options for a wider range of nuclear fuel cycle approaches, including direct disposal of spent fuel (the “once through” cycle) and partial and full recycling, according to the justification. “The program will also conduct scientific research and technology development to enable storage, transportation, and disposal of used nuclear fuel and all radioactive wastes generated by existing and future nuclear fuel cycles,” according to the justification. Much of the planned research on spent fuel management options will support the newly created Blue Ribbon Commission on America’s Nuclear Future, which is to develop alternatives to the planned Yucca Mountain, NV, spent fuel repository, which President Obama wants to terminate. In addition to researching potential waste treatment technologies and approaches that may be considered by the Blue Ribbon Commission, the program will study “a variety of geologic disposal media such as granite, tuff, deep boreholes, clay, shale, salt, and basalt,” according to the justification. Other major research areas in the Fuel Cycle R&D Program include the development of advanced fuels for existing commercial reactors and advanced reactors, improvements in nuclear waste characteristics, and modeling and simulation of fuel cycle options. (For more information about nuclear reprocessing, see CRS Report RL34579, Advanced Nuclear Power and Fuel Cycle Technologies: Outlook and Policy Options, by Mark Holt.)
Congressional Research Service
14
Nuclear Energy Policy
Nuclear Energy Enabling Technologies
The newly established NEET program is intended to conduct research on “the full range of nuclear energy technology issues,” according to the DOE budget justification. Total funding for the program in FY2011 would be $99.3 million. Under the category of Crosscutting Technology Development, research is to be conducted on new types of reactor materials, weapons proliferation risks of fuel cycle options, advanced nuclear plant manufacturing methods, and advanced sensors and instrumentation. The Energy Innovation Hub for Modeling and Simulation, created in FY2010, would be moved from the Generation IV program to NEET with a slight increase in funding, to $24.3 million. The Modeling and Simulation Hub would create a computer model of an operating reactor to allow a better understanding of nuclear technology, with the benefits of such modeling extending to other energy technologies in the future, according to the justification. An initiative called Transformative Nuclear Concepts Research and Development would provide competitive support to “investigator-initiated projects that relate to any aspect of nuclear energy generation,” according to the budget justification. Awards would be available to national laboratories, universities, research institutions, and industry. The funding request for this initiative is $28.9 million.
Nuclear Power Plant Safety and Regulation
Safety
Safety has been a persistent concern about nuclear power, particularly following the March 1979 Three Mile Island accident in Pennsylvania and the April 1986 Chernobyl disaster in the former Soviet Union. In the United States, safety-related shortcomings have been identified in the construction quality of some plants, plant operation and maintenance, equipment reliability, emergency planning, and other areas. In one serious case, it was discovered in March 2002 that leaking boric acid had eaten a large cavity in the top of the reactor vessel in Ohio’s Davis-Besse nuclear plant. The corrosion left only the vessel’s quarter-inch-thick stainless steel inner liner to prevent a potentially catastrophic loss of reactor cooling water. Davis-Besse remained closed for repairs and other safety improvements until NRC allowed the reactor to restart in March 2004. NRC’s oversight of the nuclear industry is an ongoing congressional issue; nuclear utilities often complain that they are subject to overly rigorous and inflexible regulation, but nuclear critics charge that NRC frequently relaxes safety standards when compliance may prove difficult or costly to the industry.
Domestic Reactor Safety
In terms of public health consequences, the safety record of the U.S. nuclear power industry in comparison with other major commercial energy technologies has been excellent. During approximately 3,000 reactor-years of operation in the United States,46 the only incident at a
46
Nuclear Engineering International, “Country Averages to the End of December 2008,” April 2009, p. 38.
Congressional Research Service
15
Nuclear Energy Policy
commercial nuclear power plant that might lead to any deaths or injuries to the public has been the Three Mile Island accident, in which more than half the reactor core melted. A study of 32,000 people living within 5 miles of the reactor when the accident occurred found no significant increase in cancer rates through 1998, although the authors noted that some potential health effects “cannot be definitively excluded.”47 The relatively small amounts of radioactivity released by nuclear plants during normal operation are not generally believed to pose significant hazards, although some groups contend that routine emissions are unacceptably risky. There is substantial scientific uncertainty about the level of risk posed by low levels of radiation exposure; as with many carcinogens and other hazardous substances, health effects can be clearly measured only at relatively high exposure levels. In the case of radiation, the assumed risk of low-level exposure has been extrapolated mostly from health effects documented among persons exposed to high levels of radiation, particularly Japanese survivors of nuclear bombing in World War II. NRC announced April 7, 2010, that it had asked the National Academy of Sciences (NAS) to “perform a state-of-the-art study on cancer risk for populations surrounding nuclear power facilities.” Unlike in previous studies, NAS is to examine cancer diagnosis rates, rather than cancer deaths, potentially increasing the amount of data. The new study would also use geographic units smaller than counties to determine how far members of the study group are located from reactors, to more clearly determine whether there is a correlation between cancer cases and distance from reactors.48 NRC’s safety regulations are designed to keep the probability of accidental core damage (fuel melting) below one in 10,000 per year for each reactor. The regulations also are intended to ensure that reactor containments would be successful at least 90% of the time in preventing major radioactive releases during a core-damage accident. Therefore, the probability of a major release at any given reactor is intended to be below one in 100,000 per year.49 (For the current U.S. fleet of about 100 reactors, that rate would yield an average of one core-damage accident every 100 years and a major release every 1,000 years.) On the other hand, some groups challenge the complex calculations that go into predicting such accident frequencies, contending that accidents with serious public health consequences may be more frequent.50
Reactor Safety in the Former Soviet Bloc
The Chernobyl accident was by far the worst nuclear power plant accident to have occurred anywhere in the world. At least 31 persons died quickly from acute radiation exposure or other injuries, and thousands of additional cancer deaths among the tens of millions of people exposed to radiation from the accident may occur during the next several decades.
Evelyn O. Talbott et al., “Long Term Follow-Up of the Residents of the Three Mile Island Accident Area: 19791998,” Environmental Health Perspectives, published online October 30, 2002, at http://ehp.niehs.nih.gov/docs/2003/ 5662/abstract.html. 48 Nuclear Regulatory Commission, “NRC Asks National Academy of Sciences to Study Cancer Risk in Populations Living Near Nuclear Power Facilities,” press release, April 7, 2010, http://www.nrc.gov/reading-rm/doc-collections/ news/2010/10-060.html. 49 U.S. NRC, Regulatory Guide 1.174, “An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis,” July 1998. 50 Public Citizen Energy Program, “The Myth of Nuclear Safety” http://www.citizen.org/cmep/energy_enviro_nuclear/ nuclear_power_plants/reactor_safety/articles.cfm?ID=4454
47
Congressional Research Service
16
Nuclear Energy Policy
According to a 2006 report by the Chernobyl Forum organized by the International Atomic Energy Agency, the primary observable health consequence of the accident was a dramatic increase in childhood thyroid cancer. The Chernobyl Forum estimated that about 4,000 cases of thyroid cancer have occurred in children who after the accident drank milk contaminated with high levels of radioactive iodine, which concentrates in the thyroid. Although the Chernobyl Forum found only 15 deaths from those thyroid cancers, it estimated that about 4,000 other cancer deaths may have occurred among the 600,000 people with the highest radiation exposures, plus an estimated 1% increase in cancer deaths among persons with less exposure. The report estimated that about 77,000 square miles were significantly contaminated by radioactive cesium. 51 Greenpeace issued a report in 2006 estimating that 200,000 deaths in Belarus, Russia, and Ukraine resulted from the Chernobyl accident between 1990 and 2004.52
Licensing and Regulation
For many years, a top priority of the nuclear industry was to modify the process for licensing new nuclear plants. No electric utility would consider ordering a nuclear power plant, according to the industry, unless licensing became quicker and more predictable, and designs were less subject to mid-construction safety-related changes required by NRC. The Energy Policy Act of 1992 (P.L. 102-486) largely implemented the industry’s licensing goals. Nuclear plant licensing under the Atomic Energy Act of 1954 (P.L. 83-703; U.S.C. 2011-2282) had historically been a two-stage process. NRC first issued a construction permit to build a plant and then, after construction was finished, an operating license to run it. Each stage of the licensing process involved complicated proceedings. Environmental impact statements also are required under the National Environmental Policy Act. Over the vehement objections of nuclear opponents, the Energy Policy Act of 1992 provided a clear statutory basis for one-step nuclear licenses. Under the new process, NRC can issue combined construction permits and operating licenses (COLs) and allow completed plants to operate without delay if they met all construction requirements—called “inspections, tests, analyses, and acceptance criteria,” or ITAAC. NRC would hold preoperational hearings on the adequacy of plant construction only in specified circumstances. DOE’s Nuclear Power 2010 program had paid up to half the cost of several COLs and early site permits to test the revised licensing procedures. However, the COL process cannot be fully tested until construction of new reactors is completed. At that point, it could be seen whether completed plants will be able to operate without delays or whether adjudicable disputes over construction adequacy may arise. As discussed above, Section 638 of the Energy Policy Act of 2005 authorizes federal payments to the owner of a completed reactor whose operation is delayed by regulatory action. The nuclear industry is asking Congress to require NRC to use informal procedures in determining whether ITAAC have been met, eliminate mandatory hearings on uncontested issues before granting a COL, and make other changes in the licensing process.53 The May 12 KerryThe Chernobyl Forum: 2003-2005, Chernobyl’s Legacy: Health, Environmental and Socio-Economic Impacts, International Atomic Energy Agency, April 2006. 52 Greenpeace. The Chernobyl Catastrophe: Consequences on Human Health, April 2006, p. 10.
53 Nuclear Energy Institute, Legislative Proposal to Help Meet Climate Change Goals by Expanding U.S. Nuclear Energy Production, Washington, DC, October 28, 2009, p. 5, http://www.nei.org/resourcesandstats/documentlibrary/ newplants/policybrief/2009-nuclear-policy-initiative. 51
Congressional Research Service
17
Nuclear Energy Policy
Lieberman discussion draft includes the industry’s proposal to eliminate the mandatory hearing requirement on uncontested issues. A fundamental concern in the nuclear regulatory debate is the performance of NRC in issuing and enforcing nuclear safety regulations. The nuclear industry and its supporters have regularly complained that unnecessarily stringent and inflexibly enforced nuclear safety regulations have burdened nuclear utilities and their customers with excessive costs. But many environmentalists, nuclear opponents, and other groups charge NRC with being too close to the nuclear industry, a situation that they say has resulted in lax oversight of nuclear power plants and routine exemptions from safety requirements. Primary responsibility for nuclear safety compliance lies with nuclear plant owners, who are required to find any problems with their plants and report them to NRC. Compliance is also monitored directly by NRC, which maintains at least two resident inspectors at each nuclear power plant. The resident inspectors routinely examine plant systems, observe the performance of reactor personnel, and prepare regular inspection reports. For serious safety violations, NRC often dispatches special inspection teams to plant sites. In response to congressional criticism, NRC has reorganized and overhauled many of its procedures. The Commission has moved toward “risk-informed regulation,” in which safety enforcement is guided by the relative risks identified by detailed individual plant studies. NRC’s risk-informed reactor oversight system, inaugurated April 2, 2000, relies on a series of performance indicators to determine the level of scrutiny that each reactor should receive. 54
Reactor Security
Nuclear power plants have long been recognized as potential targets of terrorist attacks, and critics have long questioned the adequacy of requirements on nuclear plant operators to defend against such attacks. All commercial nuclear power plants licensed by NRC have a series of physical barriers against access to vital reactor areas and are required to maintain a trained security force to protect them. A key element in protecting nuclear plants is the requirement that simulated terrorist attacks, monitored by NRC, be carried out to test the ability of the plant operator to defend against them. The severity of attacks to be prepared for is specified in the “design basis threat” (DBT). EPACT05 required NRC to revise the DBT based on an assessment of terrorist threats, the potential for multiple coordinated attacks, possible suicide attacks, and other criteria. NRC approved the DBT revision based on those requirements on January 29, 2007. The revised DBT does not require nuclear power plants to defend against deliberate aircraft attacks. NRC contended that nuclear facilities were already required to mitigate the effects of large fires and explosions, no matter what the cause, and that active protection against airborne threats was being addressed by U.S. military and other agencies.55 After much consideration, NRC voted February 17, 2009, to require all new nuclear power plants to incorporate design features that would ensure
For more information about the NRC reactor oversight process, see http://www.nrc.gov/NRR/OVERSIGHT/ ASSESS/index.html. 55 NRC Office of Public Affairs, NRC Approves Final Rule Amending Security Requirements, News Release No. 07012, January 29, 2007.
54
Congressional Research Service
18
Nuclear Energy Policy
that, in the event of a crash by a large commercial aircraft, the reactor core would remain cooled or the reactor containment would remain intact, and radioactive releases would not occur from spent fuel storage pools.56 NRC rejected proposals that existing reactors also be required to protect against aircraft crashes, such as by adding large external steel barriers. However, NRC did impose some additional requirements related to aircraft crashes on all reactors, both new and existing, after the 9/11 terrorist attacks of 2001. In 2002, as noted above, NRC ordered all nuclear power plants to develop strategies to mitigate the effects of large fires and explosions that could result from aircraft crashes or other causes. An NRC regulation on fire mitigation strategies, along with requirements that reactors establish procedures for responding to specific aircraft threats, was approved December 17, 2008.57 Other ongoing nuclear plant security issues include the vulnerability of spent fuel pools, which hold highly radioactive nuclear fuel after its removal from the reactor, standards for nuclear plant security personnel, and nuclear plant emergency planning. NRC’s December 2008 security regulations addressed some of those concerns and included a number of other security enhancements. EPACT05 required NRC to conduct force-on-force security exercises at nuclear power plants every three years (which was NRC’s previous policy), authorized firearms use by nuclear security personnel (preempting some state restrictions), established federal security coordinators, and required fingerprinting of nuclear facility workers. (For background on security issues, see CRS Report RL34331, Nuclear Power Plant Security and Vulnerabilities, by Mark Holt and Anthony Andrews.)
Decommissioning
When nuclear power plants reach the end of their useful lives, they must be safely removed from service, a process called decommissioning. NRC requires nuclear utilities to make regular contributions to special trust funds to ensure that money is available to remove radioactive material and contamination from reactor sites after they are closed. The first full-sized U.S. commercial reactors to be decommissioned were the Trojan plant in Oregon, whose decommissioning completion received NRC approval on May 23, 2005, and the Maine Yankee plant, for which NRC approved most of the site cleanup on October 3, 2005. The Trojan decommissioning cost $429 million, according to reactor owner Portland General Electric, and the Maine Yankee decommissioning cost about $500 million.58 Decommissioning of the Connecticut Yankee plant cost $790 million and was approved by NRC on November 26, 2007.59 NRC approved the cleanup of the decommissioned Rancho Seco reactor site in California on
Nuclear Regulatory Commission, Final Rule—Consideration of Aircraft Impacts for New Nuclear Power Reactors, Commission Voting Record, SECY-08-0152, February 17, 2009. 57 Nuclear Regulatory Commission, “NRC Approves Final Rule Expanding Security Requirements for Nuclear Power Plants,” press release, December 17, 2008, http://www.nrc.gov/reading-rm/doc-collections/news/2008/08-227.html. 58 Sharp, David, “NRC Signs Off on Maine Yankee’s Decommissioning,” Associated Press, October 3, 2005. 59 E-mail communication from Bob Capstick, Connecticut Yankee Atomic Power Company, August 28, 2008.
56
Congressional Research Service
19
Nuclear Energy Policy
October 7, 2009.60 The decommissioning of Rancho Seco was estimated to cost $500 million, excluding future demolition of the cooling towers and other remaining plant structures.61 Spent nuclear fuel remains stored in dry casks at the decommissioned plant sites. The tax treatment of decommissioning funds has been an issue for Congress. EPACT05 provided favorable tax treatment to nuclear decommissioning funds, subject to certain restrictions.
Nuclear Accident Liability
Liability for damages to the general public from nuclear incidents is addressed by the PriceAnderson Act (primarily Section 170 of the Atomic Energy Act of 1954, 42 U.S.C. 2210). EPACT05 extended the availability of Price-Anderson coverage for new reactors and new DOE nuclear contracts through the end of 2025. (Existing reactors and contracts were already covered.) Under Price-Anderson, the owners of commercial reactors must assume all liability for nuclear damages awarded to the public by the court system, and they must waive most of their legal defenses following a severe radioactive release (“extraordinary nuclear occurrence”). To pay any such damages, each licensed reactor with at least 100 megawatts of electric generating capacity must carry the maximum liability insurance reasonably available, which was raised from $300 million to $375 million on January 1, 2010.62 Any damages exceeding $375 million are to be assessed equally against all 100-megawatt-and-above power reactors, up to $111.9 million per reactor. Those assessments—called “retrospective premiums”—would be paid at an annual rate of no more than $17.5 million per reactor, to limit the potential financial burden on reactor owners following a major accident. According to NRC, all 104 commercial reactors are currently covered by the Price-Anderson retrospective premium requirement.63 For each nuclear incident, the Price-Anderson liability system currently would provide up to $12.6 billion in public compensation. That total includes the $375 million in insurance coverage carried by the reactor that suffered the incident, plus the $111.9 million in retrospective premiums from each of the 104 currently covered reactors, totaling $12.0 billion. On top of those payments, a 5% surcharge may also be imposed, raising the total per-reactor retrospective premium to $117.5 million and the total available compensation to about $12.6 billion. Under PriceAnderson, the nuclear industry’s liability for an incident is capped at that amount, which varies depending on the number of covered reactors, the amount of available insurance, and an inflation adjustment. Payment of any damages above that liability limit would require congressional approval under special procedures in the act.
Nuclear Regulatory Commission, “NRC Releases Rancho Seco Nuclear Plant for Unconditional Use,” press release, October 7, 2009, http://www.nrc.gov/reading-rm/doc-collections/news/2009/09-165.html. 61 “20 Years Later, Rancho Seco Ready for Final Shutdown,” Sacramento County Herald, June 9, 2009, http://m.news10.net/news.jsp?key=190656. 62 American Nuclear Insurers, “Need for Nuclear Liability Insurance,” January 2010, http://www.nuclearinsurance.com/library/Nuclear%20Liability%20in%20the%20US.pdf. 63 Reactors smaller than 100 megawatts must purchase an amount of liability coverage determined by NRC but are not subject to retrospective premiums. Total liability for those reactors is limited to $560 million, with the federal government indemnifying reactor operators for the difference between that amount and their liability coverage (Atomic Energy Act sec. 170 b. and c.).
60
Congressional Research Service
20
Nuclear Energy Policy
EPACT05 increased the limit on per-reactor annual payments to $15 million from the previous $10 million, and required the annual limit to be adjusted for inflation every five years. As under previous law, the total retrospective premium limit is adjusted every five years as well. Both the annual and total limits were most recently adjusted October 29, 2008.64 For the purposes of those payment limits, a nuclear plant consisting of multiple small reactors (100-300 megawatts, up to a total of 1,300 megawatts) would be considered a single reactor. Therefore, a power plant with six 120-megawatt pebble-bed modular reactors would be liable for retrospective premiums of up to $111.9 million, rather than $671.4 million (excluding the 5% surcharge). The Price-Anderson Act also covers contractors who operate hazardous DOE nuclear facilities. EPACT05 set the liability limit on DOE contractors at $10 billion per accident, to be adjusted for inflation every five years. The first adjustment under EPACT, raising the liability limit to $11.961 billion, took effect October 14, 2009.65 The liability limit for DOE contractors previously had been the same as for commercial reactors, excluding the 5% surcharge, except when the limit for commercial reactors dropped because of a decline in the number of covered reactors. PriceAnderson authorizes DOE to indemnify its contractors for the entire amount of their liability, so that damage payments for nuclear incidents at DOE facilities would ultimately come from the Treasury. However, the law also allows DOE to fine its contractors for safety violations, and contractor employees and directors can face criminal penalties for “knowingly and willfully” violating nuclear safety rules. EPACT05 limited the civil penalties against a nonprofit contractor to the amount of management fees paid under that contract. Previously, Atomic Energy Act §234A specifically exempted seven nonprofit DOE contractors and their subcontractors from civil penalties and authorized DOE to automatically remit any civil penalties imposed on nonprofit educational institutions serving as DOE contractors. EPACT05 eliminated the civil penalty exemption for future contracts by the seven listed nonprofit contractors and DOE’s authority to automatically remit penalties on nonprofit educational institutions. The Price-Anderson Act’s limits on liability were crucial in establishing the commercial nuclear power industry in the 1950s. Supporters of the Price-Anderson system contend that it has worked well since that time in ensuring that nuclear accident victims would have a secure source of compensation, at little cost to the taxpayer. Extension of the act was widely considered a prerequisite for new nuclear reactor construction in the United States. Opponents contend that Price-Anderson inappropriately subsidizes the nuclear power industry by reducing its insurance costs and protecting it from some of the financial consequences of the most severe conceivable accidents. The United States is supporting the establishment of an international liability system that, among other purposes, would cover U.S. nuclear equipment suppliers conducting foreign business. The Convention on Supplementary Compensation for Nuclear Damage (CSC) will not enter into force until at least five countries with a specified level of installed nuclear capacity have enacted implementing legislation. Such implementing language was included in the Energy Independence and Security Act of 2007 (P.L. 110-140, section 934), signed by President Bush December 19, 2007. Supporters of the Convention hope that more countries will join now that the United States
64 Nuclear Regulatory Commission, “Inflation Adjustment to the Price-Anderson Act Financial Protection Regulations,” 73 Federal Register 56451, September 29, 2008. 65 Department of Energy, “Adjusted Indemnification Amount,” 74 Federal Register 52793, October 14, 2009.
Congressional Research Service
21
Nuclear Energy Policy
has acted. Aside from the United States, three countries have submitted the necessary instruments of ratification, but the remaining nine countries that so far have signed the convention do not have the required nuclear capacity for it to take effect. Ratification by a large nuclear energy producer such as Japan would allow the treaty to take effect, as would ratification by two significant but smaller producers such as South Korea, Canada, Russia, or Ukraine. Under the U.S. implementing legislation, the CSC would not change the liability and payment levels already established by the Price-Anderson Act. Each party to the convention would be required to establish a nuclear damage compensation system within its borders analogous to Price-Anderson. For any damages not covered by those national compensation systems, the convention would establish a supplemental tier of damage compensation to be paid by all parties. P.L. 110-140 requires the U.S. contribution to the supplemental tier to be paid by suppliers of nuclear equipment and services, under a formula to be developed by DOE. Supporters of the convention contend that it will help U.S. exporters of nuclear technology by establishing a predictable international liability system. For example, U.S. reactor sales to the growing economies of China and India would be facilitated by those countries’ participation in the CSC liability regime.
Nuclear Waste Management
One of the most controversial aspects of nuclear power is the disposal of radioactive waste, which can remain hazardous for thousands of years. Each nuclear reactor produces an annual average of about 20 metric tons of highly radioactive spent nuclear fuel, for a nationwide total of about 2,000 metric tons per year. U.S. reactors also generate about 40,000 cubic meters of low-level radioactive waste per year, including contaminated components and materials resulting from reactor decommissioning.66 The federal government is responsible for permanent disposal of commercial spent fuel (paid for with a fee on nuclear power production) and federally generated radioactive waste, whereas states have the authority to develop disposal facilities for most commercial low-level waste. Under the Nuclear Waste Policy Act (42 U.S.C. 10101, et seq.), spent fuel and other highly radioactive waste is to be isolated in a deep underground repository, consisting of a large network of tunnels carved from rock that has remained geologically undisturbed for hundreds of thousands of years. The program is run by DOE’s Office of Civilian Radioactive Waste Management (OCRWM). As amended in 1987, NWPA designated Yucca Mountain in Nevada as the only candidate site for the national repository. The act required DOE to begin taking waste from nuclear plant sites by 1998—a deadline that even under the most optimistic scenarios will be missed by more than 20 years. DOE filed a license application with NRC for the proposed Yucca Mountain repository in June 2008. The Obama Administration “has determined that developing the Yucca Mountain repository is not a workable option and the Nation needs a different solution for nuclear waste disposal,” according to the DOE FY2011 budget justification. As a result, no funding for Yucca Mountain or OCRWM is being requested for FY2011. DOE filed a motion with NRC to withdraw the Yucca Mountain license application on March 3, 2010. An NRC licensing panel is currently considering
DOE, Manifest Information Management System http://mims.apps.em.doe.gov. Average annual utility disposal from 2002 through 2007.
66
Congressional Research Service
22
Nuclear Energy Policy
DOE’s withdrawal motion, which has drawn opposition, including lawsuits, from states that have defense-related waste awaiting permanent disposal. Alternatives to Yucca Mountain are to be evaluated by the Blue Ribbon Commission on America’s Nuclear Future, which was formally established by DOE on March 1, 2010, and held its first meeting March 25-26. Congress provided $5 million for the Commission in the FY2010 Energy and Water Development Appropriations Act. The FY2010 OCRWM budget request of $198.6 million sought only enough funding to continue the Yucca Mountain licensing process and to evaluate alternative policies, according to DOE. The request was about $90 million below the FY2009 funding level, which was nearly $100 million below the FY2008 level. More than 2,000 waste program contract employees were terminated during FY2009, and about 630 workers remain—about 400 contractors and 230 federal employees.67 During consideration of the FY2010 appropriations request, the House agreed with the Administration’s plans to provide funding solely for Yucca Mountain licensing activities and for a blue-ribbon panel to review waste management options. The House approved the Administration budget request, including $5 million for the blue-ribbon review. However, the House-passed bill specified that the review must include Yucca Mountain as one of the alternatives, despite the Administration’s contention that the site should no longer be considered. According to the House Appropriations Committee report, “It might well be the case that an alternative to Yucca Mountain better meets the requirements of the future strategy, but the review does not have scientific integrity without considering Yucca Mountain.” The Senate also recommended approval of the Administration request, but without any restrictions on the blue-ribbon panel, and the House report language was dropped in conference. Funding for the nuclear waste program in the past has been provided under two appropriations accounts. The Administration’s FY2010 request was divided evenly between an appropriation from the Nuclear Waste Fund, which holds fees paid by nuclear utilities, and the Defense Nuclear Waste Disposal account, which pays for disposal of high-level waste from the nuclear weapons program. The Senate Appropriations Committee report called for the Secretary of Energy to suspend fee collections, “given the Administration’s decision to terminate the Yucca Mountain repository program while developing disposal alternatives,” but the language was dropped in conference. Energy Secretary Steven Chu in October 2009 rejected requests from the nuclear industry and state utility regulators to suspend the fee, saying the revenues were still necessary, and nuclear utilities and regulators filed lawsuits to stop the fee in April 2010.68 Additional FY2010 funding from the Nuclear Waste Fund for the Yucca Mountain licensing process was included in the NRC budget request. The House provided the full $56 million requested, while the Senate voted to cut the request to $29 million. The conference agreement includes the Senate reduction.
Elaine Hiruo, “Yucca Contractors Told to Prepare for Shutdown,” NuclearFuel, May 17, 2010, p. 1. National Association of Regulatory Utility Commissioners, “State Regulators Go to Court with DOE over Nuclear Waste Fees,” news release, April 2, 2010, http://www.naruc.org/News/default.cfm?pr=193; Nuclear Energy Institute, “NEI, Electric Utilities File Suit to Suspend Collection of Fees for Reactor Fuel Management,” news release, April 5, 2010, http://www.nei.org/newsandevents/newsreleases/nei-electric-utilities-file-suit-to-suspend-collection-of-fee-forreactor-fuel-management.
68
67
Congressional Research Service
23
Nuclear Energy Policy
The Yucca Mountain project faces regulatory uncertainty, in addition to the Obama Administration’s policy review. A ruling on July 9, 2004, by the U.S. Court of Appeals for the District of Columbia Circuit overturned a key aspect of the Environmental Protection Agency’s (EPA’s) regulations for the planned repository.69 The three-judge panel ruled that EPA’s 10,000year compliance period was too short, but it rejected several other challenges to the rules. EPA published new standards on October 15, 2008, that would allow radiation exposure from the repository to increase after 10,000 years.70 The State of Nevada has filed a federal Appeals Court challenge to the EPA standards. (For more information on the EPA standards, see CRS Report RL34698, EPA’s Final Health and Safety Standard for Yucca Mountain, by Bonnie C. Gitlin.) NWPA required DOE to begin taking waste from nuclear plant sites by January 31, 1998. Nuclear utilities, upset over DOE’s failure to meet that deadline, have won two federal court decisions upholding the department’s obligation to meet the deadline and to compensate utilities for any resulting damages. Utilities have also won several cases in the U.S. Court of Federal Claims. DOE estimates that liability payments would eventually total $11 billion if DOE were to begin removing waste from reactor sites by 2020, the previous target for opening Yucca Mountain. 71 (For more information, see CRS Report R40996, The Yucca Mountain Litigation: Liability Under the Nuclear Waste Policy Act (NWPA) of 1982, by Todd Garvey, CRS Report R40202, Nuclear Waste Disposal: Alternatives to Yucca Mountain, by Mark Holt, and CRS Report RL33461, Civilian Nuclear Waste Disposal, by Mark Holt.)
Nuclear Weapons Proliferation
Renewed interest in nuclear power throughout the world has led to increased concern about nuclear weapons proliferation, because technology for making nuclear fuel can also be used to produce nuclear weapons material. Of particular concern are uranium enrichment, a process to separate and concentrate the fissile isotope uranium-235, and nuclear spent fuel reprocessing, which can produce weapons-useable plutonium. The International Atomic Energy Agency (IAEA) conducts a safeguards program that is intended to prevent civilian nuclear fuel facilities from being used for weapons purposes, but not all potential weapons proliferators belong to the system, and there are ongoing questions about its effectiveness. Several proposals have been developed to guarantee nations without fuel cycle facilities a supply of nuclear fuel in exchange for commitments to forgo enrichment and reprocessing, which was one of the original goals of the Global Nuclear Energy Partnership. Several situations have arisen throughout the world in which ostensibly commercial uranium enrichment and reprocessing technologies have been subverted for military purposes. In 2003 and 2004, it became evident that Pakistani nuclear scientist A.Q. Khan had sold sensitive technology and equipment related to uranium enrichment to states such as Libya, Iran, and North Korea. Although Pakistan’s leaders maintain they did not acquiesce in or abet Khan’s activities, Pakistan
Nuclear Energy Institute v. Environmental Protection Agency, U.S. Court of Appeals for the District of Columbia Circuit, no. 01-1258, July 9, 2004. 70 Environmental Protection Agency, “Public Health and Environmental Radiation Protection Standards for Yucca Mountain, Nevada,” 73 Federal Register 61256, October 15, 2008. 71 Statement of Edward F. Sproat III, Director of the Office of Civilian Radioactive Waste Management, Before the House Budget Committee, October 4, 2007.
69
Congressional Research Service
24
Nuclear Energy Policy
remains outside the Nuclear Nonproliferation Treaty (NPT) and the Nuclear Suppliers Group (NSG). Iran has been a direct recipient of Pakistani enrichment technology. IAEA’s Board of Governors found in 2005 that Iran’s breach of its safeguards obligations constituted noncompliance with its safeguards agreement, and referred the case to the U.N. Security Council in February 2006. Despite repeated calls by the U.N. Security Council for Iran to halt enrichment and reprocessing-related activities, and imposition of sanctions, Iran continues to develop enrichment capability at Natanz and at a site near Qom disclosed in September 2009. Iran insists on its inalienable right to develop the peaceful uses of nuclear energy, pursuant to Article IV of the NPT. Interpretations of this right have varied over time. Former IAEA Director General Mohamed ElBaradei did not dispute this inalienable right and, by and large, neither have U.S. government officials. However, the case of Iran raises perhaps the most critical question in this decade for strengthening the nuclear nonproliferation regime: How can access to sensitive fuel cycle activities (which could be used to produce fissile material for weapons) be circumscribed without further alienating non-nuclear weapon states in the NPT? Leaders of the international nuclear nonproliferation regime have suggested ways of reining in the diffusion of such inherently dual-use technology, primarily through the creation of incentives not to enrich uranium or reprocess spent fuel. The international community is in the process of evaluating those proposals and may decide upon a mix of approaches. At the same time, there is debate on how to improve the IAEA safeguards system and its means of detecting diversion of nuclear material to a weapons program in the face of expanded nuclear power facilities worldwide. (For more information, see CRS Report RL34234, Managing the Nuclear Fuel Cycle: Policy Implications of Expanding Global Access to Nuclear Power, coordinated by Mary Beth Nikitin; and CRS Report R41216, 2010 Non-Proliferation Treaty (NPT) Review Conference: Key Issues and Implications, coordinated by Paul K. Kerr and Mary Beth Nikitin.)
Federal Funding for Nuclear Energy Programs
The following tables summarize current funding for DOE nuclear energy programs and NRC. The sources for the funding figures are Administration budget requests and committee reports on the Energy and Water Development Appropriations Acts, which fund DOE and NRC. FY2009 funding for energy and water programs was included in the Omnibus Appropriations Act for FY2009 (P.L. 111-8), signed March 11, 2009. Detailed funding tables for the act are provided by the Committee Print of the House Committee on Appropriations on H.R. 1105. FY2010 funding is included in the Energy and Water Development and Related Agencies Appropriations Act, 2010 (P.L. 111-85, H.Rept. 111-278), signed October 28, 2009. The FY2011 DOE funding request for nuclear energy has been significantly reorganized, as discussed in the earlier section on Nuclear Energy Research and Development.
Congressional Research Service
25
Nuclear Energy Policy
Table 2. Funding for the Nuclear Regulatory Commission
(budget authority in millions of current dollars)
FY2009 Approp. Nuclear Regulatory Commission Reactor Safety Nuclear Materials and Waste Yucca Mountain Licensing Inspector General Total NRC budget authority —Offsetting fees Net appropriation 788.3 197.3 49.0 10.9 1,045.5 -870.6 174.9 806.8 220.2 29.0 10.9 1,066.9 -912.2 154.7 804.1 229.4 10.0 10.1 1,053.6 -915.3 138.3 FY2010 Approp. FY2011 Request
Table 3. DOE Funding for Nuclear Activities
(budget authority in millions of current dollars)
FY2009 Approp. Nuclear Energy (selected programs) University programs Nuclear Power 2010 Generation IV Nuclear Systems Reactor Concepts Nuclear Hydrogen Initiative Fuel Cycle R&D Nuclear Energy Enabling Technologies International Nuclear Power Programs Radiological Facilities Management Idaho Facilities Management Program Direction Total, Nuclear Energya Civilian Nuclear Waste Disposalb a. b. 66.1 140.0 73.0 791.4 288.4 72.0 173.0 73.0 786.6 196.8 7.4 142.6 0 136.0 5.0 177.5 178.6 5.0 105.0 220.1 5.0 0 0 195.0 0 201.0 99.3 3.0 66.8 162.5 91.5 824.1 0 FY2010 Approp. FY2011 Request
Excludes funding provided under other accounts. Funded by a 1-mill-per-kilowatt-hour fee on nuclear power, plus appropriations for defense waste disposal and homeland security.
Congressional Research Service
26
Nuclear Energy Policy
Legislation in the 111th Congress
H.R. 513 (Forbes)
New Manhattan Project for Energy Independence. Establishes program to develop new energyrelated technologies, including treatment of nuclear waste. Introduced January 14, 2009; referred to Committee on Science and Technology.
H.R. 1698 (Van Hollen)
Establishes a Green Bank to finance qualified clean energy projects. Nuclear power projects could receive financing only after exhausting all other existing federal financial support. Introduced March 24, 2009; referred to Committees on Ways and Means and Energy and Commerce.
H.R. 1812 (Bachmann)
Promoting New American Energy Act of 2009. Provides tax benefits for investments in nuclear power plants and other energy investments. Introduced March 31, 2009; referred to Committee on Ways and Means.
H.R. 1936 (Lowey)
Nuclear Power Licensing Reform Act of 2009. Expands requirements for nuclear plant evacuation plans from a 10-mile radius to a 50-mile radius and makes reactor license renewals subject to the same criteria as a new plant. Introduced April 2, 2009; referred to Committee on Energy and Commerce.
H.R. 1937 (Lowey)
Requires NRC to distribute safety-related fines imposed on a nuclear plant to surrounding counties to help pay for emergency planning. Introduced April 2, 2009; referred to Committee on Energy and Commerce.
H.R. 2454 (Waxman)
American Clean Energy and Security Act. Modifies DOE loan guarantee program and establishes Clean Energy Deployment Administration to administer DOE assistance, including loan guarantees, for nuclear energy and other energy technologies. Establishes cap-and-trade program for carbon dioxide emissions. Introduced May 15, 2009, referred to multiple committees. Reported by Committee on Energy and Commerce June 5, 2009 (H.Rept. 111-137, part I). Passed by House June 26, 2009, by vote of 219-212.
Congressional Research Service
27
Nuclear Energy Policy
H.R. 2768 (Wamp)
Declares that any reference to clean energy in federal law shall be considered to include nuclear energy. Introduced June 9, 2009; referred to Committee on Energy and Commerce.
H.R. 2828 (Bishop)
American Energy Innovation Act. Amends EPACT Title XVII loan guarantee provisions, modifies DOE standby support program for new reactors, reauthorizes the Nuclear Power 2010 program, establishes a tax credit for investments in manufacturing capacity for nuclear plant components, allows the Nuclear Waste Fund to be used for spent fuel reprocessing, modifies reactor licensing requirements, establishes an investment tax credit for nuclear power plants, authorizes temporary spent fuel storage agreements, requires DOE to offer to settle lawsuits for nuclear waste disposal delays, prohibits NRC from considering nuclear waste storage when licensing new nuclear facilities, and prohibits new waste facilities authorized under the act from being located in Nevada. Introduced June 11, 2009; referred to multiple committees.
H.R. 2846 (Boehner)
American Energy Act. Requires expedited procedures for nuclear plant licensing, establishes goal of licensing 100 new reactors by 2030, establishes uranium reserve, requires continued development of the Yucca Mountain repository unless it is found scientifically unsuitable, removes the statutory limit on Yucca Mountain disposal capacity, allows the Nuclear Waste Fund to be used for reprocessing, requires NRC to determine that sufficient waste disposal capacity will be available for proposed new reactors, establishes a National Nuclear Energy Council to advise the Secretary of Energy, and provides investment tax credit for nuclear power plants. Introduced June 12, 2009; referred to multiple committees.
H.R. 3009 (Ross)
American-Made Energy Act of 2009. Establishes American-Made Energy Trust Fund and includes nuclear power among technologies eligible for expenditures from the fund. Introduced June 23, 2009; referred to Committee on Energy and Commerce.
H.R. 3183 (Pastor)
Energy and Water Development Appropriations Act for FY2010. Includes funding for DOE nuclear energy programs. Introduced July 13, 2009; signed into law October 28, 2009 (see CRS FY2010 Status Table of Appropriations, http://www.crs.gov/Pages/appover.aspx).
H.R. 3385 (Barton)
Authorizes DOE to use the Nuclear Waste Fund to pay for grants or long-term contracts for spent nuclear fuel recycling or reprocessing and places the Waste Fund off-budget. Introduced July 29, 2009; referred to committees on Energy and Commerce and the Budget.
Congressional Research Service
28
Nuclear Energy Policy
H.R. 3448 (Pitts)
Streamline America’s Future Energy Nuclear Act. Requires NRC to establish expedited nuclear plant licensing procedures, requires NRC to reduce the time required to certify new reactor designs by half, requires NRC to develop technology-neutral guidelines for nuclear plant licensing, establishes a National Nuclear Energy Council to advise the Secretary of Energy, authorizes a final year of appropriations for the Nuclear Power 2010 program, requires DOE to prepare a schedule for accelerating completion of the Next Generation Nuclear Plant from 2021 to 2015, and limits fees and procedural restrictions on uranium mining on federal lands. Introduced July 31, 2009; referred to Committees on Energy and Commerce and Natural Resources.
H.R. 3505 (Gary Miller)
American Energy Production and Price Reduction Act. Prohibits NRC from considering nuclear waste storage when licensing new nuclear facilities and establishes investment tax credit for the costs of obtaining a nuclear manufacturing certification from the American Society of Mechanical Engineers. Introduced July 31, 2009; referred to multiple committees.
H.R. 4741 (Fattah)
Clean Energy Act of 2010. Revises loan guarantee authority under EPACT05, authorizes DOE cooperative agreements for licensing small modular reactors, and authorizes funding for research on spent nuclear fuel recycling and advanced reactors. Introduced March 3, 2010; referred to multiple committees.
S. 591 (Reid)
National Commission on High-Level Radioactive Waste and Spent Nuclear Fuel Establishment Act of 2009. Establishes a commission to recommend alternative nuclear waste management options in the event that the proposed Yucca Mountain, NV, repository does not become operational. Introduced March 12, 2009; referred to Committee on Environment and Public Works.
S. 807 (Nelson)
SMART Energy Act. Authorizes funds for NRC to expedite nuclear plant license applications, authorizes nuclear workforce training program, establishes interagency working group to increase U.S. nuclear plant component manufacturing base, authorizes construction of a spent nuclear fuel recycling development facility, modifies the Standby Support program for new reactors, modifies the EPACT loan guarantee program, expands the nuclear power production tax credit, and provides accelerated depreciation for new reactors. Introduced April 2, 2009; referred to Committee on Finance.
S. 861 (Graham)
Rebating America’s Deposits Act. Requires the President to certify that the Yucca Mountain site continues to be the designated location for a nuclear waste repository under the Nuclear Waste
Congressional Research Service
29
Nuclear Energy Policy
Policy Act. If such a certification is not made within 30 days after enactment or is subsequently revoked, the Treasury is to refund all payments, plus interest, made by nuclear reactor owners to the Nuclear Waste Fund. DOE is to begin shipping defense-related high-level radioactive waste to Yucca Mountain by 2017 or pay $1 million per day to each state in which such waste is located. Introduced April 22, 2009; referred to Committee on Energy and Natural Resources.
S. 1333 (Barrasso)
Clean, Affordable, and Reliable Energy Act of 2009. Includes provisions to take the Nuclear Waste Fund off-budget, authorize DOE to use the Nuclear Waste Fund to pay for grants or longterm contracts for spent nuclear fuel recycling or reprocessing, and prohibit NRC from denying licenses for new nuclear facilities because of a lack of waste disposal capacity. Introduced June 24, 2009; referred to Committee on Finance.
S. 1462 (Bingaman)
American Clean Energy Leadership Act of 2009. Establishes Clean Energy Deployment Administration to administer DOE assistance, including loan guarantees, for nuclear energy and other energy technologies. Establishes a national commission to study nuclear waste management alternatives and requirements for nuclear fuel cycle research. Introduced and reported as an original measure from the Committee on Energy and Natural Resources July 16, 2009 (S.Rept. 111-48).
S. 1733 (Kerry)
Clean Energy Jobs and American Power Act. Authorizes programs for nuclear worker training, nuclear safety, and nuclear waste research. Establishes a carbon dioxide cap-and-trade program. Introduced September 30, 2009; referred to Committee on Environment and Public Works. Ordered reported November 5, 2009 (S.Rept. 111-121).
S. 2052 (Mark Udall)/H.R. 5163 (Altmire)
Nuclear Energy Research Initiative Improvement Act. Authorizes DOE research to reduce nuclear reactor manufacturing and construction costs, including research on small modular reactors. Senate bill introduced October 29, 2009; referred to Committee on Energy and Natural Resources. Hearing held (S.Hrg. 111-375). House bill introduced April 28, 2010; referred to Committee on Science and Technology.
S. 2776 (Alexander)
Clean Energy Act of 2009. Revises DOE loan guarantee program, authorizes DOE assistance for small modular reactors, requires NRC to consider waste disposal to be adequate for potential new reactors, and authorizes funding for nuclear workforce development and research. Introduced November 16, 2009; referred to Committee on Energy and Natural Resources.
Congressional Research Service
30
Nuclear Energy Policy
S. 2812 (Bingaman)/H.R. 5164 (Altmire)
Nuclear Power 2021 Act. Establishes a cost-shared program between DOE and the nuclear industry to develop and license standard designs for two reactors below 300 megawatts of electric generating capacity. Senate bill introduced November 20, 2009; referred to Committee on Energy and Natural Resources. Hearing held (S.Hrg. 111-375). House bill introduced April 28, 2010; referred to committees on Energy and Commerce and Science and Technology.
S. 3060 (Hatch)
Thorium Energy Security Act of 2010. Authorizes regulations and demonstration projects for thorium-fueled reactors. Introduced March 3, 2010; referred to Committee on Energy and Natural Resources.
S. 3322 (Voinovich)
United States Nuclear Fuel Management Corporation Establishment Act of 2010. Establishes a government corporation to take over DOE responsibility for managing spent nuclear fuel and high-level waste and to develop reprocessing facilities. Introduced May 6, 2010; referred to Committee on Committee on Environment and Public Works.
Author Contact Information
Mark Holt Specialist in Energy Policy mholt@crs.loc.gov, 7-1704
Congressional Research Service
31
You May Also Find These Documents Helpful
-
Nuclear power is produced through the use of nuclear reactions to produce nuclear energy that can then be harnessed to generate heat and create superheated steam to drive turbines. The most common nuclear reaction is that of nuclear fission, which is the splitting of an atom’s nucleus into smaller nuclei. Nuclear reactions are incredibly energy dense and thus allow nuclear reactors to make a tremendous amount of electricity. There are only 61 nuclear power plants in the United States, but they account for 19 percent of the entire country’s electricity production. [8][14] There are 7,304 total power plants in the United States, so nuclear plants on average produce over twenty-eight times as much energy as another plant in the U.S.…
- 730 Words
- 3 Pages
Good Essays -
Global nuclear power plants and its industry have been a high expense for government subsidies,tax credit, or any form of public support in favor of the industry. A half century later, we have noticed that nuclear power is, instead, too expensive to finance. The first generation of nuclear power plants proved so costly to build that half of them were abandoned during construction. In addition , huge cost overruns are discovered which were passed on to utility customers…
- 530 Words
- 3 Pages
Good Essays -
Total Study Time: 150 hours, comprising 40 classroom hours and 110 hours of personal study.…
- 3093 Words
- 13 Pages
Powerful Essays -
Global warming is a gradual increase in the overall temperature of the Earth’s atmosphere, creating the greenhouse effect, caused by the increased of Carbon dioxide, Chlorofluorocarbons, and pollutants that was made by us humans. For centuries, the argument of Global warming has been about it being a myth or a fact, but scientist today has proved the existent of Global warming and there is no way to stop it. The one and only thing we human can do is to slow Global warming down. Many argues that Nuclear Power is a near perfect substituted in the place of burning fossil fuels because Nuclear Power does not create nearly as much Carbon dioxide, while others argues that the government have no actual plan for Nuclear Power Plant, and even if they did, the Nuclear Power Plant would be a massive target for terrorist attack. As the argument rages on, one might think that ‘Is Nuclear Power really the solution to Global Warming, or the actual solution is completely something else’.…
- 1022 Words
- 5 Pages
Good Essays -
As opposed to an either/or approach, use your thesis statement (place it as the last sentence of the introduction) to clearly select either nuclear or coal and then use the arguments in your paper to support that position.…
- 720 Words
- 3 Pages
Good Essays -
campaign to revive nuclear power in the United States. We are being told that nuclear…
- 541 Words
- 3 Pages
Good Essays -
No new nuclear power plants should be built because the increasing energy demand in the United States can be met with less negative environmental impact with power generated by renewable sources such as wind, solar, and tidal power. The “zero emissions” benefit of nuclear energy is a common misconception. The actual reaction in a nuclear power plant only creates steam and radioactive waste; it does not produce greenhouse gasses or particulate matter that the combustion of fossil fuels creates. But, due to reliance on existing fossil-fuel power for plant construction, decommissioning, and fuel processing as well as the mining, enrichment, and transport of uranium, the nuclear…
- 2071 Words
- 9 Pages
Powerful Essays -
While there is no doubting that solar and wind will create jobs and bring in its own income, ultimately nuclear power will be more beneficial for the United States. In order to bring wind generated energy production up the tax payer will pay a heavy price, to raise the wind energy production level from just 1.5% to 4% over the next ten years it will cost at least $29 billion in federal subsidies (Alexander). Nuclear power is better suited for the economy as it is a cheaply produced source of energy, yet the United States is not capitalizing on it. This lack of nuclear energy investment on the United States is resulting in other countries to capture the benefits of this cheap energy source; China, Russia and Japan are all cashing in on nuclear power for its cheap energy. The benefit of cheap energy is that energy intensive industries have an incentive to set up sites using nuclear energy for the lessened power bill they have to pay. If other countries continue to produce cheap energy American industries may want to consider moving to these countries with lower energy costs. If businesses move over seas the United States losses jobs to other countries and we are no better…
- 641 Words
- 3 Pages
Good Essays -
The invention of electricity, to many, can be considered one of the greatest inventions by humanity, behind writing and the wheel. From its first discovery in the 1600s till present day, electricity has fascinated the minds of scientist everywhere. Over time society has been established with a very high dependency on this commodity. Imagine our world today without electricity or any of the inventions derived from it. Modern societies would have taken a much different path. Last year the International Energy Agency conducted a survey on the energy statistics for over 30 of the more developed countries. Around 62 percent of the energy produced worldwide was created from combustible fuel source (Monthly Electricity Statistics). When combustible fuel is burned, carbon and other harmful byproducts are released into the atmosphere. This brings about environmental injustice since every living organism in contact with the atmosphere now suffers the consequences which the few benefit from. While I believe this is the more grave concern regarding electricity, the majority of the modernized world might not have an equivalent conclusion.…
- 3119 Words
- 13 Pages
Best Essays -
Nuclear Power is reliable yet controversial source of energy in the U.S. Many people have different viewpoints on Nuclear energy. Although nuclear energy can cause many problems such as nuclear accidents, it saves money, produces less pollution, and it can be made in any environment. The benefits of nuclear energy outweigh the risks. Without nuclear energy we would be relying on the weather for energy.…
- 347 Words
- 2 Pages
Good Essays -
Throughout the world, countries are leaning towards nuclear energy due to the amount of energy it can produce with very little resources. This topic is worth investigating since energy is basically a must, now in the 21st century. It is now considered an essential to have energy in our lives to maintain our standards of living. We have gone to many different sources of energy other than nuclear energy such as coal, solar, wind, oil and more, but many of those energy source have flaws too. Some sources of energy will reach the peak of their production due to resources and will eventually fall, others pollute the environment just like nuclear energy and some just don’t produce enough energy for us to fully rely on them. Many countries needed a new source of energy since…
- 791 Words
- 4 Pages
Good Essays -
2. Nuclear Fission :- In nuclear physics and nuclear chemistry, nuclear fission is a nuclear reaction in which the nucleus of an atom splits into smaller parts (lighter nuclei), often producing free neutrons and photons (in the form of gamma rays), and releasing a tremendous amount of energy. The two nuclei produced are most often of comparable size, typically with a mass ratio around 3:2 for common fissile isotopes.[1][2].The smallest of these ranges in size from a proton to an argon nucleus. Fission of heavy elements is an exothermic reaction which can release large amounts. Fission is a form of nuclear transmutation because the resulting fragments are not the same element as the original atom. Nuclear fission produces energy for nuclear power and to drive the explosion of nuclear weapons.…
- 957 Words
- 4 Pages
Good Essays -
Create an outline for the Debate Paper that will be used to write the paper. Include all references to be used in the paper.…
- 407 Words
- 2 Pages
Satisfactory Essays -
Mufson, S. (2012, February 09). NRC approves construction of new nuclear power reactors in Georgia. Retrieved from http://www.washingtonpost.com/business/economy/nrc-approves-construction-of-new-nuclear-power-reactors-in-georgia/2012/02/09/gIQA36wv1Q_story.html…
- 569 Words
- 3 Pages
Satisfactory Essays -
These days, it seems like everyone is worried about how the world will meet its energy demands when we don’t have oil and natural gas. Scientists and researchers are investigating such power sources as solar energy, wind energy, and even energy new kind of energy shale gas recources . However, there is one energy source that I believe should not be developed anymore. In fact, I believe that we should stop using it as soon as possible. Even though it can provide the world with a source of electricity, nuclear power is not a good energy source because it is too expensive, the materials used in the power stations are not safe, and there is a great possibility of accidents.…
- 659 Words
- 2 Pages
Good Essays