1. Receiving Cooler – Lock 2 dock doors and check blast freezer emergency exit. Shut off lights in maintenance ship electrical panel LP-1 Breaker #1, 3, & 8. Check receiving office entrance door.
2. Check potato bin room emergency exit door and lock Spudnik garage door.
3. Egg Room – Shut off raw potato lights on panel CIP-2 Breaker #2, 4, 44, & 46. Shut off egg room lights on switch outside of the room.
4. Soup Prep Staging – Shut off 3 light switches on south wall for soup prep, USDA, and staging area.
5. Compressor Room – Shut off both air compressors and room lights.
6. Specialties – Shut off room lights. Switches by QA Office and Boot Room entrance. Shut off Koruma Room lights by Koruma doorway.
7. …show more content…
Retort Finish – Shut off 4 light switches in retort mechanical room by the doorway.
8. BFI – Close and lock 2 BFI garage doors. Shut off lights by doorway.
9. Dry Warehouse – turn off skid pad door breaker on Panel PP-2 Breaker #13. Turn off lights in Panel LP-2 Breaker #1, 3, 4, 6, 7, 9, 11, 12, & 19. Check man door and lock 3 dock doors.
10. Shipping – Check 2 emergency exit doors (south wall and west wall). Lock 8 dock doors and check entrance man door. Shut off lights on Panel LP-1 under stairs Breaker #1, 3, 5, 7, 9, & 11.
11. Cabbage Cooler – Shut off hot water heater. Check man door on north wall. Shut off lights by Rytec door.
12. Vegetable Receiving Cooler – Lock dumpster garage door & dock door. Check man door. Shut off lights by doorway.
13. Raw Slaw Room – Shut off lights by doorway.
14. Slaw – Shut off lights by Rytec door. Shut off slaw staging cooler lights on east