Paper Solved
Fourth term End term exam 2011 (1)
Section B
2. b
From a factory producing metal sheet, following defective were analyses in every lot size. Prepare relevant chart only UCL and LCL. Lot Size | 100 | 125 | 90 | 120 | 110 | Defective | 6 | 7 | 4 | 8 | 10 |

Solution
Since the Lot size are different we have to use ‘u’ chart. Sample NO | LOT Size | Defective | Proportion of defective | UCL | LCL | 1 | 100 | 6 | 0.06 | 0.140245 | -0.0118 | 2 | 125 | 7 | 0.056 | 0.06422 | -0.00378 | 3 | 90 | 4 | 0.04 | 0.144358 | -0.01592 | 4 | 120 | 8 | 0.066666667 | 0.133621 | -0.00518 | 5 | 110 | 10 | 0.090909091 | 0.136707 | -0.00827 | Total | 545 | 35 | | | |

u =sum of defects in all lots / total number of items in all lots
= 35/545 = 0.064
UCL = u + 3√(u/ni)
LCL = u - 3√(u/ni)
UCL always <1.0
And LCL always >0
Since here all the LCL value <0 we have to ignore LCL values.

Proportion of Defective
Proportion of Defective
Lot
Lot
Center Line (u)
Center Line (u)

4. a) Topaz Industries manufactures Z brand radar scanner used to detect speed traps. The printed circuit boards in the scanners are purchased from an outside vendor. The vendor produces the boards to an AQL of 2% defective and is willing to run 5% risk(alpha) of having lots of this level or fewer defectives rejected. Topaz’s consider lot of 8% or more defective lot tolerance unacceptable and time. A large shipment has just been delivered. what values of n and c should be selected to determine the quality of this lot?
Solution:

The negotiated consumer’s and producer’s risks, corresponding to LTPD 8% and AQL of 2%, are 10% and 5% each.

Therefore P0.10/P0.95 = 0.08/0.02 = 4
Therefore c = 4 gives the best fit.

Now as per the table, the sample size can be calculated at the producer’s risk point : np0.95 =1.970 n= 1.970/0.02 = 98.5=99
Therefore the sampling plan is (99,4)

6) Elisa watches assemble four different types of watches on their assembly line. The assembly line in done in batches. Given the following data, in what batch sizes should each type of watch be produced? The company has 300 working days in a year. Find economic batch quantity? Watch | Annual dd - Unit | Set up cost(Per set up) | Carrying cost per unit per yr | Assembling rate(no/day) | TAG-H | 9000 | 1000 | 40 | 100 | TITAN | 5000 | 1000 | 50 | 120 | GUCCI | 10000 | 1000 | 120 | 100 | FOSSIL | 3000 | 1000 | 30 | 90 |

Solution:
There are 300 working days in a year.
Based on the above given information, following gives the rates of consumption of the products, the economic batch quantitates for each watch, the days for which a manufactured batch will last at the given consumption rate and the individual production times for each batch of product (along with the total time for production for a batch-each of the entire range of products). I | II | III | IV | V | VI | VII | VIII | Watch | Annual dd | Assembling rate(unit/day) | Daily consumption rate(unit/day) | Economic Batch Quantity | No of days required to produce a batch quantity | No of days required to manufacture annual requirements | No of days taken to consume a batch quantity | TAG-H | 9000 | 100 | 30 | 670.8204 | 6.708 | 90 | 22.36 | TITAN | 5000 | 120 | 16.6666 | 447.2136 | 3.726 | 41.66 | 26.83 | GUCCI | 10000 | 100 | 33.33333 | 408.2483 | 4.08 | 100 | 12.24 | FOSSIL | 3000 | 90 | 10 | 447.2136 | 4.96 | 33.33 | 44.72 | Total | 19.48 | 265 | |

Calculation of Daily consumption rate by the formula Column II / 300
Calculation of EBQ = √(2 X Annual dd X Setup Cost) / Carrying cost
Calculation of No of days required to produce a batch quantity = Column V/ Column III
Calculation of No of days required to manufacture annual requirements = Column II/ Column III
Calculation of No of days taken to consume a batch quantity = Column V/ Column IV

Above table gives the total production days required to manufacture the entire annual requirement of all 4 watches as 26, whereas the total number of production days available are 300. Therefore the aggregate capacity seems to be sufficient for the manufacture of the annual requirement of all the watches. But, the total number of production days required, if an economic batch quantity of each of the products was produced, is 19.48 days. In other words, 19.48 days of the production cycle are required if each of the products is produced once in the amount as required by the economic batch quantity formula. We observe in the above table that, for watch GUCCI the number of days to consume such as EBQ is less than 19.48. That means in a situation when a batch of the entire range of watches is to be manufactured the watch GUCCI will experience shortage because it will have been consumes fully much before the completion of the 19.48 days.

PGP/FW/2009-11
FOURTH TRIMESTER END TERM EXAMINATION 2011 (2)

Question 2(b)
A continuous time study was made of a job that was broken down in to live elements with the following results (times are in minutes). The allowance factor is 10% (i) What is the standard time to do the job (ii) what is the per piece rate in case the worker is paid Rs200 per day:- Element | Cycle | Performance Rating (%) | | 1 | 2 | 3 | 4 | 5 | | A | 0.16 | 1.37 | 2.10 | 2.80 | 4.00 | 80 | B | 0.37 | 1.58 | 2.33 | 3.00 | 4.22 | 90 | C | 0.57 | 1.80 | 2.51 | 3.20 | 4.42 | 110 | D | 1.20 | 1.93 | 2.65 | 3.84 | 4.85 | 100 |

Solution: Element | Cycle | Performance Rating (%) | Arithmetic Average | Normal Time for Element Minutes | | 1 | 2 | 3 | 4 | 5 | | | | A | 0.16 | 1.37 | 2.10 | 2.80 | 4.00 | 80 | 2.086 | 1.6688 | B | 0.37 | 1.58 | 2.33 | 3.00 | 4.22 | 90 | 2.3 | 2.07 | C | 0.57 | 1.80 | 2.51 | 3.20 | 4.42 | 110 | 2.5 | 2.75 | D | 1.20 | 1.93 | 2.65 | 3.84 | 4.85 | 100 | 2.894 | 2.894 | Total | 9.3828 |

Normal time = (Arithmetic Average of the Recorded time X Performance Rating Expressed in percentage with 100% as the ‘accepted’ performance) / 100

Standard Time = Normal Time / (1 – Total Allowance expressed as a fraction)

Therefore Standard Time = 9.38 / (1 – 0.10) = 10.425 minutes

Working Time = 60 X 8 = 480 Minutes
No of piece can be made 480 / 10.425 = 46.04
Daily payment = Rs 200
Per piece rate = 200 / 46.04 = Rs 4.34

Question 3(a)
You are given the values of sample means (X bar) and the ranges (R) for the ten samples of size 5 each.

Sample | | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | X | : | 43 | 49 | 37 | 44 | 45 | 37 | 51 | 46 | 43 | 47 | R | : | 5 | 6 | 5 | 7 | 7 | 4 | 8 | 6 | 4 | 6 |

Calculate the LCL, UCL and CL for the Mean chart and the Range Chart without drawing a graph comment if the process is in control.
Further given that for N=5 | A2=0.577 | c2=0.8407 | d2=2.326 | d3=0.864 | D3=0 | D4=2.115 |

Solution: Sample | Total | | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | | X | : | 43 | 49 | 37 | 44 | 45 | 37 | 51 | 46 | 43 | 47 | ∑X = 442 | R | : | 5 | 6 | 5 | 7 | 7 | 4 | 8 | 6 | 4 | 6 | ∑R = 58 |

X = ∑X/10 = 442/10 = 44.2
R = ∑Rn = 5810 =5.8

From the given table for a sample size 5, A2=0.58, D3=0 D4=2.11

UCL for X = X + A2 R = 44.2 +(0.58*5.8) = 47.564
LCL for X = X - A2 R = 44.2 - (0.58*5.8) = 40.836
CL for X = 44.2
CL for R = 5.8
UCL for R = D4R = 2.11 X 5.8 = 12.238
LCL for R = 0

According to above calculation are compared with these tentative limits. Sample 2 is above the UCL. This means that the process is not stable during the base period.
Question 5(b)
Use factor rating method to find the best location. The sites have been rated on a scale of 1 – 100 (100 being extremely good) | Factors | Importance Rating | Site 1 | Site 2 | Site 3 | 1 | Cost of Land | 4 | 50 | 80 | 90 | 2 | Closeness to customers with in Paris | 2 | 90 | 70 | 20 | 3 | Access to Motorways | 1 | 90 | 70 | 50 | 4 | Access to Airport | 1 | 80 | 60 | 60 | 5 | Availability of Hotel Accommodation | 1 | 80 | 70 | 60 | 6 | Local Taxes | 1 | 20 | 60 | 90 | 7 | Expansion Possibilities | 1 | 50 | 70 | 90 |

Solution: | Factors | Rating(1) | Site 1 | Site 2 | Site 3 | | | | (Rating)(2) | Total1 * 2 | Rating(3) | Total1 * 3 | Rating (4) | Total1 * 4 | 1 | Cost of land | 4 | 50 | 200 | 80 | 320 | 90 | 360 | 2 | Closeness to customers with in Paris | 2 | 90 | 180 | 70 | 140 | 20 | 40 | 3 | Access to Motorways | 1 | 90 | 90 | 70 | 70 | 50 | 70 | 4 | Access to Airport | 1 | 80 | 80 | 60 | 60 | 60 | 60 | 5 | Availability of Hotel Accommodation | 1 | 80 | 80 | 70 | 70 | 60 | 60 | 6 | Local Taxes | 1 | 20 | 20 | 60 | 60 | 90 | 90 | 7 | Expansion Possibilities | 1 | 50 | 50 | 70 | 70 | 90 | 90 | | | | | 700 | | 790 | | 770 |

The total score for Site 2 is higher than that of Site 1 and Site 3. Hence Site 2, is the best choice.

Question 7(a)
The processing time and due dates for 5 jobs are given below Jobs | Processing times (Days) | Due Date (Days from present) | A | 20 | 100 | B | 28 | 70 | C | 12 | 52 | D | 36 | 110 | E | 8 | 58 |

Find our average flow/wait and average delay by using the (i) Shortest processing(operating) time rule. (ii) Earliest due date rule. (iii) FCFS rule. Comment as to which rule is better.
Solution:

(i) The SPT rule results in the sequence B-D-A-C-E. Orders are sequenced according to processing time, with the highest priority given to shortest job.

Jobs | Processing Time | Flow Time | Due Date | Delay | E | 8 | 8 | 58 | 0 | C | 12 | 20 | 52 | 0 | A | 20 | 40 | 100 | 0 | B | 28 | 68 | 70 | 0 | D | 36 | 104 | 110 | 0 | | 104 | 240 | | 0 |

The Shortest Processing Time results in the following measures of effectiveness:
Average flow time = 240/5= 48 days
Average delay time 0/5 =0

(ii) The EDD rule gives the sequence C-E-B-A-D. Note that jobs are ordered earliest due date first. Jobs | Processing Time | Flow Time | Due Date | Delay | C | 12 | 12 | 52 | 0 | E | 8 | 20 | 58 | 0 | B | 28 | 48 | 70 | 0 | A | 20 | 68 | 100 | 0 | D | 36 | 104 | 110 | 0 | | 104 | 252 | | 0 |

The Earliest Due Date rule results in the following measures of effectiveness
Average Flow time = Total flow time / no of jobs = 252/5 = 50.4
Average job delays = total delays days/ no of jobs = 0/5 = 0 (ii) The FCFS sequence is simply A-B-C-D-E. The "flow time" in the system for this sequence measures the time each jobs depends waiting plus being processed.

Jobs | Processing Time | Flow Time | Due Date | Delay | A | 20 | 20 | 100 | 0 | B | 28 | 48 | 70 | 0 | C | 12 | 60 | 52 | 8 | D | 36 | 96 | 110 | 0 | E | 8 | 104 | 58 | 46 | | 104 | 328 | | 54 |

(iii) The First Come First Serve rule (FCFS)results in the following measures of effectiveness:
Average Flow time = Total Flow Time / No of Jobs = 328 days/5 = 65.6 days
Average delay = Total delays days / No of Jobs = 54/5 = 10.8 days
Shortest processing time is generally the best technique for minimizing job flow and minimizing the average number of jobs in the system. Its chief disadvantage is that long-duration jobs may be continuously pushed back in priority in favor of short-duration jobs. Customers may view this dimly, and a periodic adjustment for longer jobs has been made.

Question 7(b)
A TV manufacturing company produces 2000 TV sets in a year for which it needs an equal number of tubes of a certain type. Each tube costs Rs 10 and the cost to hold a tube in stock in a year is Rs 2.40. Besides, the cost of placing an order is Rs150, which is not related to its size. i) Determine EOQ and total inventory cost. ii) If the demand increase by 25% what is the new EOQ and the new Total Cost.
Solution:
Consumption of Tube in a year = 2000 units = C
Cost of placing an order = Rs 150 = O
Purchase price per unit of Tube = Rs 10
Storage cost = Rs 2.4 = S
EOQ = √{2CO/S} =√{2*2000*150/2.4} = 500

PGP/SS/2009-11
FOURTH TRIMESTER END TERM EXAM 2010 (3)
Question 2
The measurement on diameter of bolts, as number of 0.0001 cms above 1.90cms, is given in the following table representing 10 samples with 5 observations in each sample. Prepare control charts for (i) mean, (ii) range. Determine whether the process is under control in each case. (You don’t need to calculate revised limits or draw the revised graph)

Sample No | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | Measurement | 88 | 86 | 83 | 88 | 73 | 78 | 83 | 75 | 70 | 75 | | 78 | 91 | 65 | 88 | 80 | 86 | 80 | 88 | 80 | 75 | | 70 | 78 | 73 | 73 | 73 | 78 | 73 | 80 | 86 | 73 | | 88 | 86 | 63 | 88 | 70 | 80 | 65 | 60 | 73 | 86 | | 65 | 68 | 75 | 68 | 70 | 63 | 75 | 65 | 75 | 86 | Mean Value | 77.8 | 81.8 | 71.8 | 81 | 73.2 | 77 | 75.2 | 73.6 | 76.8 | 79 | Range Value | 23 | 23 | 20 | 20 | 10 | 23 | 18 | 28 | 16 | 13 |

Further given that for N=5 | A1=1.596 | A2=0.577 | c2=0.8407 | d2=2.326 | d3=0.864 | D3=0 | D4=2.115 |

Solution: Sample | Total | | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | | X | : | 77.8 | 81.8 | 71.8 | 81 | 73.2 | 77 | 75.2 | 73.6 | 76.8 | 79 | ∑X = 767.2 | R | : | 23 | 23 | 20 | 20 | 10 | 23 | 18 | 28 | 16 | 13 | ∑R = 194 |

X = ∑X/10 = 767.2/10 = 76.72
R = ∑Rn = 19410 =19.4

From the given table for a sample size 5, A2=0.58, D3=0 D4=2.11

UCL for X = X + A2 R = 76.72+(0.58*19.4) = 87.97
LCL for X = X - A2 R = 76.72 - (0.58*19.4) = 65.46
CL for X = 76.72
CL for R = 19.4
UCL for R = D4R = 2.11 X 19.4 = 40.93
LCL for R = 0

According to above calculation are compared with these tentative limits. Sample 1,Sample 2 and Sample 10 are above the UCL. This means that the process is not stable during the base period.

Question 3
Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart for control. The samples and the number of defectives in each are shown here:- Sample | n | Number of defectives in the sample | 1 | 15 | 3 | 2 | 15 | 1 | 3 | 15 | 0 | 4 | 15 | 0 | 5 | 15 | 0 | 6 | 15 | 2 | 7 | 15 | 0 | 8 | 15 | 3 | 9 | 15 | 1 | 10 | 15 | 0 |
Plot the 10 samples and comment if the process is in control. Give appropriate reason for your comment.

Solution: p-Chart | | | | | | | | | | | | Input: | | Output: | | | No. of samples | 10 | | p = | | 0.07 | | Sample size | 15 | | UCL = | 0.26 | | Sigma limits | 3 | | LCL = | 0.00 | | | | | | | | | | Calculations | | Number of | Proportion | | | | Sample | Defectives | Defective | p | | UCL | LCL | 1 | 3 | 0.200 | 0.07 | 0.2599 | 0.0000 | 2 | 1 | 0.067 | 0.07 | 0.2599 | 0.0000 | 3 | 0 | 0.000 | 0.07 | 0.2599 | 0.0000 | 4 | 0 | 0.000 | 0.07 | 0.2599 | 0.0000 | 5 | 0 | 0.000 | 0.07 | 0.2599 | 0.0000 | 6 | 2 | 0.133 | 0.07 | 0.2599 | 0.0000 | 7 | 0 | 0.000 | 0.07 | 0.2599 | 0.0000 | 8 | 3 | 0.200 | 0.07 | 0.2599 | 0.0000 | 9 | 1 | 0.067 | 0.07 | 0.2599 | 0.0000 | 10 | 0 | 0.000 | 0.07 | 0.2599 | 0.0000 | Total | 10 | | | | |

p-Chart Formulas | | | | | | | | | | |

Question 6(b)
A small manufacturing facility is being planned that will feed parts to three heavy manufacturing facilities. The location of the current plants with their coordinates and volume requirements are given in the following tables:- | | Co-Ordinates | Plant Location | Volume (Parts per year) | X | Y | Delhi | 2000 | 250 | 270 | Ahmedabad | 4000 | 325 | 420 | Bhopal | 1000 | 420 | 130 |

Use the Center of Gravity Method (Centroid Method) to determine the best location for this new facility.

Solution:
X = (250 X 2000 + 325 X 4000 + 420 X 1000) / 2000+4000+1000 = 2220000/7000= 317.14=317
Y=(270 X 2000 + 420 X 4000 + 130 X 1000) / 2000+4000+1000 = 2350000/7000 = 335.71 = 336

C
C
D
D
B
B
A
A

The best location for this new facility is the point D with co-ordinates(317,336)
Question 7 (b)
An operation consists of three elements subjected to a stop watch time study. Theraw data are contained in the following table. The allowance for the operation is 20%. (i) What is the standard time for the operation? What should be the standard in hrs per 1000 units job? (ii) if the worker is paid Rs 150 per day then what is the per unit rate? Job Element | Performance Rating (%) | Observation sec/element | | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 1 | 90 | 7 | 2 | 8 | 9 | 8 | 10 | 10 | 8 | 9 | 7 | 2 | 100 | 14 | 14 | 18 | 15 | 14 | 14 | 15 | 16 | 16 | 14 | 3 | 110 | 8 | 7 | 8 | 9 | 9 | 7 | 7 | 8 | 7 | 9 |

Solution: Job Element | Performance Rating (%) | Observation sec/element | Arithmetic Average | Normal Time for Element Minutes | | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | | | 1 | 90 | 7 | 2 | 8 | 9 | 8 | 10 | 10 | 8 | 9 | 7 | 7.8 | 7.02 | 2 | 100 | 14 | 14 | 18 | 15 | 14 | 14 | 15 | 16 | 16 | 14 | 15 | 15 | 3 | 110 | 8 | 7 | 8 | 9 | 9 | 7 | 7 | 8 | 7 | 9 | 7.9 | 8.69 | TOTAL | 30.71 |

Normal time = (Arithmetic Average of the Recorded time X Performance Rating Expressed in percentage with 100% as the ‘accepted’ performance) / 100

Standard Time = Normal Time / (1 – Total Allowance expressed as a fraction)

Therefore Standard Time = 30.71 / (1 – 0.20) = 38.38 minutes
Working Time = 60 X 8 = 480 Minutes
No of piece can be made 480 / 38.38 = 12.50
Daily payment = Rs 150
Per piece rate = 150 /12.50 = Rs 12

PGP/FW/2008-10
FOURTH TRIMESTER END TERM EXAM 2010 ------4

Question 3. Enumerate various factors for location selection for a production unit. Using Bridgeman’s method, suggest the suitability of a location on the following data: Factor | Location A | Location B | Weightage | 1. Cost of the Plot | Rs 350 Lakhs | Rs 415 Lakhs | 3 | 2. Labour Cost | Rs 25 Lakhs | Rs23Lakhs | 2 | 3. Power Cost | Rs 375 Lakhs | Rs315lakhs | 3 | 4. Material Cost | Rs 215 Lakhs | Rs240Lakhs | 4 | 5.Infrastructure | Rs 1015 Lakhs | Rs 960 Lakhs | 3 | 6. Political Climate | 4 | 3 | 4 | 7. Union Attitude | 3 | 3 | 3 | 8. Labour Attitude | 2 | 4 | 2 |

Solution:
For selecting best site for plant locations by using Bridgement’s dimensional analysis. In this method we compare pair-wise location in ratio with each other.
R12 = Preference for location 1 / Preference for location 2
R12 = X11X12W X X21X22W X X31X32W
Now we compare Location A and location B

R12 = (350/415)3 X (25/23)2 X (375/315)3 X (215/240)4 X (1015/960)3 X (4/3)4 X (3/3)3 X (2/4)2 = 0.599 X 1.18 X 1.68 X 0.644 X 1.18 X 3.16 X 1X 0.25 = 0.719
R12<1
Therefore Location A is better than Location B.

Question 4 (c)
With routing as Machine I to Machine II, draw the bar chart of scheduling the following orders on this work center using Johnson’s rule for sequencing the jobs:-

Processing time for | Job A | Job B | Job C | Job D | Job E | Machine I | 5 | 3 | 2 | 7 | 5 | Machine II | 7 | 2 | 7 | 1 | 9 | Solution:
Set the sequence that will minimise the total processing time for the five jobs:
Step 1 : The job with the shortest processing time is D, in Machine II (with a time of 1 hour).
Because it is at the second centre, schedule A last. | | | | D |

Step 2 : There is a tie(at 2) for the shortest remaining job. We can place C, which was on the Machine I, first.
Then B is placed in the last sequencing position. C | B | A | E | D |

Step 2 : There is again a tie(at 5) for the shortest remaining job. We can place A, which was on the Machine I, first. Then E is placed in the last sequencing position.
The sequential times are: Job | C | B | A | E | D |

Machine I | 2 | 3 | 5 | 5 | 7 | Machine II | 7 | 2 | 7 | 9 | 1 |

The Time-phased flow of this job sequence is illustrated graphically as below 0 2 5 10 15 22 Machine 1 | C | B | A | E | D | Idle | Machine 2 | Idle | C | B | A | E | D | 2 9 11 18 27 28

Question 5 (b)
With the help of following data, establish whether the process is in control or not (use Mean and Range chart for the purpose):-
Dimension Measured (cm) Sample No | Product 1 | Product 2 | Product3 | Product 4 | 1 | 9.61 | 9.65 | 9.55 | 9.58 | 2 | 9.70 | 9.65 | 9.57 | 9.59 | 3 | 9.80 | 9.75 | 9.81 | 9.80 | 4 | 9.75 | 9.78 | 9.82 | 9.50 | 5 | 9.65 | 9.67 | 9.80 | 9.75 |

Solution: Sample No | 1 | 2 | 3 | 4 | 5 | Total | Product 1 | 9.61 | 9.70 | 9.80 | 9.75 | 9.65 | | Product 2 | 9.65 | 9.65 | 9.75 | 9.78 | 9.67 | | Product 3 | 9.55 | 9.57 | 9.81 | 9.82 | 9.80 | | Product 4 | 9.58 | 9.59 | 9.80 | 9.50 | 9.75 | | X | 9.59 | 9.62 | 9.79 | 9.71 | 9.71 | 48.42 | R | 0.1 | 0.13 | 0.06 | 0.32 | 0.15 | 0.76 |

X = ∑X/5 = 48.425= 9.68
R = ∑Rn = 0.765 =0.152

From the given table for a sample size 4, A2=0.729, D3=0 D4=2.282

UCL for X = X + A2 R = 9.68+(0.729*0.152) = 9.79
LCL for X = X - A2 R = 9.68 - (0.729*0.152) = 9.56
CL for X = 9.68
CL for R = 0.152
UCL for R = D4R = 2.282 X 0.152 = 0.346
LCL for R = 0

the process is not stable during the base period.
Question6. (b)
Decide on the A, B and C categories of products based on the following data: Product | Unit Cost (in Rs) | Annual Consumption(In Rs) | A | 4.00 | 20000 | B | 3.50 | 60500 | C | 0.50 | 270300 | D | 175 | 150 | E | 215 | 450 | F | 7.15 | 25700 | G | 22.60 | 31500 | H | 11.50 | 500 | I | 10.00 | 2500 | J | 9.70 | 15700 | K | 3000 | 700 | L | 5.70 | 27500 |

PGP/FW/2008-10
FOURTH TRIMESTER END TERM EXAMINATION 2010 5

Question1)
Data for the number of defective electric fuses coming out from a plant are as follows. Develop a p-chart (OR) np chart a sample of size 100

SAMPLE | DEFECTIVES | SAMPLE | DEFECTIVES | 1 | 22 | 9 | 42 | 2 | 40 | 10 | 38 | 3 | 36 | 11 | 70 | 4 | 32 | 12 | 80 | 5 | 42 | 13 | 44 | 6 | 40 | 14 | 22 | 7 | 30 | 15 | 32 | 8 | 44 | | |

Plot the 15 sample and comment if the process in in control.
Solution:

p-Chart | | | | | | | | | | | | Input: | | Output: | | | No. of samples | 15 | | p = | | 0.41 | | Sample size | 100 | | UCL = | 0.56 | | Sigma limits | 3 | | LCL = | 0.26 | | | | | | | | | | Calculations | | Number of | Proportion | | | | Sample | Defectives | Defective | p | | UCL | LCL | 1 | 22 | 0.220 | 0.41 | 0.5568 | 0.2618 | 2 | 40 | 0.400 | 0.41 | 0.5568 | 0.2618 | 3 | 36 | 0.360 | 0.41 | 0.5568 | 0.2618 | 4 | 32 | 0.320 | 0.41 | 0.5568 | 0.2618 | 5 | 42 | 0.420 | 0.41 | 0.5568 | 0.2618 | 6 | 40 | 0.400 | 0.41 | 0.5568 | 0.2618 | 7 | 30 | 0.300 | 0.41 | 0.5568 | 0.2618 | 8 | 44 | 0.440 | 0.41 | 0.5568 | 0.2618 | 9 | 42 | 0.420 | 0.41 | 0.5568 | 0.2618 | 10 | 38 | 0.380 | 0.41 | 0.5568 | 0.2618 | 11 | 70 | 0.700 | 0.41 | 0.5568 | 0.2618 | 12 | 80 | 0.800 | 0.41 | 0.5568 | 0.2618 | 13 | 44 | 0.440 | 0.41 | 0.5568 | 0.2618 | 14 | 22 | 0.220 | 0.41 | 0.5568 | 0.2618 | 15 | 32 | 0.320 | 0.41 | 0.5568 | 0.2618 | Total | 614 | 6.140 | | | |

p-Chart Formulas | | | | | | | | | | |

Question5. b)
A continuous time study was made of a job that was broken down into live elements with the following results (time are in minutes):-

Element | Cycle | Performance Rating(%) | | 1 | 2 | 3 | 4 | 5 | | A | 4.16 | 4.37 | 4.10 | 4.80 | 4.00 | 120 | B | 2.37 | 2.58 | 2.33 | 3.00 | 2.22 | 90 | C | 3.57 | 3.80 | 3.51 | 3.20 | 3.42 | 110 | D | 1.20 | 1.93 | 1.65 | 1.84 | 1.85 | 80 |

Now calculate the standard time to do the job assuming an allowance factor of 10%.
Solution:
Element | Cycle | Performance Rating(%) | Arithmetic Average | Normal Time for Element Mints | | 1 | 2 | 3 | 4 | 5 | | | | A | 4.16 | 4.37 | 4.10 | 4.80 | 4.00 | 120 | 4.286 | 5.1432 | B | 2.37 | 2.58 | 2.33 | 3.00 | 2.22 | 90 | 2.5 | 2.25 | C | 3.57 | 3.80 | 3.51 | 3.20 | 3.42 | 110 | 3.5 | 3.85 | D | 1.20 | 1.93 | 1.65 | 1.84 | 1.85 | 80 | 1.694 | 1.3552 | Total | 12.59 |

Standard Time = 12.59 / (1 – 0.10) = 13.98 minutes

POST GRAGUATE PROGRAMME IN PLANNING AND ENTREPRENEURSHIP
PGP/SS/2008-10
TRIMESTER EXAM
3. a) A hospital buys medical consumables from several suppliers. The bad quality of consumables sometimes affects the hospital operations critically. Therefore there is a quality control routine that the hospital follows. Based on a weekly analysis of the quality of cotton and dressing material used in large quantities in the surgery section of the hospital, the following causes of defects were found out

Sl no | Description | Number of occurrences | 1 | Soiled and dirty | 23 | 2 | Cuts and discontinuities | 12 | 3 | Improper specifications | 19 | 4 | Weight Loss | 31 | 5 | Defective packing | 21 |

(i) Draw a histogram of the above problem for further analysis. (ii) Draw a Pareto diagram of the above data. Based on the Pareto diagram what course of action would you recommend?
Solution (i)

(iii) Pareto Diagram

Sl no | Description | Number of Occurrences | Percentage | Cumulative percentage | 4 | Weight loss | 31 | 29.24528302 | 29.24528302 | 1 | Soiled and dirty | 23 | 21.69811321 | 50.94339623 | 5 | Defective packing | 21 | 19.81132075 | 70.75471698 | 3 | Improper specifications | 19 | 17.9245283 | 88.67924528 | 2 | Cuts and discontinuities | 12 | 11.32075472 | 100 | | | 106 | | |

5. After the application of appropriate work simplification techniques, a direct time study of a simplified job was undertaken and the following time elements in minutes were obtained. Job Element | Cycles | 1 | 0.16 | 0.12 | 0.33 | 0.15 | 0.24 | 2 | 0.60 | 0.60 | 0.60 | 0.60 | 0.60 | 3 | 0.33 | 0.50 | 0.35 | 0.37 | 0.35 | 4 | 0.50 | 0.50 | 0.50 | 0.50 | 0.50 | 5 | 0.24 | 0.24 | 0.25 | 0.27 | 0.25 |

The following additional information was also determined about the jobs: a. Job elements 2 and 4 are machine controlled and cannot be speeded up by the operator. b. There were two irregular occurrences while timing i.e. jobs having more than 25% variation from average. c. He rated the operator at 110% when working d. Personal allowance 30 minutes a day.
Unavoidable delay 20 minutes a day.
Fatigue – 10% of the operators actual physical working time. e. A shift is 8 hours long. What should be the standard minutes per unit be for this job?
What should be the shift output standard be?
Solution:

| | | Cycle | | | | | Job Element | | 1 | 2 | 3 | 4 | 5 | | 1 | | 0.16 | 0.12 | 0.33 | 0.15 | 0.24 | | 2 | | 0.6 | 0.6 | 0.6 | 0.6 | 0.6 | | 3 | | 0.33 | 0.5 | 0.35 | 0.37 | 0.35 | | 4 | | 0.5 | 0.5 | 0.5 | 0.5 | 0.5 | | 5 | | 0.24 | 0.24 | 0.25 | 0.27 | 0.25 | | | Total | 1.83 | 1.96 | 2.03 | 1.89 | 1.94 | | | Average Observed Time | 0.366 | 0.392 | 0.406 | 0.378 | 0.388 | | | Normal Time = OTXOR/SR | 0.4392 | 0.4704 | 0.4872 | 0.4536 | 0.4656 | 2.316 | | | | | | | | | | | | | | | | | Normal Time for the Job = 2.316 | | | | | | |
Allowance = 50 Minutes
% Allowance = 50/430X 100 = 11.62% of normal time

Standard time / piece = 2.316+11.62%*2.316 + 0.1 = 2.68
Fatigue 10% = 10/100 = .1
Standard Production in 8 Hrs = 2.316 X 60 / 2.68 = 51.850 units

Q6 a) Consider a product, code named A, manufactured by a company. Product A is made of three sub-assemblies B, C and D. One unit of B, four units of C and two units of D are required for assembling one unit of product A. Sub-assembly C is made of two units of E and four units of D, whereas sub-assembly D is made of one unit of G and three units of H. (i) Develop a product structure for product A (ii) How many units of D are required to manufacture of 10 units of A? (iii) Will the answers change if there is already an inventory of 10 units each of C and D?

Solution:

Product Structure for Product A

A
B
(1)
C
(4)
D
(2)
G
(1)
F
(4)
E
(2)
D
(4)
E
(2)
H
(3)
A
B
(1)
C
(4)
D
(2)
G
(1)
F
(4)
E
(2)
D
(4)
E
(2)
H
(3)

1 unit of production of C is required 4 units of D, Therefore 4 units of production of C required 16 units of D.

(ii) That means 1 unit of product A required 16 units of D, so 10 units of product A required 160 units of D.
(iii) If there is already an inventory of 10 units each of C and D, then the product planning as follows.
Total C required 40-10 = 30 units
D = 160 – 10 = 150 units.
Question 4. A manufacturing organization employs 220 people in the factory. The manufacturing is largely manual; therefore, man hours are a good measure of the capacity of the system. The factory currently works for a single shift of eight hours. The number of working days for the next six months is as follows: 24, 22,25,19,21 and 23. The company uses this information to plan its capacities. The demand for its product during the next six months is such that with the current level of employment, the company will have 80 percent capacity utilization. During the next six months, the number of working days remains the same but the demand is likely to go up by 35 percent. Under these circumstances, analyses the situation and answer the following questions:

(i) What is the total capacity available in the factory as of now? (ii) The company is considering three options to meet the implementing demand for capacity? a. Introduce two hours of overtime for the next six months. b. Introduce one hours of overtime for the first three months and two hours of idle time thereafter.

Solution: i) Calculation of factory capacity (in hours) : Total no of workers 220
Shift hours per day = 8 hours
Daily factory capacity (in hours) = 220*8 hours = 1760 hours Month | No of working days | Factory Capacity (in hours) | 1 | 24 | 42240 | 2 | 22 | 38720 | 3 | 25 | 44000 | 4 | 19 | 33440 | 5 | 21 | 36960 | 6 | 23 | 40480 | | Total | 235840 |

Total capacity available in the factory is 235840 X 80% = 188672hrs ii) a) Introduce two hours overtime for the next six months.
Daily factory capacity(in hours) = 220*10 = 2200

Month | No of working days | Factory Capacity (in hours) | 1 | 24 | 52800 | 2 | 22 | 48400 | 3 | 25 | 55000 | 4 | 19 | 41800 | 5 | 21 | 46200 | 6 | 23 | 50600 | | Total | 294800 |

Total capacity available in the factory is 294800 X 80% = 235840hrs

b) Introduce one hour of overtime for next six months.
Daily factory capacity(in hours) = 220*9 = 1980 Month | No of working days | Factory Capacity (in hours) | 1 | 24 | 47520 | 2 | 22 | 43560 | 3 | 25 | 49500 | 4 | 19 | 37620 | 5 | 21 | 41580 | 6 | 23 | 45540 | | Total | 265320 |

Total capacity available in the factory is 265320 X 80% = 212256hrs
c) Introduce two hours of overtime for the first three months and two hours of idle time therafter. Month | No of working days | Factory Capacity (in hours) | 1 | 24 | 52800 | 2 | 22 | 48400 | 3 | 25 | 55000 | 4 | 19 | 33440 | 5 | 21 | 36960 | 6 | 23 | 40480 | | Total | 267080 |
Total capacity available in the factory is 267080 X 80% = 213664hrs

You May Also Find These Documents Helpful

  • Good Essays

    Nt1310 Unit 4

    • 699 Words
    • 3 Pages

    Using filter, I found out the minimum number of defects by batch was zero, and the maximum number of defects by batch was twenty-three. Therefore, we can say that the number of defects that are more than ten are major problems and should be flagged. I chose ten as the number to base it on because when you compare the number of defects to the batch size (500, 1000, 5000 and10000) anything less than ten is rather small and is to be expected. Conditional formatting was used to highlight all defects which were greater than ten.…

    • 699 Words
    • 3 Pages
    Good Essays
  • Good Essays

    John Pauzke, president of Cereals Unlimited, Inc., wants to be very certain that the mean weight μ of packages satisfies the package label weight of 16 ounces. The packages are filled by a machine that is set to fill each package to a specified weight. However, the machine has random variability measured by σ2. John would like to have strong evidence that the mean package weight is above 16 ounces. George Williams, quality control manager, advises him to examine a random sample of 25 packages of cereal. From his past experience, George knew that the weight of the cereal packages follows a normal distribution with standard deviation 0.4 ounce. At the significance level α…

    • 841 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    week 5 qquiz

    • 428 Words
    • 3 Pages

    If the costs associated with spoilage and reworked units are considered as normal to manufacturing operations, the unit cost of the good units produced on Job 911 is…

    • 428 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Legt1710

    • 2593 Words
    • 11 Pages

    Please note – in this unit we are NOT DEALING with: • Sale of Goods • Product Liability Therefore the following paragraphs in Latimer are NOT RELEVANT: ¶7-011 to ¶7-215…

    • 2593 Words
    • 11 Pages
    Powerful Essays
  • Satisfactory Essays

    paper 2

    • 368 Words
    • 1 Page

    families these African Americans did not give up on their boycott. The boycott started an uproar…

    • 368 Words
    • 1 Page
    Satisfactory Essays
  • Satisfactory Essays

    Paper 1

    • 372 Words
    • 2 Pages

    Nike alighting on a warship (Nike of Samothrace), from Samothrace, Greece, ca. 190 BCE. Marble, figure 8’ 1” high. Louvre, Paris.…

    • 372 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Paper 1

    • 596 Words
    • 3 Pages

    In Idaho about 20 years ago, voters seeked to put term-limits in the Idaho government. During that time, a lot 60 percent of Idahoans voted for term-limits, which would then restrict the terms of elected officials all the way to county commissioners. Idaho’s term-limit policy stated that during a 15 year period you would only serve 8 years in office, and during an 11 year period you can only serve 6 years. However, since this policy did not come in effect until 1996, the new term limits could not be applied until 2004. Over that time, officeholder’s opposition grew towards these term limits. The parties that were affected by term-limits declared their opposition in 2002, because if they did not they would be forced out of office. The leaders of these parties tried to convince the people to repeal this act of term limits. Including business leaders and local officials also opposed term limits because of their potential impact of the government. In low populated areas, not very many people would be willing to work in a low-wage or no-pay offices. Also another predicament would be that the long-term offices positions could possibly not be filled. Idaho, in 2002 was the first state to repeal term limits. However, the Idahoan legislature voted for repeal overriding the governor’s veto. The supporters of term-limits then gathered votes to “repeal the repeal”. With 1,889 votes of more than 400,000 ballots cast, the legislatures were approved and were sustained from the term limit supporters.…

    • 596 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Paper

    • 439 Words
    • 2 Pages

    6) Use your results to assess whether combined data from the whole class matches the “ideals” of the Vitruvian man more closely than measurements based entirely on yourself.…

    • 439 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Paper 1

    • 928 Words
    • 4 Pages

    Background checks are a useful tool for employers to determine the fit of a candidate to the organization. They pull up any issues or discrepancies that may not have been provided by the candidate during the interview. It is very important that during the interview, the candidate is advised that there will be a background and reference check conducted so that they cannot say they did not know. After the background check has come back, the interviewer needs to decide whether or not to hire the candidate.…

    • 928 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    paper

    • 328 Words
    • 3 Pages

    Your record was unable to be verified by TEA-approved thirdparty database sources. To receive credit for course completion,…

    • 328 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Paper

    • 366 Words
    • 2 Pages

    Peggy McIntosh’s article, “White Privileges: Unpacking the Invisible Knapsack” (1998), asserts that males and white people from birth have certain privileges, earned strengths, and unearned power. McIntosh supports this claim by identifying some of the daily effects of white privilege she witnesses. McIntosh purpose is to point out the invisible systems of male and white privilege in order to inform the public of the invisible unfairness and to reconstruct it. McIntosh’s intended audience is the public who doesn’t know that they are being invisibly cut short racially and unaware that they have certain privileges.…

    • 366 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Now let’s get down to business and find out how the Gravity Equations work in different…

    • 2386 Words
    • 10 Pages
    Powerful Essays
  • Better Essays

    Paper

    • 1450 Words
    • 6 Pages

    Alzheimer’s disease, what is there to say about this disease? There is an uncomfortable ease about knowing that it is known that you develop this disease in old age, or do you. We will learn and understand about how (AD) Alzheimer’s disease was discovered, named, its’ myths, past and present treatments, signs and symptoms, and diagnosis. It will be known how it was considered a disease and not just a normal or regular part of becoming of age or aging. With Alzheimer’s having several stages associated with it, we will discover that not everyone will experience all stages, symptoms, or progress at the same time or rate.…

    • 1450 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    I will use the same wooden ruler for doing the whole experiment so that the elasticity in my experiment does not change. I will measure the time period for 20 oscillations for every lengths and also use the 50 g mass in every length. The design of my lab experiment looks similar to the given picture.…

    • 1087 Words
    • 32 Pages
    Powerful Essays
  • Satisfactory Essays

    return

    • 1421 Words
    • 75 Pages

    The SAS System 21:44 Wednesday, November 26, 2014 Obs date refd_1st_lag refd_1st_diff refd_1st_diff_1st_lag refd_1st_diff_2nd_lag 1 30MAR1990 . . . .…

    • 1421 Words
    • 75 Pages
    Satisfactory Essays

Related Topics