Zadok - I contacted Stan with Clegg Steel, and he confirmed he will be mobilizing next Tuesday, to start installing the stairs etc. I also helped him locate a fork lift for rent, and let him know that we would have building A's columns back filled and compacted on Monday.

I followed up with Evan at Top Notch regarding the doors, he said that he is hoping they will be done on Monday and Nick M. can bring them up when he comes on Tuesday.

I met with each of the subs today and discussed the areas that need Fire Caulking.

Powers Excavating - Tyler worked today on back filling and compacting the ground around the meters pits next to building B. He also worked grading and leveling out that section, and removing excess dirt.

Mountain


You May Also Find These Documents Helpful

  • Good Essays

    There should be clear procedures in place so that everyone on the premises knows what to do in case of fire.…

    • 273 Words
    • 1 Page
    Good Essays
  • Satisfactory Essays

    Est1 Task 3

    • 279 Words
    • 2 Pages

    This Change Request would fund the labor, travel, and KISS user days for a factory technician from Rubb Building Systems to assist with the on-site construction of the Summit Mobile Garage as a quality assurance measure to facilitate timely and proper assembly of the structure. Specifically, upon arrival at Summit Station the Rubb technician will assess the status of the erection, which will already be in-progress, and work with the CPS Foreman in addressing questions or clarifications, identifying potential solutions to current or anticipated issues. Additional services will include expert interpretation of the Rubb construction documents, proposing of experienced-informed construction methods, assembly instructions for crew members as required, status documentation assistance, and hands-on execution of construction efforts integral with the CPS team. CPS has identified three main advantages for sending this technical expert to Summit: 1) ensuring an efficient construction process that will save time and labor, and will reduce risks associated with a prolonged construction phase, 2) assurance the structure has been constructed properly, resolving onsite issues and verifying there are no manufacturing defects, and 3) guaranteeing the warranty remains valid. Overall, the Rubb technician will provide on-site instruction, guidance, building-specific tools aiding the construction, and otherwise perform construction efforts along-side the CPS construction crew. The SIP base and tent for this structure were procured in Yr4 (CR 04-F011) and this work will be funded under a separate Yr5 subcontract to the manufacturer.…

    • 279 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    The statement of work defines the construction project for the Phoenix family's new garage with second level living quarters. Fales Construction is the general contractor for the project. The excavation and foundation work will be sub-contracted to Mural Excavation and Landscaping. The carpentry work will be sub-contracted to Fox Construction. The plumbing work will be sub-contracted to Soldiers Plumbing. The electrical work will be sub-contracted to Amps-R-Us.…

    • 1988 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    The building will consist of a four floors, and will provide a mix of small and medium inmate housing units—rated for a total of 300 beds—programming, and administrative space. While the replacement of the South Annex with the West Annex will result in fewer available beds, the new facilities will offer expanded medical, mental health, and drug rehabilitation services for inmates. Construction is expected to be completed by late Summer of 2019, although the facility is not expected to be fully operational until October of…

    • 600 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Luncheon Case Study

    • 696 Words
    • 3 Pages

    Discussion: Mr. Brunson informed the staff, construction has started on the Denmark site and will be completed by November 26, 2017 with expectation of being ready for operation by December 1, 2017.…

    • 696 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The site visits for the unit 2 assignment started whilst general civil works were taken place, this involve foundation works for tanks, buildings, turbine rooms, paving and culverts for underground piping, etc. There were various types of work activities that range from Shallow to Deep foundations. Refer to photos in appendix 1 for further clarification.…

    • 456 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Budget Information: The budget will be initiated at $20 million, with the majority of funds going to land acquisition, the initial establishment of the facility, and construction of the facility. The various costs include planning and feasibility studies, insurance, taxes and safety equipment during construction, inspection and testing, building materials, operations and administrative staff, office space, travel and housing costs, inventory, labor and training, landscaping, and other miscellaneous expenses.…

    • 1475 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    elevator pitch

    • 277 Words
    • 2 Pages

    Seeing as I am a long standing client and in fact, saved you a lot of money by not returning the doors, I would like to be reimbursed for the additional cost. Enclosed with this letter is a copy of my carpenter’s bill. As the order was placed on the phone, the door invoice doesn’t state the measurements, still I have included it in this envelope. I look forward to the speedy resolution of this manner.…

    • 277 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    fire hazard ananlysis

    • 6171 Words
    • 25 Pages

    FINAL HAZARD ANALYSIS FOR THE ERARING POWER STATION UPGRADE PROJECT Prepared for: Eraring Energy Document Number: ERAENE\14-218 Revision B Prepared by: Karin Nilsson 5 November 2009 PO Box 248 Berowra Heights NSW 2082 Telephone: [02] 9985 1056 Facsimile: [02] 9427 7841 Email: Planager@bigpond.net.au Final Hazard Analysis for the Eraring Power Station Upgrade Project Acknowledgment The author would like to thank Frank Mieszala for his assistance in preparing this report. Disclaimer…

    • 6171 Words
    • 25 Pages
    Powerful Essays
  • Good Essays

    Poured Fire

    • 299 Words
    • 2 Pages

    In the novel They Poured Fire on Us From the Sky, by Benson Deng, Alephonsion Deng, and Benjamin Ajak; Benson communicates a strong will to survive by using the device description.…

    • 299 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    My name is 1) Jay Hammond I am a firefighter. 2) I live in 128 Pine Lane, in…

    • 85 Words
    • 1 Page
    Satisfactory Essays
  • Powerful Essays

    After 7 months of searching, we had finally found the location of the sixteenth artifact for our collection. After piecing together all of the stories and legends, we finally found a bit of truth. The Vial Of Fire was an ancient weapon that was said to be created by the Egyptians. In their time it was a medicine designed to give someone the ability to ignite in flames for a small amount of time, and was used mostly for cauterizing wounds of friends injured while building the pyramids. We had already found The Vial of Strength, and the The Vial of Speed from the same time period. Each of these vials had the last remaining ounces of the immensely powerful potions that made it possible for humans to make the pyramids on their own. After…

    • 2438 Words
    • 10 Pages
    Powerful Essays
  • Satisfactory Essays

    I heard about the fire in Walmart, didn't something like that could happen to a place that's not too far from me. I'm glad no one was hurt. Also good description of stepping on the Lego, piece. Reading it gave me flashbacks of when I would step on them and nearly fall over so I wouldn't feel the full impact of it.…

    • 64 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    After reading the short story, “Everyday Use” you will notice the use of fire throughout the story. In this story the older sister, who is educated and intelligent, comes to visit her mother and younger sister. The short story expresses lots of imagery of a fire throughout the story. A younger child might think a fire is scary; however, a prescribed fire is a good thing. Prescribed burning is a controlled fire that helps the ecosystem by improving habitats for animals and reducing the chances for wild fire.…

    • 465 Words
    • 2 Pages
    Good Essays
  • Better Essays

    Within a few minutes, the sound of sirens rushes across the school parking lot. The heat from the pavement causes the emergency vehicles to waver surreally, as if they're an illusion speeding toward me. I stand numbly next to the wreckage as the firefighters hurry forward to free the lady trapped inside her car. The kid who rolled off the side of the bleachers screams as the paramedics lift him onto a stretcher. His leg is twisted at an odd angle. It's definitely broken.…

    • 1127 Words
    • 5 Pages
    Better Essays