INVENTORY OF ACTIVITIES
No.
Process/Location:
Work Activities
PESS Computer Lab: Activities: 1 NIE5-02-RR07 Handling of computers (desktop and notebooks) & AV equipment
Laboratory activities are extended to students when necessary.
PHYSICAL EDUCATION AND SPORTS SCIENCES ACTIVITY-BASED RISK ASSESSMENT FORM
Process/Location: PESS Computer Lab
Conducted by: Sebastian Tan (Names, designations, date)
Approved by: (Names, designations, date)
Dr Chow Jai Yi
Last Review Date:
Apr 2011
Next Review Date:
Apr 2013
1. Hazard Identification
1a. 1b. 1c. 1d. 2a.
2. Risk Evaluation
2b. 2c. 2d.
3. Risk Control
3a. 3b. Follow up by (name, designation & date)
No.
Work Activity
Hazard
Possible Accident / Ill Health & Persons-at-Risk
Existing Risk Control (if any)
Seve -rity
Likelihood
Risk Level
Additional Risk Control
1
Deskbound computer-based task
Malfunctioning of chair
Falls
Laboratory technician to do regular Inspection of chairs and to replace faulty chairs. To take a walk periodically
2
1
2
Ergonomic: prolong seating
Carpal tunnel syndrome
To take a walk periodically
Laboratory Technician
Proper maintenance of equipment Use of electrical equipment Electrical hazards/fire Electrocution Check equipment before use Use of safety mark plugs and extension cord 2 Do not overload power plugs with too many electrical or electronics equipment. Refer to operation manual on safe use of equipment Switch off electrical equipment at the end of the day Laboratory Technician 2 2 4
1. Hazard Identification
1a. 1b. 1c. 1d. 2a.
2. Risk Evaluation
2b. 2c. 2d.
3. Risk Control
3a. 3b. Follow up by (name, designation & date)
No.
Work Activity
Hazard
Possible Accident / Ill Health & Persons-at-Risk
Existing Risk Control (if any)
Seve -rity
Likelihood
Risk Level
Additional Risk Control
Overheating