Appraisal Committee
Proposed Project
32 MW Captive Power Plant in Existing Ferro Alloy Unit
Proponent
M/s. Star Metallics & Power Pvt. Ltd.
Hospet, Karnataka.
Karnataka SEAC PPT For EC of Star Metallics & Power Pvt. Ltd.
1
PROJECT HIGHLIGHTS
Name of company
M/s. Star Metallics & Power Pvt. Ltd
Promoter of company
EIEL, India & ETA group, Dubai.
Location
Vyasankere, Ta: Hospet, Dist.: Bellary
District: Karnataka
EXISTING PROJECT DESCRIPTION
Plot Area
95 Acre
Project
Ferro alloy plant
Location
Vyasankere, Ta: Hospet, Dist.: Bellary
District: Karnataka
Activity status
The existing Ferro alloy plant is not operational since last 10 years due to unavailability of feasible power source. Karnataka SEAC PPT For EC of Star Metallics & Power Pvt. Ltd.
2
PROJECT HIGHLIGHTS
Contd…….
Product
Silicomanganese (SiMn )
Capacity of plant
44,700 MTPA (SiMn )
No. of Furnace (Type)
Two ( Submerged Arc Furnace)
Rating of furnace
1 x 15000 KVA, 1 x 20000 KVA
Projected operating load of ferroalloy plant
24000 KW
Total Connected Load
33 MVA
Raw Materials
Manganese ore, Metallurgical coke,
Limestone & Quartz.
Karnataka SEAC PPT For EC of Star Metallics & Power Pvt. Ltd.
3
PROJECT HIGHLIGHTS
Contd…….
Water requirement and Source
148 m3/ day, Tungbhadra dam reservoirs Effluent Generation & Disposal
46 m3/ day
Gardening & dust suppression
Source of power
GESCOM Grid (It is used to run
15,000 MVA furnace only, untill the proposed CPP will not be operational)
Karnataka SEAC PPT For EC of Star Metallics & Power Pvt. Ltd.
4
PROJECT HIGHLIGHTS
Contd…….
PROPOSED PROJECT DESCRIPTION
Project
Installation of new 32 MW Captive Power
Plant in existing ferro alloy unit.
Location
Within existing ferro alloy unit.
Power