Preview

principle of project management

Powerful Essays
Open Document
Open Document
2870 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
principle of project management
00

7/9/02

10:24

Page i

Code of Practice for

Project Management for Construction and Development

00

7/9/02

10:24

Page iii

Code of Practice for

Project Management for Construction and Development

Third edition

00

7/9/02

10:24

Page iv

© 2002 The Chartered Institute of Building
Blackwell Publishing Ltd
Editorial Offices:
Osney Mead, Oxford OX2 0EL, UK
Tel: +44 (0)1865 206206
Blackwell Science, Inc., 350 Main Street,
Malden, MA 02148-5018, USA
Tel: +1 781 388 8250
Iowa State Press, a Blackwell Publishing Company,
2121 State Avenue, Ames, Iowa 50014-8300, USA
Tel: +1 515 292 0140
Blackwell Publishing Asia Pty, 550 Swanston Street,
Carlton South, Victoria 3053, Australia
Tel: +61 (0)3 9347 0300
Blackwell Wissenschafts Verlag,
Kurfürstendamm 57, 10707 Berlin, Germany
Tel: +49 (0)30 32 79 060
The right of the Author to be identified as the Author of this Work has been asserted in accordance with the
Copyright, Designs and Patents Act 1988.
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, except as permitted by the UK Copyright, Designs and Patents Act 1988, without the prior permission of the publisher.

First published 1992
Second edition 1996
Third edition 2002 by Blackwell Publishing
Library of Congress
Cataloging-in-Publication Data is available
ISBN 1-4051-0309-4
A catalogue record for this title is available from the
British Library
Typeset and produced by Gray Publishing,
Tunbridge Wells, Kent
Printed and bound in Great Britain by
Ashford Colour Press, Gosport

00

7/9/02

10:24

Page v

Contents

Foreword
Preface
Acknowledgements
List of tables and figures
From the President
Introduction
Project management
Role
Purpose of construction project management
Structure of project management

Part 1
1.

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Project Management

    • 440 Words
    • 2 Pages

    1. Project managers frequently face competing constraints. Identify these common constraints and describe approaches that project managers can use to make the trade-offs required to succeed…

    • 440 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Project management

    • 1280 Words
    • 7 Pages

    Provide evidence for grading criterion P1. (identify the various stages of the construction process for a low-rise domestic or commercial building)…

    • 1280 Words
    • 7 Pages
    Powerful Essays
  • Better Essays

    Project Management

    • 844 Words
    • 4 Pages

    The projects environment as it relates to cultural /social is one of healing, health and wellbeing of the population or community. The expansion of the facility will impose little impact on the environment as we will be using an existing building and all green practices and policies will be instituted when possible.…

    • 844 Words
    • 4 Pages
    Better Essays
  • Satisfactory Essays

    Project Management

    • 289 Words
    • 2 Pages

    You are the project manager for the project you selected and identified in the prior assignments. Using your Microsoft Project software, sketch out your action plan. Use the action plan to develop the work breakdown schedule (WBS) as follows:…

    • 289 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Project Management

    • 252 Words
    • 2 Pages

    2. Assume that the project is time constrained and try to resolve any over allocation problems by leveling within slack. What happens?…

    • 252 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    ‘Project management is the application of knowledge, skills, tools and techniques to project activities to meet the project requirements’ (Project Management Institute, 2009, p12). Once a project has been approved a project manager is assigned to the project, and ‘is expected to integrate all aspects of the project, ensure that the proper knowledge and resources are available when they are needed, and ensure that the results are produced in a timely, cost-effective manner’ (Meredith and Mantel, 2010, p5). In order to allow this to happen there are several key aspects of a project which need to be carefully thought out and controlled.…

    • 1355 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    ACAS Code Of Practice

    • 3297 Words
    • 16 Pages

    April 2009 Code of Practice 1 Disciplinary and grievance procedures Published by TSO (The Stationery Office) and available from: Online www.tsoshop.co.uk Mail, Telephone, Fax & E-mail TSO PO Box 29, Norwich, NR3 1GN Telephone orders/General enquiries: 0870 600 5522 Fax orders: 0870 600 5533 E-mail: customer.services@tso.co.uk Textphone: 0870 240 3701 TSO@Blackwell and other Accredited Agents Customers can also order publications from: TSO Ireland 16 Arthur Street, Belfast BT1 4GD Tel 028 9023 8451 Fax 028 9023 5401 Publishedwith for A CAS under licence the Controller of Her Majesty ’s Stationery Office.…

    • 3297 Words
    • 16 Pages
    Powerful Essays
  • Satisfactory Essays

    Project Management

    • 305 Words
    • 2 Pages

    1. If I were in Lauren’s shoes, I would make sure it’s clear to the strategic management group that my estimate – a more detail/micro estimate – came in well over their initial macro estimate. That being said, I would also provide upper management with the ideas (outsourcing, change scope, cancel project..) developed with stakeholders in the brainstorming meeting. Simply moving forward with the project after finding such a large gap in estimates would be a terrible idea that would most likely to back fire. It’s important that the executives understand major differences or flaws in the project plan.…

    • 305 Words
    • 2 Pages
    Satisfactory Essays
  • Best Essays

    The study and management of construction projects embraces a variety of organisational aspects. Its complexity encompasses the behaviour of people, a range of internal and external processes and interactions with the environment of which the organisation is part. Nevertheless the following work is concerned with an overall managerial approach to organisational theory and with this underlying theme does not intend to explore and specify any particular aspect but instead present a wider and overarching paradigm. This work aims to support the thesis set in the title and in so doing draws upon the range of information and thoughts compiled here from sources listed in the bibliography.…

    • 2564 Words
    • 11 Pages
    Best Essays
  • Powerful Essays

    Bibliography: Sidney M. Levy (2002) Project Management in Construction Project Planning, Management and Delivery | Whole Building Design McGraw-Hill, 2002.…

    • 2275 Words
    • 10 Pages
    Powerful Essays
  • Powerful Essays

    Sociology Essay

    • 20432 Words
    • 82 Pages

    rights are granted without permission in writing from the publisher or under licence from the…

    • 20432 Words
    • 82 Pages
    Powerful Essays
  • Powerful Essays

    By adopting the viewpoint of the owners, we can focus our attention on the complete process of project management for constructed facilities rather than the historical roles of various specialists such as planners, architects, engineering designers, constructors, fabricators, material suppliers, financial analysts and others. To be sure, each specialty has made important advances in developing new techniques and tools for efficient implementation of construction projects. However, it is through the understanding of the entire process of project management that these specialists can…

    • 63133 Words
    • 253 Pages
    Powerful Essays
  • Best Essays

    This literature review will discuss Project Management and the apparent need for a systems approach when managing projects involving innovation and complexity compared to using a simple process. In order to conceptualise the discussion, the construction industry will be used to provide a framework for Project Management.…

    • 3744 Words
    • 15 Pages
    Best Essays
  • Satisfactory Essays

    Authentic Leadership

    • 327 Words
    • 2 Pages

    Walker, Derek(2). International Journal of Project Management; May2011, Vol. 29 Issue 4, p383-395. Retrieved from EBSCOhost, summarized by Rachell Bishop.…

    • 327 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Korkut Mirzai 08074260 Bachelor Science with Honors Degree in Construction Project Management. Oxford Brookes University. Department of the Built of Environment. March 2012…

    • 9099 Words
    • 37 Pages
    Powerful Essays