Introduction
Coatbank Component wishes to install a new network from scratch, to meet the company’s current and future requirements. They wish to accomplish this as cheap as possible. In this project we will be installing a new network, creating users and group account for staff, installing a domain controller, installing a new network operating operation system (windows sever 2000/2003) and a client operating system (windows xp). We will also be restricting different staff from accessing different files.
Aim
The aim of this project is to construct a modern computing network that will meet the company’s current and future requirements, completing this project we will bw using up to date software’s and hardware
To accomplish this project we will use questionnaires and interviews to get the functional and non-functional requirements for this project. Functional requirements deal with what the system should do or provide for users while A Non-Functional Requirement is usually some form of constraint or restriction that must be considered when designing the solution. When the functional and non-functional requirements gotten from the company this will form a legal document between the company and the contractor which will be signed by both parties
Functional Requirements
24 PORT SWITCH
24 Port PATCH PANELS
PCSs and printer configurations with TCP/IP protocol
File and printer sharing setup on systems
RJ 45 Connectors
PCs and printer configurations with TCP/IP protocol
File and printer sharing setup on systems
10 BY 4 Trunking installed round the walls
8 double network points
310 meter long Ethernet cable and extra 6 meters for Coner and clamps
The printer is been connected through a host computer
4 servers
1 web server
1 data storage server
1 backup server
Racks to hold the patch panel and switch
All computers added to the