Project Report on Power Plant at Tanda
ACKNOWLEDGEMENT WE HEREBY TAKE THIS OPPORTUNITY TO THANK NTPC LTD. TANDA FOR GIVING US THIS OPPORTUNITY TO CONDUCT OUR TRAINING IN NTPC LTD., TANDA. WE ARE GRATEFUL TO MR. D.N. TIWARI(DGM,C&I) FOR ALLOWING US TO CONDUCT OUR TRAINING IN THE CONTROL & INSTRUMENTATION DEPARTMENT.WE ARE HEARTLY INDEBTED TO OUR PROJECT GUIDE Mr. LALIT KUMAR SINGH (Dy.SUPT,C&I)FOR PROVIDING US WITH DETAILED IN DEPTH KNOWLEDGE AND VERY USEFUL INFORMATION ABOUT THE PROCESSES AND SYSTEMS USED IN THE PLANT.HIS SUPPORT WAS INSTRUMENTAL IN OUR TRAINING BEING FRUITFULL.WE ARE ALSO VERY TANKFUL TO ALL THE OFFICERS AND STAFF OF NTPC LTD., TANDA FOR EXTENDING A HELPING HAND WHENEVER WE NEEDED IT.
WITH REGARDS, RAVI KANT BHARTI
B.TECH FINAL YEAR (VOCATIONAL TRAINEE)
(B.M.A.S ENGG. COLLEGE, AGRA (U.P))

INTRODUCTION
NTPC is the largest power generation company in India, with comprehensive in-house capabilities in building and operating power projects. It is producing 28,644MW. Its family consists of 18 coal based power plant producing (23209 MW) and 8 gas based power plant having a capacity of (5435 mw). It is also setting up a hydro based power plants having capacity of 2471MW. It is one of the largest Indian companies with a market cap of more than US$50 BILLION and has total assets of around US$ 20 BILLION. In this firm government has 89.5% stake and 10.5% with public. NTPC is ranked 463rd biggest company in the world, 5th biggest Indian company and 2nd largest Asian power generator. It produces 26350MW which is 20.18% of the total 130,539MW of all India consumption. More than one-fourth of India’s generation with one-fifth capacity. The next largest power utility owns 7.9% of market share in terms of capacity and 8.12% of share in

You May Also Find These Documents Helpful

  • Satisfactory Essays

    National Electric Power is a multinational energy company with a variety of energy assets. NEP is headquartered in Columbus, Ohio, and has a service area of approximately 197,500 square miles in Arkansas, Indiana, Kentucky, Louisiana, Michigan, Ohio, Oklahoma, Tennessee, Texas, Virginia, and West Virginia. In 2001, NEP had revenues of $61.3 billion and carried $47 billion in assets, making them the largest electricity generator in the United States.…

    • 289 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Many scientists have made the contribution to the discovery of the structure of an atom. There have been various theories that have stated the structure an atom maintains, but over time those theories have been tested and altered. In the case of Ernest Rutherford’s nuclear theory, the gold foil experimental design that proved his notion adapted from the findings of a previous theory, by J.J. Thomson. This experiment, adjusted the claims made by Thomson that further supported the theory of the atomic structure and developed a new model to realistically demonstrate the atom.…

    • 238 Words
    • 1 Page
    Good Essays
  • Powerful Essays

    Animatronic Hand.

    • 6493 Words
    • 50 Pages

    basis of which a degree or award was conferred on an earlier occasion on this…

    • 6493 Words
    • 50 Pages
    Powerful Essays
  • Satisfactory Essays

    States meet their demand of Power from the state run generating stations. The power of the generating stations from the central utility i.e. NTPC has been allotted to various states using the GADGIL formulae of capacity allocation.…

    • 768 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Hydro-power and coal based thermal power have been the main sources of generating electricity in the Indian power sector which has registered significant progress since 1950 when the process of planned development of the economy began. Nuclear power development has been at a slower pace, since its inception in the late sixties. In spite of the overall development in the recent times, the power supply industry has been under constant pressure to bridge the gap between supply and demand.…

    • 5507 Words
    • 23 Pages
    Powerful Essays
  • Powerful Essays

    JAM session topics

    • 2349 Words
    • 10 Pages

    I express my thanks to Mr. Y. GOVINDA RAMAIAH, Director, and ATRI for his great encouragement throughout this technical seminar.…

    • 2349 Words
    • 10 Pages
    Powerful Essays
  • Good Essays

    Bataan Nuclear Power Plant is nuclear power plant, completed but never fueled, on Bataan Peninsula, 100 kilometers (62 mi) west of Manila in the Philippines. It is located on a 3.57 square kilometer government reservation at Napot Point in Morong, Bataan. It was the Philippines’ only attempt at building a nuclear power plant. The Philippine nuclear program started in 1958 with the creation of the Philippine Atomic Energy Commission (PAEC) under Republic Act 2067. Under a regime of martial law, Philippine President Ferdinand Marcos in July 1973 announced the decision to build a nuclear power plant. This was in response to the 1973 oil crisis, as the Middle East oil embargo had put a heavy strain on the Philippine economy, and Marcos believed nuclear power to be the solution to…

    • 997 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    At present, India is the sixth largest energy consumer in the world and is projected to emerge as the fourth largest consumer after the United States, China and Japan in the coming decades. India’s commercial energy basket is currently dominated by coal (53 percent); oil (31 percent) and gas (8 percent). Meeting increasing energy demands will remain one of the major issues for India in the 21st century owing to high dependency on energy imports. Nuclear Energy offers both opportunities and challenges for any aspiring countries including India. Without nuclear power, achieving energy security will be much more difficult.…

    • 1394 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Presentation for Environmental Clearance before the esteemed members of Karnataka State Level Expert Appraisal Committee Proposed Project 32 MW Captive Power Plant in Existing Ferro Alloy Unit Proponent M/s. Star Metallics & Power Pvt. Ltd. Hospet, Karnataka. Karnataka SEAC PPT For EC of Star Metallics & Power Pvt. Ltd. 1 PROJECT HIGHLIGHTS Name of company M/s. Star Metallics & Power Pvt.…

    • 3633 Words
    • 15 Pages
    Powerful Essays
  • Powerful Essays

    We would like to express our heartfelt gratitude towards Shri Jagarnath Orav (Senior Manager, IMM) for guiding us and giving us his invaluable and precious time. He directed us to learn about the machines, which were new to us. Without his help and support the completion of this project would have been a very difficult task. We would also like to thank our instructor Shri Satish Kumar Dubey who helped us enormously throughout. We would also like to thank Shri J.C. Sharma and Shri Suresh Nema (HRDC) for helping us in the allocation of appropriate departments and in a hundred little ways. Thanking the dedicated officials and staff of Steam Turbine Department, we would like to make a special mention of Shri Anand Dubey, Shri Sudipto, Shri Sumesh for giving us practical knowledge and day to day utility of the subject. We would also like to thank Shri R.B. Patil (AGM, Steam Turbine) for providing his constant help and support. Last but not the least, we would like to thank BHEL for providing us the…

    • 6080 Words
    • 25 Pages
    Powerful Essays
  • Powerful Essays

    Hr Poliies

    • 3515 Words
    • 15 Pages

    | NATIONAL THERMAL POWER CORPORATION NTPC'People before PLF (Plant Load Factor)' is the guiding philosophy behind the entire gamut of HR policies at NATIONAL THERMAL POWER CORPORATION. We are strongly committed to the development and growth of all our employees as individuals and not just as employees. We currently employ approximately 26,000 people at NTPC.Competence building, Commitment building, Culture building and Systems building are the four building blocks on which our HR systems are based.…

    • 3515 Words
    • 15 Pages
    Powerful Essays
  • Better Essays

    Diesel Power Plant

    • 1115 Words
    • 5 Pages

    Figure shows the arrangements of the engine and its auxiliaries in a diesel power plant. The major components of the plant are:…

    • 1115 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    virtual instrumentation

    • 3617 Words
    • 14 Pages

    We extend our profound gratitude to Dr. K. Prakasan, Professor and Head, Department of Production Engineering, PSG College of Technology, who has always been a source…

    • 3617 Words
    • 14 Pages
    Powerful Essays
  • Powerful Essays

    Doha West Power Station

    • 4276 Words
    • 18 Pages

    First of all I like to thank ministry of electricity and water in Kuwait. Also I thank Doha West Power Station where I did my training. And I thank the employees in the station specially engineering Imad Alktan who stands with as in the training.…

    • 4276 Words
    • 18 Pages
    Powerful Essays
  • Good Essays

    doha west power station

    • 707 Words
    • 3 Pages

    Doha west power Generation and Water Distillation Station is one of the main base load plants of the country governed by the ministry of electricity and water, government of Kuwait. This power station is situated in Doha, located approx. 15 km to the west of Kuwait city. This power station is composed of eight power generating units of 300 M.W. capacity each and 16 water distillation units of 6/6.2 million imperial gallons per day capacity each. In all, power station is capable of generating 2400 M.W. (8 x 300 MW) Electric power and producing 110. ( 4 x 6 + 12 x 7.2) million imperial gallon of distilled water per day.…

    • 707 Words
    • 3 Pages
    Good Essays