CONTRACT PROPOSAL Attention: OWNER / CONTRACTOR
Dear Sir / Ma’am,
We are pleased to offer you our RMC quotation on the requirements you had inquired about. Strength
Aggregate Size
Curing Days
Remarks
Price per cu.m
3000 psi
3/4
28 Days
PCD
3,500.00
3000 psi
3/4
28 days
ORD
3,400.00
3000 psi
G1
28 days
ORD
3,300.00
Pumpcrete Rental :
Line Pump
From the ground to 5th level – Php 9,500.00 for a minimum of 50 cubic meters per set-up. In excess of 50 cu meters, an additional of Php 200.00 per cubic meter will be charged.
Boom Type (28/32 meters)
From the ground to 5th level – Php 10,000.00 for a minimum of 50 cubic meters per set-up. In excess of 50 cubic meters, an additional Php 220.00 per cubic meter will be charged.
Boom Type (37 meters)
From the ground to 5th level – Php 12,500.00 for a minimum of 50 cubic meters per set-up. In excess of 50 cubic meters an additional Php 250.00 per cubic.
Above 5th level – additional Php 15.00 per cubic meter per floor.
Additional Php 10.00 per cubic meter per concrete pipe beyond 20 pieces for line Pump and 5 pipes for the boom type pumps.
Additional php 1,000.00 per hour in excess of the 4 hours allowable standby time from the moment the pumpcrete has been set-up.
Php 10,000.00 will be charged if the pumpcrete has been mobilized then the schedule was cancelled
Lead Time : Three (3) Days from receipt of P.O & Approval from C&C.
Payment Terms : Cash On Delivery / Dated Check Other Reminders
No purchase order, no pouring
Minimum of 6 cubic meters per mixer truck. Underload charge is Php 500.00 per cubic meter.
Concrete prices are subject price escalation without prior notice
Customers will provide safety scaffholdings,