Preview

Rmc Quotation

Satisfactory Essays
Open Document
Open Document
477 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Rmc Quotation
READYMIX CONCRETE SUPPLY
Office Address: Unit 402 Blg.2 East Summit Residences Ortigas Ext Ave. Cor Brookside Subd. Brgy. San Isidro Cainta Rizal
Tel. No.: (02)399-4816 / Fax No.: (02)909-8385

CONTRACT PROPOSAL Attention: OWNER / CONTRACTOR

Dear Sir / Ma’am,
We are pleased to offer you our RMC quotation on the requirements you had inquired about. Strength
Aggregate Size
Curing Days
Remarks
Price per cu.m
3000 psi
3/4
28 Days
PCD
3,500.00
3000 psi
3/4
28 days
ORD
3,400.00
3000 psi
G1
28 days
ORD
3,300.00

Pumpcrete Rental :
Line Pump
From the ground to 5th level – Php 9,500.00 for a minimum of 50 cubic meters per set-up. In excess of 50 cu meters, an additional of Php 200.00 per cubic meter will be charged.
Boom Type (28/32 meters)
From the ground to 5th level – Php 10,000.00 for a minimum of 50 cubic meters per set-up. In excess of 50 cubic meters, an additional Php 220.00 per cubic meter will be charged.
Boom Type (37 meters)
From the ground to 5th level – Php 12,500.00 for a minimum of 50 cubic meters per set-up. In excess of 50 cubic meters an additional Php 250.00 per cubic.
Above 5th level – additional Php 15.00 per cubic meter per floor.
Additional Php 10.00 per cubic meter per concrete pipe beyond 20 pieces for line Pump and 5 pipes for the boom type pumps.
Additional php 1,000.00 per hour in excess of the 4 hours allowable standby time from the moment the pumpcrete has been set-up.
Php 10,000.00 will be charged if the pumpcrete has been mobilized then the schedule was cancelled

Lead Time : Three (3) Days from receipt of P.O & Approval from C&C.
Payment Terms : Cash On Delivery / Dated Check Other Reminders
No purchase order, no pouring
Minimum of 6 cubic meters per mixer truck. Underload charge is Php 500.00 per cubic meter.
Concrete prices are subject price escalation without prior notice
Customers will provide safety scaffholdings,

You May Also Find These Documents Helpful

  • Good Essays

    Week 8 ACCT504 Final Exam

    • 3080 Words
    • 36 Pages

    6. (TCOs A, E) Equipment was purchased for $60,000. Freight charges amounted to $2,800 and there was a cost of $8,000 for building a foundation and installing the equipment. It is estimated that the…

    • 3080 Words
    • 36 Pages
    Good Essays
  • Good Essays

    Total Cost = ($40 * 5 units of labor) + ($60 * 7 units of land) + ($60 * 2 units of capital) + ($20 * 1 unit of entrepreneurial ability) = $200 + $420 + $120 + $20 = $760.…

    • 673 Words
    • 3 Pages
    Good Essays
  • Good Essays

    TechMall Case Analysis

    • 925 Words
    • 3 Pages

    - Setup fee: $750 (nonrefundable) except for merchants who set up in beta test period.…

    • 925 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Distrigas Corporation

    • 1217 Words
    • 5 Pages

    Q1. As per the provided information the Gas Utility companies pays a base commodity charge of $.3359 plus a peak usage demand of charge that is $4.63 per Mcf multiplied by the total demand during the maximum take day in the last 12 months which is 240 in this case. The cost per MCF can be derived by the below formula…

    • 1217 Words
    • 5 Pages
    Good Essays
  • Better Essays

    Caledonia Products recently acquired a new financial analyst assistant. Before “unleashing” the new assistant into a solo position Caledonia Products has set a huge task. The new assistant has to take under consideration a new investment, of creating and distributing a new product. The new project would last five years and cost a total of $1,000,000 over the course of the five years. The assistant will be both calculating the cash flows associated with the new investment as well as evaluate several mutually exclusive projects, (Titman, Keown, & Martin, 2011). The assistant must answer several key questions:…

    • 1189 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    BOEING AUSTRAILIA (BAL)

    • 2120 Words
    • 9 Pages

    Based on a 6 month to a year setup and implementation process BAL at a cost of AD $995,000.…

    • 2120 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    A cost is $3,600 at 1,000 units, $7,000 at 2,000 units, and $9,200 at 3,000 units. This cost is a…

    • 358 Words
    • 5 Pages
    Satisfactory Essays
  • Good Essays

    Destin Brass

    • 853 Words
    • 4 Pages

    Destin Brass produces three products used for water purification systems: valves, pumps and flow controllers. They are seeing high competition in the pumps market while competitors are reducing the prices on pumps. Because they do not have any design advantages to their product, they feel they need to follow the market and lower their prices as well. A meeting was held to discuss the declining profits and a proposal to change their overhead allocation method was proposed.…

    • 853 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    The subtitle D disposal is significantly more expensive than a regular clean soil disposal facility. 6. RATIOS AND ANALYSIS The 80/20 Rule This test states that 80 percent of the cost will lie in 20 percent of the line items. Different estimates will have different cost drivers. Those items that will have the most significant cost impact should be examined in detail to confirm they are being correctly estimated. Validating by Benchmarking There should be historical data available from past projects from which to compare back and ‘sniff test’ against. Quick high level conceptual estimating techniques may be used to ‘sanity check’ the costs such as, “we have done 3 similar projects which were at $14/SF all in at the end of the day”. If large deltas are discovered, then a more thorough inspection of the detail would need to be carried out. This can be a quick and fairly efficient way to check. 7. MISCELLANEOUS PERTINENT INFORMATION:  Cubic yards may be converted to cubic meters by multiplying the cubic yards by 0.7646.  Rain makes the soil unsuitable for backfill and may require water to be pumped.  Soils report for soil conditions will dictate method of excavation that must be used.  Deep excavation will require shoring, trench box or over excavation.  Is there an adequate area to store excavated material if needed?  Water table should be known and addressed if high enough to cause problems.  Overhead power lines should be identified and…

    • 3396 Words
    • 14 Pages
    Powerful Essays
  • Good Essays

    about $3, a month (Fadiman, 1997, p. 128). I remember that in the video, it…

    • 484 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Fixed and Variable Costs

    • 421 Words
    • 2 Pages

    The costs per unit were then calculated. It was found that the raw materials cost were $650 for the year and a 1000 units were sold. That means the cost per unit was .65 ($650/1000). It was found that the building rent cost was $9000 for the year. That means the cost per unit was $9 ($9000/1000).…

    • 421 Words
    • 2 Pages
    Good Essays
  • Good Essays

    The cost of this was explained as 150bht per adult and 90bht per child less than 12 years of age.…

    • 951 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    The minimum financial requirement to open a KFC in the United States is $1.5 million net worth and $750,000 in liquid assets.…

    • 518 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Cvp Exercises

    • 587 Words
    • 3 Pages

    Assume Unit Selling Price of Php 5,000, Unit Variable Cost of Php 4,200, Total Fixed…

    • 587 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    are interested to get the cost information at a plant level and /or at a…

    • 1043 Words
    • 6 Pages
    Good Essays

Related Topics