Preview

Safety Life and Safety Rules

Good Essays
Open Document
Open Document
956 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Safety Life and Safety Rules
Chennai Monorail is a rail-based transit system for the Indian city ofChennai. It is proposed in the Long-term Urban Transportation Scheme of Second Master Plan by CMDA. The state government has announced plans to introduce monorail across City to reduce traffic congestion and to increase the share of public transport in the urban transport network. The aim is to increase the share of public transport in Chennai from 27% to 46% by 2026
Chief Minister Jayalalithaa, through the Governor Surjit Singh Barnala's address to the assembly, stated that the Chennai Monorail project of around 300 km will be revived and would supplement the existing metro rail systems that were implemented by the previous DMK government. This will also, when completed, be the world's largest monorail network.
-------------------------------------------------
Project cost[edit]
The 111-km long, first phase of the Chennai Monorail project is proposed at a cost of 166,500 million.[17] The per-kilometre cost of the Chennai monorail will be around 1,500 million. The revised 54-km-long, phase-I of the monorail is estimated to cost 80,500 million.
Monorail project, a Rs.8000 crore dream project of the TN government, covering an area of 57 kms to connect the people of Chennai and its suburbs by means of another method of railways will be started from June this year.

The Tamil Nadu Government has formed a committee and making several investigations for the procurement of land that the project needed. According to the latest information, the monorail project has decided to construct at least 37 stations for the passengers safety. The work of monorail would be completed with the construction of three different stretches - one from Velachery to Vandalur, the second from Poonamallee to Vadapalani and Poonamallee to Kathipara.

It is said that the Tenders for the construction of Monorail project will be called for this month and many companies are interested to take up the project. However,

You May Also Find These Documents Helpful

  • Satisfactory Essays

    In return the new CPR Syndicate was to complete the railway in 10 years. With the Syndicate in place, the path of the railway was altered. The first year of construction hadn’t gone well. They only finished 230km in a…

    • 171 Words
    • 1 Page
    Satisfactory Essays
  • Satisfactory Essays

    |1. |Approves funding for this project? |High Speed and Intercity Passenger Rail Program (HSIPR) by the |…

    • 1144 Words
    • 5 Pages
    Satisfactory Essays
  • Best Essays

    Bibliography: ‘Indian Railways: preparing for another sunrise ' 2001, The Hindu, 30 August. Retrieved May 20, 2007, from http://www.thehindujobs.com/thehindu/2001/08/30/stories/0630089e.htm…

    • 3711 Words
    • 15 Pages
    Best Essays
  • Best Essays

    escalation of commitment

    • 2084 Words
    • 9 Pages

    Greening J., (2012). High Speed Rail: Investing in Britain’s Future – Decisions and Next Steps. Available: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/3648/hs2-decisions-and-next-steps.pdf. Last accessed 15th Oct 2013.…

    • 2084 Words
    • 9 Pages
    Best Essays
  • Powerful Essays

    The first step concerns of introducing Land transport and Railways mode. Second step is showing the Strength and Weakness Analysis of Railways then discuss in details on Strength and Weakness points.…

    • 2173 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    Case Study: Underpinning

    • 1533 Words
    • 7 Pages

    MMC Corporation Berhad (MMC) is a utilities and infrastructure group with interests in Transport & Logistics, Energy & Utilities and Engineering & Construction. MMC's key businesses include the Port of Tanjung Pelepas and Johor Port in the Transport & Logistics segment. In Energy & Utilities, MMC has controlling stakes in Malakoff, Gas Malaysia and Aliran Ihsan.…

    • 1533 Words
    • 7 Pages
    Powerful Essays
  • Better Essays

    The bridge has provisions for rail, gas, electric line and fibre optic cable for future expansion. The project would have co-financed by the government of Bangladesh, the World Bank, the Asian Development Bank, the Japan International Cooperation Agency (JICA) and the…

    • 1200 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    Pearl river delta

    • 536 Words
    • 3 Pages

    Over the next six years, around 150 major infrastructure projects will mesh the transport, energy, water and telecommunications networks of the nine cities together, at a cost of some 2 trillion yuan (£190 billion). An express rail line will also connect the hub with nearby Hong Kong.…

    • 536 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    The largest highway project in India and the fifth longest in the world[citation needed], it is the first phase of the National Highways Development Project (NHDP), and consists of building 5,846 km (3,633 mi) four/six lane express highways at a cost of 60,000 crore (US$10.92 billion).[1]The four-lane system was constructed between 1999 and 2012, and is currently being expanded to six lanes throughout.…

    • 1166 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Mumbai Monorail

    • 657 Words
    • 3 Pages

    Vilasrao Deshmukh, the then Chief Minister of Maharashtra, cleared the notification for construction of the first monorail system in India on August 13, 2008. The system will traverse through Jacob Circle, Wadala, Mahul and Chembur, paving the way for a feeder service to the existing suburban railway network[8]…

    • 657 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    The project statistics tell that 91% percent of the civil work of Line 7 and 91.35% of ciil works of Line 8 is complete, as noted in the last of March. In the row, the ITO-Kashmere Gate section is planned to be completed this month and Mundka-Bahadurgarh and Dwarka-najafgarh line are presumed to be completed in December.…

    • 1230 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    project scheduling

    • 1199 Words
    • 5 Pages

     Abshenasan project: this Project includes a bridge and a U-turn bridge in Abshenasan Highway. The cost…

    • 1199 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    assigment economi

    • 1635 Words
    • 5 Pages

    When asked about the timeline of the project, Mr Syed Hamid said construction of the rail could start in the third quarter of next year.…

    • 1635 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    The intermodal station has been mentioned in newspapers during years. Will be a reality its first phase in this term of office? What will represent for…

    • 2212 Words
    • 9 Pages
    Good Essays
  • Powerful Essays

    One of the latest ones is to build Northern Gateway, this will expand the passenger terminal in the airport. This terminal expansion project will consist a new building with 2 floors, the size of it will be 214 meters long and 28 meters wide. This project will be built in the non-Schengen zone and will open 23 new gates with bridges for passenger boarding. The location of the new building will not be far away, only 240 meters away from already existing terminal. The expenses of this new terminal are approximately 115 million euros.…

    • 1372 Words
    • 6 Pages
    Powerful Essays