Electrical Maintenance Level IV Name: Nicohlas Mclean NQR #: 070034234 Instructor: Mr. F.Hibbert Date: February 2013 Unit:
TABLE OF CONTENTS
Contents ` Page TABLE OF CONTENTS 1 INTRODUCTION 2
SAFETY INSTRUCTIONS..............................................................................................................3
ERECTION PROCEDURE...............................................................................................................4
DISMANTLING PROCEDURE.......................................................................................................5
TYPES OF SCAFFOLDING............................................................................................................6
ADVANTAGES OF USING SCAFFOLDING................................................................................7
MATERIAL USED TO MAKE SCAFFOLDING............................................................................7
10 MANUFACTURES SCAFFOLDING.........................................................................................8
HAZARDS………………………………………………………………………………………..9
DRAWING.......................................................................................................................................10
INTRODUCTION
This is a completed project on scaffolding it entails safety precautions, how to assemble and disassemble scaffolds, it also has advantages of using scaffolds over other types of equipment and has a drawn scaffold.
SAFETY INSTRUCTIONS
• Ensure that there is no building refuse falling or collecting on the Scaffold. Immediately clean the refuse.
• When climbing onto or descending the Scaffold only the delivered material for this activity must be used. Never improvise or deviate using other materials or methods. Always climb the scaffold from the inner side of the scaffold.
• Do not use the Scaffold in unsafe