See Immediate Causes
1
Struck against (running or bumping into) Struck by (hit by moving object)
1, 2, 4, 5, 6, 9, 11, 12, 13, 14,15, 16, 17,18,19,20,21, 22, 23, 24, 25, 27, 31, 39, 40
2
Fall from elevation to lower level fall on same level (slip and fall, trip over)
3, 4, 5, 6, 7, 9, 11, 12, 13, 14, 15, 16, 17, 19, 21, 22, 23, 26, 27,31, 33, 36, 40
3
Caught in (pinch and nip points) Caught on (snagged, hung) Caught between or under (crushed or amputated)
4, 5, 6, 9, 10, 11, 12, 15, 16, 17, 18, 19, 21, 22, 23, 24 35
4
Contact with (electricity, heat, cold, radiation, ignition source, caustics, toxics, biological, noise, plant and equipment.
2, 3, 5, 6, 7, 8, 9, 11, 12, 13, 14, 15, 16, 17, 18, 20, 21, 23, 24, 25, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 40
5
Abnormal Operating conditions, following temporary instructions
1, 2, 3, 6, 9, 11, 12, 14, 15, 16, 17, 18, 19, 20, 23, 24, 25, 27, 31, 33, 34, 35, 36, 37, 38
6
Product Contamination, process systems, storage tank, shipping, external stakeholder
1, 2, 3, 6, 9, 11, 12, 14, 15, 16, 17, 18, 19, 20, 23, 24, 25, 27, 31, 33, 34, 35, 36, 37, 38
7
Overstress (over-exertion, overload, over-exposure, ergonomic, human factor man and machine interface
3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 15, 16, 17, 18, 19, 20, 24, 25, 35, 37, 40
8
Equipment failure, instrument, piping, pump, vessel, etc
1, 4, 6, 8, 16, 18, 23, 25, 30, 32, 33, 34, 35, 37, 38, 40, 41, 42, 43, 44, 45
9
Environmental pollution, inside of site boundary
1, 2, 3, 5, 6, 8, 9, 12, 15, 16, 17, 18, 19, 20, 23, 25, 26, 30, 32, 33, 34, 35, 36, 38, 41, 42, 43, 44, 45
10
Environmental pollution, outside of site boundary
1, 2, 3, 5, 6, 8, 9, 12, 15, 16, 17, 18, 19, 20, 23, 25, 26, 30, 32, 33, 34, 35, 36, 38, 41, 42, 43, 44, 45
11
Loss of containment - any classified substance
1, 4, 5, 6, 8, 9, 10, 12, 13,14, 15, 16, 17, 18, 20, 25, 31, 34, 35, 36, 41, 42, 43, 44, 45
12
Release of substances to a closed system via a relief valve or over pressure protection system
1, 4, 5, 6, 8, 9, 10, 12, 13,14, 15, 16, 17, 18, 20, 25, 31, 34, 35, 36, 41, 42, 43, 44, 45
13
Mobile plant or equipment - road traffic vehicle – contact with operating plant or equipment
1, 4, 5, 6, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 21, 23, 24, 27, 28, 31, 33, 36, 37, 39, 40, 41, 42, 43, 44, 45
IMMEDIATE CAUSES
SUBSTANDARD ACTS
See Basic Causes
SUBSTANDARD ACTS
See Basic Causes
SUBSTANDARD CONDITIONS
See Basic Causes
SUBSTANDARD CONDITIONS
See Basic Causes
1
Operating equipment without authority
2, 4, 5, 7, 8, 9, 13, 14, 16
18
Failure to check/monitor
2, 3, 4, 5, 6, 7, 9, 10, 12, 13, 14, 15, 16
21
Inadequate guards or barriers
5, 9, 10, 11, 12, 13, 15
38
Inadequate communications hardware/ software process
7, 9, 10, 11, 12, 13, 15, 16
2
Failure to warn
1, 2, 3, 4, 5, 6, 7, 8, 9, 11, 15, 16
19
Failure to react/correct
1, 2, 3, 4, 5, 6, 7, 9, 13, 14, 16
22
Inadequate or improper protective equipment
5, 7, 8, 9, 10, 11, 12, 13, 15
3
Failure to secure
1, 2, 3, 4, 5, 6, 7, 8, 9, 12, 13, 14
20
Failure to communicate/ coordinate
3, 4, 5, 7, 9, 10, 16
23
Defective tools, equipment or materials
8, 9, 10, 11, 12, 13, 15
39
Road conditions
5, 7, 8, 9, 10, 12, 13, 14, 15
4
Operating at improper speed
2, 3, 4, 5, 6, 7, 8, 9, 10, 13, 14,
41
Failed to respond to an alarm
3, 4, 5, 6, 7, 8, 9, 14, 16,
24
Congestion or restricted action
9, 10, 11, 14
40
Weather conditions
5, 7, 9, 13, 14, 16
5
Making safety devices inoperative
2, 3, 4, 5, 6, 7, 8, 9, 10,
42
Failed to respect a safety warning notice
3, 4, 5, 6, 7, 8, 9, 14, 16,
25
Inadequate warning system
8, 9, 10, 11, 12, 13, 14, 15, 16
45
Biological hazards
5, 6, 7, 9, 10, 14
6
Using defective equipment
2,3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16
43
Individual was not following good / best practice procedures or methods
5, 6, 7, 9, 14, 16
26
Fire and explosion hazards
5, 6, 7, 8, 9, 10, 11, 12, 13, 15
46
Poor illumination or ventilation
5, 6, 7, 9, 10, 14
7
Failing to use PPE properly
1, 2, 3, 4, 5, 7, 8, 9, 11, 12, 13, 14, 15, 16
44
Failed to follow guidance / instruction from supervision
5, 6, 7, 9, 14, 16
27
Poor housekeeping disorder
7, 8, 9, 10, 12, 14, 15
47
Defective tools – equipment - infrastructure
5, 6, 7, 9, 10, 14
8
Improper loading
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14
28
Noise exposure
5, 7, 8, 9, 10, 11, 12, 13, 14, 16
9
Improper placement
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 12, 13, 14
29
Radiation exposure
5, 7, 8, 9, 10, 11, 12, 13, 14, 16
10
Improper lifting
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 14,
30
Temperature extremes
5, 7, 9, 10, 14
11
Improper position for task
1, 2, 3, 4, 5, 6, 7, 9, 10, 13, 14, 16
31
Inadequate or excess illumination
5, 7, 9, 10, 11, 12, 13, 15
12
Servicing equipment in operation
3, 4, 5, 6, 7, 8, 9, 10, 12, 13, 14, 15, 16
32
Inadequate ventilation
5, 7, 9, 10, 12, 13, 15
13
Horseplay
2, 3, 4, 5, 7, 8, 9, 14
33
Presence of harmful materials
5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16
14
Under influence alcohol and/or other drugs
1, 2, 3, 4, 5, 7, 8, 9, 14
34
Inadequate instructions/procedures
5, 6, 7, 9, 10, 14, 16
15
Using equipment improperly
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 13, 14, 15, 16
35
Inadequate information/data
5, 6, 9, 10, 11, 12, 16
16
Failure to follow procedure/policy/practice
1, 2, 3, 4, 5, 6, 7, 8, 9, 14, 16
36
Inadequate preparation/planning
5, 6, 7, 9, 14, 16
17
Failure to identify hazard/risk
3, 4, 5, 6, 7, 9, 14
37
Inadequate support/assistance
7, 9, 11, 12,16
ROOT/UNDERLYING CAUSES
PERSONAL FACTORS
JOB FACTORS
1
Inadequate Physical/Physiological Capability
4.6
“Meaningless” or “degrading” activities
9
Inadequate Leadership and/or Supervision
12.2
Inadequate reparative
16
Inadequate Communications
1.1
Inappropriate height, weight, size, strength, reach etc.
4.7
Confusing directions/demands
9.1
Unclear or conflicting reporting relationships
12.2.1
Communication of needs
16.1
Inadequate horizontal communication between peers
1.2
Restricted range of body movement
4.8
Conflicting demands/directions
9.2
Unclear or conflicting assignment of responsibility
12.2.2
Scheduling of work
1.3
Limited ability to sustain body positions
4.9
Preoccupation with problems
9.3
Improper or insufficient delegation
12.2.3
Examination of units
16.2
Inadequate vertical communication between supervisor and person
1.4
Substance sensitivities or allergies
4.10
Frustration
9.4
Giving inadequate policy, procedure, practices or guidelines
12.2.4
Part substitution
1.5
Sensitivities to sensory extremes (temperature, sound etc)
4.11
Mental illness
9.5
Giving objectives, goals or standard that conflict
16.3
Inadequate communication between different organisations
1.6
Vision deficiency
9.6
Inadequate work planning or programming
13
Inadequate Tools and Equipment
1.7
Hearing deficiency
5
Lack of Knowledge
9.7
Inadequate instructions, orientation and/or training
13.1
Inadequate assessment of needs and risks
16.4
Inadequate communication between work groups
1.8
Other sensory deficiency (touch, taste, smell, balance)
5.1
Lack of experience
9.8
Providing inadequate reference documents
13.2
Inadequate human factors/ergonomic considerations
1.9
Respiratory incapacity
5.2
Inadequate orientation
9.9
Inadequate identification and evaluation of loss exposures
13.3
Inadequate standards or specifications
16.5
Inadequate communication between shifts
1.10
Other permanent physical capabilities
5.3
Inadequate initial training
9.10
Lack of supervisory / management job knowledge
13.4
Inadequate availability
1.11
Temporary disabilities
5.4
Inadequate update training
9.11
Inadequate matching of individual qualifications and job/task requirements
13.5
Inadequate adjustment/repair/maintenance
16.6
Inadequate communication methods
5.5
Misunderstood directions
9.12
Inadequate performance measurement and evaluation
13.6
Inadequate salvage and reclamation
16.7
No communication method available
2
Inadequate Mental/Psychological Capability
9.13
Inadequate or incorrect performance feedback
13.7
Inadequate removal and replacement of unsuitable items
16.8
Incorrect instructions
2.1
Fears and phobias
6
Lack of Skill
16.9
Inadequate communication due to job turnover
2.2
Emotional disturbance
6.1
Inadequate initial instruction
10
Inadequate Engineering (Either in design or construction)
14
Inadequate Work Standards
2.3
Mental illness
6.2
Inadequate practice
10.1
Inadequate assessment of loss exposures
14.1
Inadequate development of standards for
16.10
Inadequate communication of safety and health data, regulations or guidelines
2.4
Intelligence level
6.3
Infrequent performance
10.2
Inadequate consideration of human factors/ergonomics
14.1.1
Inventory & evaluation of exposures & needs
2.5
Inability to comprehend
6.4
Lack of coaching
10.3
Inadequate standards, specifications and/or design criteria
14.1.2
Coordination with process design
16.11
Standard terminology not used
2.6
Poor coordination
6.5
Inadequate review instructions
10.4
Inadequate monitoring of construction
14.1.3
Employee involvement
16.12
Verification/repeat feedback techniques not used
2.7
Slow reaction time
10.5
Inadequate assessment of operational readiness
14.1.4
Procedures/practices/rules
2.8
Low mechanical aptitude
7
Improper Motivation
10.6
Inadequate or improper controls
14.2
Inadequate communication of standards for
16.13
Messages too long
2.9
Low learning aptitude
7.1
Improper performance is rewarded (tolerated)
10.7
Inadequate monitoring or initial operation
14.2.1
Publication
16.14
Speech interference
2.10
Memory failure
7.2
Proper performance is punished
10.8
Inadequate evaluation of changes
14.2.2
Distribution
7.3
Lack of incentives
14.2.3
Translation of appropriate languages
3
Physical or Physiological Stress
7.4
Excessive frustration
11
Inadequate Purchasing
14.2.4
Training
3.1
Injury or illness
7.5
Inappropriate aggression
11.1
Inadequate specifications on requisitions
14.2.5
Reinforcing with sings, colour codes and job aids
3.2
Fatigue due to task of load or duration
7.6
Improper attempt to save time or effort
11.2
Inadequate research on materials/equipment
14.3
Inadequate maintenance of standards for
3.3
Fatigue due to lack of rest
7.7
Improper attempt to avoid discomfort
11.3
Inadequate specifications to vendors
14.3.1
Tracking of work flow
3.4
Fatigue due to sensory overload
7.8
Improper attempt to gain attention
11.4
Inadequate mode or route of shipment
14.3.2
Updating
3.5
Exposure to health hazards
7.9
Inadequate discipline
11.5
Inadequate receiving inspection and acceptance
14.3.3
Monitoring use of procedures/ practices/ rules
3.6
Exposure to temperature extremes
7.10
Inappropriate peer pressure
11.6
Inadequate communication of safety and health data
14.4
Inadequate monitoring of compliance
3.7
Oxygen deficiency
7.11
Improper supervisory example
11.7
Improper handling of materials
3.8
Atmospheric pressure variation
7.12
Inadequate performance feedback
11.8
Improper storage of materials
15
Excessive Wear and Tear
3.9
Constrained movement
7.13
Inadequate reinforcement of proper behaviour
11.9
Improper transporting of materials
15.1
Inadequate planning of use
3.10
Blood sugar insufficiency
7.14
Improper production incentives
11.10
Inadequate identification of hazardous materials
15.2
Improper extension of service life
3.11
Drugs
11.11
Improper salvage and/or waste disposal
15.3
Inadequate inspection and/or monitoring
8
Abuse or Misuse
11.12
Inadequate contractor selection
15.4
Improper loading or rate of use
4
Mental or Psychological Stress
8.1
Improper conduct that is condoned
12
Inadequate Maintenance
15.5
Inadequate maintenance
4.1
Emotional overload
8.1.1
Intentional
12.1
Inadequate preventive
15.6
Use by unqualified or untrained people
4.2
Fatigue due to mental task load or speed
8.1.2
Unintentional
12.1.1
15.7
Use for wrong purpose
4.3
Extreme judgement/decision demands
8.2
Improper conduct that is not condoned
12.1.2
Lubrication and servicing
4.4
Routine, monotony, demand for uneventful vigilance
8.2.1
Intentional
12.1.3
Adjustment/assembly
4.5
Extreme concentration / perception demands
8.2.2
Unintentional
12.1.4
Cleaning or resurfacing
You May Also Find These Documents Helpful
-
5, 7, 22, 4, 12, 9, 9, 14, 3, 6, 5, 8, 10, 17, 12, 10, 9, 4, 3, 13…
- 640 Words
- 4 Pages
Good Essays -
2 3 3 3 4 4 5 5 5 5 6 6 7 7 7 8 8 8 9 9 9 10 10 11 11 11 12 12 12 12 13 13 14 15 16 17 18 19 20 21…
- 5465 Words
- 22 Pages
Powerful Essays -
45, 63, 78, 89, 95, 99, 105, 141, 148, 156, 160, 161, 164, 212, 217…
- 2271 Words
- 10 Pages
Better Essays -
2, 2, 0, 5, 1, 4, 1, 3, 0, 0, 1, 4, 4, 0, 1, 4, 3, 4, 2, 1, 0…
- 1337 Words
- 6 Pages
Good Essays -
24, 46, 23, 31, 32, 45, 34, 37, 28, 40, 34, 38, 40, 52, 31, 33, 15, 27, 36, 40…
- 1224 Words
- 5 Pages
Powerful Essays -
Give examples of tests of controls over customer credit approval, delivery, and accounts receivable accounting.…
- 10112 Words
- 41 Pages
Good Essays -
First we find the different of the samples. I 'll subtract the afters from the befores. Here is the column of differences:…
- 1112 Words
- 7 Pages
Satisfactory Essays -
Problem definition: Write a program that would calculate and display the results for the multiplication table for values ranging from 1 to 100.…
- 345 Words
- 2 Pages
Satisfactory Essays -
10 11 13 14 15 16 17 19 21 23 25 28 29 32 34 38 41 46 50…
- 682 Words
- 3 Pages
Satisfactory Essays -
10, 13, 10, 12, 11, 7, 12, 11, 6, 11, 12, 11, 8, 10, 9…
- 2125 Words
- 9 Pages
Powerful Essays -
3 4 5 5 8 11 12 13 16 18 19 20 21 21 21 22 22 23 24 25 25 25 26 28 29 29 31 34 38…
- 9137 Words
- 37 Pages
Powerful Essays -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28…
- 507 Words
- 3 Pages
Satisfactory Essays -
| |22, 23, 24 |28, 30, 31 |35, 36, 37, 38, 39, |43, 45 |…
- 4606 Words
- 19 Pages
Powerful Essays -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39…
- 18749 Words
- 75 Pages
Powerful Essays -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28…
- 24564 Words
- 99 Pages
Good Essays