Preview

Shipbuilding

Good Essays
Open Document
Open Document
498 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Shipbuilding
How to build a ship
By Namchul Do dnc@gnu.ac.kr http://www.tpub.com/content/advancement/14325/css/14325_196.htm

2008/12/4

contents
• • • • • • • • terms and notations roles in ship building ship building process basic differences ship yard tour ship design process -ommited detailed ship design process -ommited summary

terms and notations control input

Work 1

output

input

Work 2

roles in shipbuilding

from aveva.com, 2008

shipbuilding process
Contract Ship Design Assembly & Painting Steel Cutting steel Storage Pretreatment Erection/ launching Final Outfiting Sea Trial Delivery

contract
Contract Ship Design Assembly & Painting Steel Cutting Steel Storage Pretreatment Erection/ launching Final Outfiting Sea Trial Delivery

There are contract design activities in shipbuilding industry

contract

ship design
Contract Ship Design Assembly & Painting Steel Cutting Steel Storage Pretreatment Erection/ launching Final Outfiting Sea Trial Delivery

Structural Model (Hull) Design Outfitting Design Basic Design Detail Design Mfg Design

ship design

from www.mastership.nl/phpwcms/news.php, 2008

Structural Model (Hull) Design Outfitting Design

steel storage and cutting
Contract Ship Design Assembly & Painting Steel Cutting steel Storage Pretreatment Erection/ launching Final Outfiting Sea Trial Delivery

Two important ceremonies: steel cutting launching

steel storage and cutting from http://www.hidrodinamik.com, 2008

assembly and painting
Contract Ship Design Assembly & Painting Steel Cutting steel Storage Pretreatment Erection/ launching Final Outfiting Sea Trial Delivery

Assembly steps: manufactur subassembly unit assmebmly paint blocking

assembly steps

from aveva.com, 2008

assembly and painting

from http://www.hidrodinamik.com, 2008

erection and launching
Contract Ship Design Assembly & Painting Steel Cutting steel Storage Pretreatment Erection/ launching Final

You May Also Find These Documents Helpful

  • Powerful Essays

    | The contract has a set budget if $2,750,000 by the project sponsor. The estimated budget for the project is $2,750,000 with a timeline of 1 year and three months. Upon final completion of the project the extent will contain: 1. Manufacturing plant/building in Huntsville, AL 2. Installed equipment to effectively produce product 3. Recruiting division for managers, distribution, plant operators 4. Procured Equipment, Raw Material and Truck Fleet 5. Work and production permits…

    • 1358 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Mt435 Unit 8 Assignment

    • 1572 Words
    • 7 Pages

    The speed of manufacturing process from order to finish product is very challenging since each anchor requires its own unique equipment. Currently they have to completely change the over the manufacturing line for each type of anchor. This process makes it more time consuming and creates more work for employees.…

    • 1572 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    proposal for the Navy contract. The service to provide is flooring jobs. Having estimated the…

    • 1163 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Manufacturing consisted basically of three processes: molding, finishing, and assembly. The molding department mixed all ingredients to make the fiberglass hull, performed the actual molding, and removed the hull from the mold. Finishing included hand additions to the hull for running and standing rigging, reinforcement of the mast and tiller steps, and general sanding of rough spots. Assembly consisted of the attachment of cleats, turnbuckles, drain plugs, tiller, and so forth, and the inspection of the boat with mast,…

    • 827 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Vikings were well known for their technologically advanced shipbuilding. The ships featured key components that allowed them to journey to several coasts, islands, and eventually the continent of North America. The Viking’s ships are known as longships, as they ranged from 45 to 75 feet long. The ships were long and narrow with the sides tapered in toward the front and back of the boat, in order to cut through waves. This design would eventually help the Vikings cross the rough North Atlantic Ocean. This is an essential design element that would be replicated and modified by ship builders for centuries. Another unique component of a longship was that the sides of the boat are rounded. This was done so by overlapping planks of wood along the…

    • 413 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Fell Fab Products

    • 413 Words
    • 2 Pages

    First one is to negotiate with NAA to become their full interior supplier. At the moment they are just accounted for 35% of…

    • 413 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Hazop study

    • 2923 Words
    • 12 Pages

    While all such designing and piping layout is being done for the ship systems, they are always subject to or prone to…

    • 2923 Words
    • 12 Pages
    Powerful Essays
  • Good Essays

    This memo is to bring awareness to the operational gap within the Engineering and Product Delivery department (EPDD) in the organization. The project office notified the EPDD with the preliminary booked project assignments for the next calendar year. The EPDD is operating at full capacity and does not have additional capacity to work on new projects. For the past three months the EPDD engineers are reporting more than 40 hours a week with an average of 50. Based on the upcoming projects, there is an immediate need to hire three experienced engineers. By filling the gap, this will allow the new hires to come up to speed in time and work on the new upcoming assignments as soon as possible with little interruption. These positions will enhance the EPDD team’s ability to demonstrate innovative solutions rapidly and deliver our new flag ship product to more customers on time. The following job analysis and position descriptions, qualifiers, and requirements propose to meet the organizational goals.…

    • 920 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    General arrangement

    • 2144 Words
    • 9 Pages

    According to LRS at least the following watertight bulkheads are to be fitted in all crafts.…

    • 2144 Words
    • 9 Pages
    Satisfactory Essays
  • Powerful Essays

    Marpol Annex Iv

    • 7910 Words
    • 32 Pages

    Introduction These Guidance Notes have been prepared and updated for the use of Lloyd’s Register (LR) Group Surveyors, Ship Owners and Ship Managers. They provide guidance on the requirements of MARPOL 73/78, Annex VI, Regulation 12 (hereafter referred to as Revised MARPOL Annex VI).…

    • 7910 Words
    • 32 Pages
    Powerful Essays
  • Powerful Essays

    Report on Bikaji

    • 8915 Words
    • 36 Pages

    Today Bikaner is identified for tasty, mouth watering snacks Bhujia, papads, Namkeens, which have titillated the plates of many a number of royal Rajput families through the age.…

    • 8915 Words
    • 36 Pages
    Powerful Essays
  • Powerful Essays

    Supermarket Zero Carbon

    • 33989 Words
    • 136 Pages

    Tata Steel is one of the world’s top ten steel producers. The combined group has an aggregate crude steel capacity of more than 28 million tonnes and approximately 80,000 employees across four continents. www.tatasteeleurope.com The principal objectives of the association are to promote the use of structural steelwork, to assist specifiers and clients, to ensure that the capabilities and activities of the industry are widely understood and to provide members with professional services in technical, commercial, contractual, quality assurance and health & safety matters. www.steelconstruction.org…

    • 33989 Words
    • 136 Pages
    Powerful Essays
  • Good Essays

    Subsea Hardware

    • 941 Words
    • 4 Pages

    INNOVATIVE AND COST EFFECTIVE ENGINEERING, EQUIPMENT AND MANUFACTURING SERVICES FOR THE SUBSEA OIL & GAS INDUSTRY…

    • 941 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    In this term project, a seaport terminal is selected to calculate the current throughput capacity based on the data measured in google earth and found on the official website. Then we should propose a modified berth layout by changing the existing berth to include an indented berth, and estimate the increasing rate of the annual throughput capacity.…

    • 1191 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    Marine Engineering

    • 1036 Words
    • 5 Pages

    Not all marine engineering is concerned with moving vessels. Offshore construction, also called offshore engineering, ocean engineering or maritime engineering, is concerned with the technical design of fixed and floating marine structures, such as oil platforms and offshore wind farms.…

    • 1036 Words
    • 5 Pages
    Good Essays

Related Topics