Preview

Siwes Report

Good Essays
Open Document
Open Document
1043 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Siwes Report
SUBMITTED TO THE INDUSTRIAL TRAINING COORDINATING CENTRE (ITCC) IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE COMPLETION OF THE 300 LEVEL INDUSTRIAL TRAINING PROGRAMME
NOVEMBER-JANUARY 2010.
Adeniran Obafemi O.
Department of Electrical/ Electronics Engineering
University of Ibadan,
Ibadan, Nigeria.
20th of february, 2010.
The Director,Student Industrial Work Experience Scheme,
Industrial Training Coordinating Centre,
University of Ibadan,
Ibadan.
Dear Sir,
SUBMISSION LETTER FOR TIT 399 REPORT WORKHaving completed the eight weeks training programme required by the Student Industrial Work Experience Scheme (SIWES), which started on the 16th of November, 2010 and ended on the 15th of January, 2010, I hereby write to inform you that the report work was compiled and completed by me. I therefore submit the report work as partial fulfillment of the requirements for the student industrial work experience scheme of the University of Ibadan.
Yours sincerely,
Adeniran Obafemi . 134196.

CERTIFICATIONI, Adeniran Obafemi Olubunmi with matriculation number 134196 hereby declare that I undergo two full months of Industrial Training Programme at Aitek Networks Systems Limited, Ikeja, Lagos and that this report is written by me to the best of the practical knowledge I gained during the course of the training programme.

----------------------------------------
134196

ABSTRACTAitek Networks Systems Limited is one of the very few indigeneous companies that is well established in the aspect of electronics engineering referred to as Surveillance or better still Extra Low Voltage. The company is staffed with hardworking, resilient, intelligent and hospitable personnels .
The sale and installation of various security devices are carried out by experts at Aitek Network Systems Limited. Devices like the smoke detectors, satellite televisions, cctv, camera, motion detectors, fire alarm systems, network systems to mention a few are sold and installed by capable

You May Also Find These Documents Helpful

  • Good Essays

    NT1330 Unit 3 Assignment 3

    • 1030 Words
    • 5 Pages

    Firewall these devices are designed to keep threats out of the company network, but unfortunately, the devices are configured by humans which can have error or security risks put in place to take over the network.…

    • 1030 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Page 7 Fault Management Reliability Availability Survivability IS3120 Network Communications Infrastructure © ITT Educational Services, Inc. All rights reserved. Page 8 Fault Management Functions RAS QA Fault localization Alarm surveillance FUNCTIONS Fault correction…

    • 599 Words
    • 9 Pages
    Satisfactory Essays
  • Better Essays

    capstone example

    • 1267 Words
    • 4 Pages

    To build and roll out a top level enterprise-wide telecommunications network for the ABC Company. As ABC’s Technical contractors meeting the ABC Company’s technical needs by meeting the requirements for each of their separate office locations in San Francisco, Detroit, Washington, Indianapolis, Tampa, Paris, Liverpool, Tokyo, and Sao Paulo. With local LANs that are in each office that connect to a WAN to share data files and multimedia. There are many different pieces of equipment needed when setting up and maintain a large business network. Each piece of equipment has many different choices in brands and even capabilities that set them apart from each other. Each piece of equipment can be detrimental to the flow and success of the network at hand. Now that we have discussed the importance of equipment on the network let us move on to discussing each piece of equipment needed to running a successful network.…

    • 1267 Words
    • 4 Pages
    Better Essays
  • Powerful Essays

    ATTACHMENT REPORT

    • 4119 Words
    • 13 Pages

    First I would like to take this opportunity to thank the almighty God for granting me good health, knowledge and sanity to write this report. I appreciate the management of the Kiambere water and sanitation company limited for giving me the humbled chance to work with their esteemed institution for my industrial attachment session. You made my stay wonderful and a big success and I learnt so much from all of you. My regards also go to all my lecturers during the entire course and my supervisor from the Kenya Institute of Management for the guidance and help he has offered me throughout the period. Sincere appreciations to my classmates who helped me in the compilation of this report, without all of you, this report could not have been complete. I would also like to thank all those who in one way or another assisted me during my attachment period and made it a success.…

    • 4119 Words
    • 13 Pages
    Powerful Essays
  • Powerful Essays

    The Telecommunication systems shall be based on converged Structured Cabling system. The IP telephony and Physical security systems shall be designed to communicate over the same network Infrastructure and utilizing wherever possible Power-over-Ethernet (PoE) technology.…

    • 1305 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    Network Management

    • 341 Words
    • 2 Pages

    31274/32528, Network Management, Autumn2012 Final exam information and Sample Exam questions Final Exam Information: The final exam is 2.0 hour duration with 10 minute reading time and will be held on 16th June 2012, Saturday (9.30 – 11.40AM). Please check the venue of your exam from UTS Exam time-table. Arrive at least 15 minutes before the scheduled exam time. A total of 15 short answer type questions. You must read through your lecture notes, text and any reference materials in order to answer these questions. Most answers will be limited to ½ or ¾ page of your answer book. Be concise and make your exam as neat as possible while answering the questions. We must be able to read your handwriting in order to be able to grade your exam. Remember you must score 40% in the final exam and a total of 50% to pass this subject. Good Luck !!! Sample Exam questions for 31274/32528, Network Management • • • • • • • • • • In Fault management what is discovering, isolating and fixing the fault? Briefly explain. In configuration management, briefly explain the difference between automatic and manual data collection methods. Give a suitable example to discuss what is Event Correlation technique? Briefly explain, what is Codebook Correlation model? Briefly explain how data analysis helps in performance management? List 3 popular performance management tools. How does digital signature protect against security threat? Briefly explain how does it work? Explain the difference between Intra-domain accounting and Inter-domain accounting. How does trend analysis help in capacity planning of a network? What advantages does a 3-tier model have over a 2-tier model used in SNMP organization? Briefly explain the role of an MIB in SNMP. What is an Object Type and how it is identified in a MIB tree (Give an Example)?…

    • 341 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Final Report of hrm at iffco

    • 9666 Words
    • 39 Pages

    The main aim of industrial training is to introduce the students with practical skills which are highly required to get an extra edge in the industry. Industrial training gives us the actual detail of the business. The training also highlights the latest reforms which are going to take place in the industries along with the passing time. In addition to this, training helps the management students to understand how the work is done through sub-ordinates.…

    • 9666 Words
    • 39 Pages
    Powerful Essays
  • Good Essays

    Wateen

    • 1504 Words
    • 7 Pages

    Brief History of CompanyWarid Telecom is a joint venture between Abu Dhabi Group & SingTel Group. Abu Dhabi Group entered into a strategic alliance with Singapore Telecom. Subsequent to this transaction in May 23 (2005), telecom giant SingTel acquired 30% percent equity stake in Warid Telecom, Pakistan, for US$758 million. This partnership is part of a strategy to support Warid Telecom’s continued growth and to enhance its market position.…

    • 1504 Words
    • 7 Pages
    Good Essays
  • Powerful Essays

    The Closed-circuit Television cam is used to monitor and transmit signals from a specific place, on a limited set of monitors. CCTV’s are connected to the website for public viewing, to provide a service to customers, to be updated of the latest weather forecast from time to time. Wireless cameras do not require a video cable for video/audio transmission, simply a cable for power. Wireless cameras are also easy and inexpensive to install. Previous generations of wireless security cameras relied on…

    • 10498 Words
    • 42 Pages
    Powerful Essays
  • Satisfactory Essays

    Tech. Support Engineer

    • 386 Words
    • 2 Pages

    (Electronic Gates – Motion Alarm Systems – Fire Alarm/Fighting Systems – Cameras' Surveillance systems - …)…

    • 386 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Project Report

    • 1644 Words
    • 7 Pages

    This is to certify that the Project Report titled “The Challenges, Surviving Strength and Recommendations on a way forward” for Jubaili Bros. Eng. Ltd and her sister companies is a bonafide work carried out by Oyewole Ezekiel Oluwasogo of The Institute of Business Adviser for fulfillment of Associate Membership of Institute of Business Adviser.…

    • 1644 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    A Minor Project thesis Submitted in partial fulfillment For the requirement of the degree of Masters of Engineering In Production Engineering…

    • 11509 Words
    • 47 Pages
    Good Essays
  • Powerful Essays

    4. Industrial and Commercial Training Volume: 42; Number: 1; Year: 2010; pp 3-10Copyright © Emerald Group Publishing Limited ISSN: 0019-7858…

    • 2160 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    Ikea Operations Management

    • 1710 Words
    • 7 Pages

    • Calvin Or • Assistant Professor, Dept of IMSE • BEng., Industrial Engineering & Engineering Management • MSc, Industrial Engineering • PhD, Industrial & Systems Engineering Contact Information…

    • 1710 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Most of the security camera systems advertise themselves as wireless, but the term leaves room for interpretation. A wireless camera can transmit data wireless to a receiver or it can load it online, yet it still needs a power source. The Netgear Arlo VMS3230 Security System is one of the few, if not the only, home surveillance system with 100% wire-free cameras. The system is suitable both for indoor and outdoor use. It is available in a one camera kit, a two camera kit or a three camera kit and all kits include free batteries for the cameras. The two camera kit is the most popular choice, and it can be acquired for $349.99. The system also allows for as many additional cameras as needed.…

    • 809 Words
    • 4 Pages
    Good Essays