1 . The machine body supplied by the company assembled units. After the user receives the machine , equipment should be checked and counted , in order to eliminate problems that may arise during transport .
2 Installation personnel should be familiar with the structure , performance and technical requirements of the product. Understand the necessary procedures and advance the development of a suitable installation process specification .
3 . Installation site needs to have sufficient lifting capacity of lifting equipment . Hanging in the rope on both sides of the body lugs ( not hanging other parts ) , between the side plates 120 × 120 square timber with a support to prevent distortion.
4 machine shipment must be careful not haul on the ground to prevent damage to the casing deformation and parts .
5 sand washing machine bracket should be installed in the reinforced concrete foundation. Basis of height , depth and the size of local soil conditions shall be calculated separately. Installation requires a flat base surface , and should have enough space for the installation and maintenance of transportation equipment .
6 preparations ① Check that no other foreign matter in the sand washing machine , spirochetes operate freely, without rubbing , cards and other phenomena in the housing . ② Check that the inner surface of the oil standard gear oil 2 / 3 . If the oil shortage , it should come on to the oil standard 2 / 3 . Reducer oil to GB5903-86 68 # load industrial gear oil , replaced once every six months . Are there appropriate amount of oil (EL-3 # lithium base oil ) within ③ Check the bearing . ④ Check the fastening parts are tightened. Check the inlet and outlet is correct, the pipeline is smooth .
7. ① empty load test must follow the first jog, after successive principle. After confirming that no abnormal sound empty