State The Problems: Rabie And Harary Case
Introduction- State the Problem
Two entrepreneurs, Rabie and Harary, started a company around a product that sprouted hair from a small humanlike head. They called this product Earth Buddy and the sales jumped pretty quickly. Sales at first started through Toronto-area flower shops and gift stores but as demand increased they were able to start selling Earth Buddy at Toys R Us, Wal-Mart, K-Mart and similar stores. The production process had few steps but was affected by the weather. With hot weather, the process was delayed two hours.
Summer is forecasted to come, which means it will be getting hot soon. This will slow production when demand is increasing. It is Ben’s task to find a solution so that these hot days do not increase process time.


You May Also Find These Documents Helpful

  • Satisfactory Essays

    With focusing on increasing the yields for the clear and the LoĒ² 272 we start with, Always have the WIN 3i system pulling from the maximum set of jobs allowed. There are times towards the end of the day or week when new orders do not get entered into the system and the amount of jobs to pull from decrease this also decreases the yield because the system is unable to fill empty spots from jobs down the queue. Another reason for there being less jobs is that there is not more orders to put in, in this case the supervisor will have to work with the plant supervisor to see how long they can hold off cutting the pieces until more orders come in to fill the queue.…

    • 369 Words
    • 2 Pages
    Satisfactory Essays
  • Best Essays

    The production timeline for Albatross Anchor’s primary product is currently at a slow pace and affecting their ability to meet their customers demand in a timely manner. One of the most noticeable is that there is a 36 hour changeover period. This creates a high production cost because during this period the employees are still being paid while no goods are being produced. When companies are placing large orders, they are taking on average four weeks to be made. Albatross Anchor maybe losing re-peat business from these clients due to the long time it takes to produce. Albatross Anchor must take action as quickly as possible in order to cure this problem without further losses. Albatross Anchor must take all possible actions to try to eliminate the 36 hour transition period or reduce it to the lowest possible level. The scientific management method can help drastically reduce this time by analyzing each step and giving it a solution. A closer in depth analysis of each step would result in a better operating procedure that would increase efficiency. One of the best ways to eliminate this problem and…

    • 1768 Words
    • 8 Pages
    Best Essays
  • Satisfactory Essays

    R V. Shankar Case Summary

    • 433 Words
    • 2 Pages

    Facts: The accused was driving his car without the required laminated taillights when officers pulled him over late October 2004. The police asked Shankar for his licence, registration, and insurance. The accused handed over a licence in the name of Jason Singh, the insurance information handwritten on an informal yellow sticky note, and a photocopy of the vehicle registration. When inquired about the spelling of name, Shankar misspelled Singh as ‘Sing’ and gave the wrong unit number for the home address. Based on these wrong answers, officers arrested Shankar on the basis of misleading them; officers physically removed Shankar from the vehicle and searched him. The officers discovered bulletproof vests on Shankar’s person, Shankar justified these on the basis of self defence and protection. When searching the vehicle police found numerous weapons including two guns, a hunting knife, and ammunition. Shankar did not testify in court, and was charged and convicted of two counts of possession of loaded, prohibited firearms and public mischief. Shankar appealed his conviction to the Ontario Court of…

    • 433 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The individual assignment for this week tasked the students to select one organization from either our week two assignment or the University material. This paper will show the data in an index using the time series data to forecast inventory for the next year. The Winter Historical Inventory Data from the (University of Phoenix, 2010) shows four years of actual demand of inventory data for the seasonal Winter Highs. Each year is divided into 12 month increments.…

    • 396 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    (BSOP334 Week 1 Lab Solutions For Faculty) Answers to Lab 1 Chapter 11: Problems 7 and 9 (Pages 504-505) 7. a. No backlogs are allowed | Period | Mar. | Apr. | May | Jun. | July | Aug. | Sep. | Total | | Forecast | 50 | 44 | 55 | 60 | 50 | 40 | 51 | 350 | | Output | | | | | | | | | | Regular | 40 | 40 | 40 | 40 | 40 | 40 | 40 | 280 | | Overtime | 8 | 8 | 8 | 8 | 8 | 3 | 8 | 51 | | Subcontract | 2 | 0 | 3 | 12 | 2 | 0 | 0…

    • 972 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    By calculating implied utilization of every process, we found that the drying process for wet berries is a bottleneck ofRP1. Utilization of dryers is 180%!!! (comparing to 8~48% of other processes, it is so problematic). Because of this bottleneck, 480 bbls of wet cranberries are not processed per hour on an average “busy” day (17,280 bbls arrive over the 12-hour period). As a result, our temporary holding bins are full from 1:40pm to 11:16pm, the dumping process (=truck waiting) is kept going until 11:16pm, and RP1 shut-down time is delayed to 4:36am. This means, our company has to pay huge money for overtime and dumping cost.…

    • 867 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Operations Management

    • 3503 Words
    • 15 Pages

    The purpose of this paper is to raise productivity and profitability at the Portland Plant by improving upon performance objectives with recommendations on forecasting methods, process layout, appropriate technology, production approach, inventory approach, and a quality approach with tools to manage, measure, and assess quality.…

    • 3503 Words
    • 15 Pages
    Powerful Essays
  • Good Essays

    In early 1981, at the National Cranberry Cooperative’s receiving plant number 1 (RP1), overtime costs are too high and delivery trucks and their drivers have to wait several hours to unload. The trucks have to wait because the plant’s holding bins fill up and there is not temporary storage. The holding bins fill up because within the cranberry operating system there is a bottleneck, a place in the production process where production slows down because of a slow or insufficient number of machines. This bottleneck is being caused by the lower relative capacity of the dryers. Relieving the bottleneck in the dryers by adding more dryers will allow the trucks to move through the dumping area more efficiently and decrease overtime costs in 1981.…

    • 681 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    CS 1 Earth Buddy

    • 710 Words
    • 3 Pages

    2. The challenge confronting Ben Varadi deals with how much to produce. His only advice that he was told by the owners was “Remain Flexible. We could get an order for 100,000 units, but if the order doesn’t arrive, we would have to put the workforce on hold. We can’t afford to carry large inventories.” With that advice, he needs to find a way to increase capacity while staying flexible and minimizing expense, which is much easier said than done. Increasing capacity is a challenge because of the weather affecting drying times as well as worker productivity so estimating how long it takes to make a finished product. The hot, humid summer days take a toll on workers and…

    • 710 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Spin Master

    • 843 Words
    • 4 Pages

    Spin master adapted to several strategies from which they gained a lot of success along with some which led them to being unsuccessful. Harary, Rabie, and Varadi started this company “spin Master” with the intentions to generate a set of long-term brands and be able to sustain a permanent place within the global toy market. Since this was the start-up of their company the 3 friends were faced with having to make key decisions. Firstly, they had to figure out a way to introduce the product they had made and find a way to market that product. Spin Master soon accomplished this by the company called Roots Canada LTD. this company was a perfect match for the product because they both followed a similar theme, “urban adventure image” both being environmentally friendly. Secondly, they were faced with having to figure out how they were going to manage the enormous order that they received from K–market. This led the 3 entrepreneurs to come together and make a decision on moving from their small kitchen production to a factory with larger accommodations so that it was fit for their 200 working employees and so that they were able to start the production of such a large order. Lastly, the biggest and most important decision they were faced with was having to create a new product that would be as successful as their first, “the earth buddy” they had to be innovative and think of a product that would be as captivating as the pantyhosed sprouting head. This was resulted with the production of the devil sticks that were a very big success in its first 6 months and gained them $1.8 million in sales.…

    • 843 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Frumherj is a car inspection company in Iceland. They are one of the largest in the country, but they want to continue to grow and to outpace their competitors. However, there are some inefficiencies in their process that must be addressed before they can meet their goals. One of their first problems is maintaining an even flow in their process environment. Due to the nature of the inspections and the cold weather in Iceland, they are much more busy in the summer that they are in the winter. This makes it difficult to keep the right amount of employees. There is little they can do to avoid this problem, but rather they should examine their historical data to determine how many employees they will need in order to meet expected customers during peak months.…

    • 671 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Forecasting and Cost

    • 3434 Words
    • 14 Pages

    Answer all questions on your examination copy. Use the opposite (blank) side, if necessary. Answers or calculations written on the sheet of notes will not be evaluated.…

    • 3434 Words
    • 14 Pages
    Powerful Essays
  • Better Essays

    The problem Woody is facing is that of production space and having modern production facilities. The company is thinking of staying were they are or relocating to a new site where they can have enough space and modern facilities.…

    • 911 Words
    • 4 Pages
    Better Essays
  • Good Essays

    Trans-European Plastics (TEP) is one of Europe’s largest manufacturers of plastic household items. Its French factory makes a range of over 500 products that are sold to wholesaler and large retailers throughout Europe. The company dispatches orders within 24 hours of receipts using an international carrier. All consumers would expect received their requirements in full within one week. The manufacturing operation is based on batch production, employing 24 large injection molding machines. Mould changes (‘set-ups’) take on average three hours, at an estimated cost of € 500 per set-up. TEP had faced declining in delivery reliability, increased levels of finished goods inventory and failing productivity. Failing productivity apparently resulting from ‘split-batches’ where only part of a planned production batch is produces to overcome immediate shortages. Because of current high demand for many products, the backlog of work for planned stock replenishment currently averages two weeks and so all factory orders must be planned far in advance. Recently, however, to minimize the total cost of set-ups and to maximize capacity utilization, all products are planned for a minimum production run of 20 hours. The factory operates on three seven-hour shift, Monday to Friday: 105 hours per week, for 50 weeks per year. Regular overtime, typically 15 hours on a Saturday, has been worked most of the last years. Sunday is never used for production, allowing access to machines for routines and major overhauls.…

    • 670 Words
    • 3 Pages
    Good Essays
  • Better Essays

    unexpectedly high demand. The temperature and humidity in the kiln had to be precisely specified for…

    • 3662 Words
    • 15 Pages
    Better Essays