Preview

Study: Milling Machine and Quality Parts Company

Satisfactory Essays
Open Document
Open Document
392 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Study: Milling Machine and Quality Parts Company
6.1: Case Study Analysis
Quality Parts Company
Quality Parts Company supplies gizmos for a computer manufacturer located a few miles away. The company produces two different models of gizmos in production runs ranging from 100 to 300 units.
The production flow of models X and Y is shown in Exhibit 12.11. Model Z requires milling as its first step, but otherwise follows the same flow pattern as X and Y. Skids can hold up to 20 gizmos at a time. Approximate times per unit by operation number and equipment setup times are shown in Exhibit 12.12.
Demand for gizmos from the computer company ranges between 125 and 175 per month, equally divided among X, Y, and Z. Subassembly builds up inventory early in the month to make certain that a buffer stock is always available. Raw materials and purchased parts for subassemblies each constitute 40 percent of the manufacturing cost of a gizmo. Both categories of parts are multiple-sourced from about 80 vendors and are delivered at random times. (Gizmos have 40 different part numbers.)
Scrap rates are about 10 percent at each operation, inventory turns twice yearly, employees are paid on a day rate, employee turnover is 25 percent per year, and net profit from operations is steady at 5 percent per year. Maintenance is performed as needed.
The manager of Quality Parts Company has been contemplating installing an automated ordering system to help control inventories and to “keep the skids filled.” (She feels that two days of work in front of a workstation motivates the worker to produce at top speed.) She is also planning to add three inspectors to clean up the quality problem. Further, she is thinking about setting up a rework line to speed repairs. Although she is pleased with the high utilization of most of her equipment and labor, she is concerned about the idle time of the milling machine. Finally, she has asked the industrial engineering department to look into high-rise shelving to store parts coming off machine 4.

You May Also Find These Documents Helpful

  • Powerful Essays

    BUS644 Week 6 Assignment

    • 3138 Words
    • 9 Pages

    Space Age Furniture manufactures tables and cabinets for microwave ovens and portable televisions. Both cabinetry styles comes in various sizes offering a number of features however; the basic construction follows the same production and assembly. The focus will be on two types of cabinets; the Saturn which is utilized to house microwaves and the Gemini television stand. Both of these cabinet types require a part which is referred to as part 3079. In order to produce part 3079, a skilled machinist is required to program and stand watch on a special lathe. The skilled machinist, Ed Szewczak, is unhappy because of the increase in overtime to produce part 3079 due to the implementation of material requirement planning (MRP) system. Space Age Furniture has adopted the MRP system in order to reduce storage cost. The estimated storage cost for specifically part 3079 is $1.50 per week for the Saturn microwave stand and $1.25 per week for the Gemini television stand therefore; the part is produced when needed and Space Age Furniture does not want to have an abundance of parts on hand. The master schedule for producing the Saturn and Gemini cabinets is illustrated in Table 1.…

    • 3138 Words
    • 9 Pages
    Powerful Essays
  • Better Essays

    Milling Peo Questionair

    • 7571 Words
    • 23 Pages

    When operating a Milling machine there are a lot of health and safety laws that have to be followed when preparing to use and using a milling machine, the laws and safety precautions that must be taken are as follows:…

    • 7571 Words
    • 23 Pages
    Better Essays
  • Powerful Essays

    The goal is over the next 18 months to develop a system that will allow for the production of both our generic electric fans and personalized fans offered at our China location to become a more stream line process and adopt more of a just-in-time manufacturing approach. In order to make this process a reality the IT department will sent a request to develop an automated ordering system that will allow for quick and accurate tracking of inventory level and ordering of new inventory. The IT department will also be requested to order new bar coding systems that will allow for all merchandise and raw materials to be bar coded, and will decrease the time needed to verify new shipments. The suggestion will also be made to supplement the supply chain by adding an additional provider of electronic fan motors since the company currently being used does not have a perfect track record of dependable on time deliveries of needed inventory. Supplementing this provider will increase the successfulness of the company’s change from a stock-to-market approach to a just-in-time manufacturing approach.…

    • 1520 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    3. Assuming that processing starts at 7 am on a “busy” day, present the situation during such a day, by constructing an inventory build-up diagram for bins and trucks.…

    • 449 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    MD Widgets manufactures three different product lines, Model X, Model Y, and Model Z. Considerable market demand exists for all models. The following per unit data apply:…

    • 379 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    In early 1981, at the National Cranberry Cooperative’s receiving plant number 1 (RP1), overtime costs are too high and delivery trucks and their drivers have to wait several hours to unload. The trucks have to wait because the plant’s holding bins fill up and there is not temporary storage. The holding bins fill up because within the cranberry operating system there is a bottleneck, a place in the production process where production slows down because of a slow or insufficient number of machines. This bottleneck is being caused by the lower relative capacity of the dryers. Relieving the bottleneck in the dryers by adding more dryers will allow the trucks to move through the dumping area more efficiently and decrease overtime costs in 1981.…

    • 681 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Byte Products has three existing plants operating at full capacity (24 hours a day and 7 days a week). The new plant proposed to be built in the southwestern United States will require 3 years before it is fully online. This means that Byte cannot meet the anticipated demand for its products. Alternative courses have been explored: (1) license Byte products and technology to other U.S. manufacturers, and (2) overseas facilities and licensing. Top management found an existing plant in Plainville, New England that would meet the company’s immediate production needs until the new plant will be online in 3 years. The Plainville facility had been closed for the last 8 years. It would take about 3 months to get the Plainville plant online.…

    • 2081 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    Project Management Memo

    • 582 Words
    • 2 Pages

    This project has been started by Research & Development with $450,00 already spent and estimated completion cost of $575,000. The risk of completing this project on time is high with the ROI of $300,000 the first year and $550,000 the second. The third year is expected to bring $750,000 with a product life of 7 years. Advantages of delivering this widget will move our company as a leader in the industry. There are some uncertainties and concerns about this widget with customers that the sales and marketing team have discussed.…

    • 582 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Funtime Inc.

    • 1143 Words
    • 5 Pages

    Funtime, Inc manufactures videogames machines. Funtime, Inc encountered decline in profits as a result of the modernized technology. To offset the decline in profits the management team focused on manufacturing economics and increased production by developing an incentive program for production managers whose contribution allowed for an increase in the amount of units produced and a decrease in its cost. The production management team improved manufacturing by increasing the number of completed units beyond normal production levels. To put together the videogame machines the assembly group required parts from the printed circuit boards (PCH) and the reading heads (RH). To achieve increased production, the parts were not carefully produced which resulted in the rejection of the parts that were not tested and modified to meet manufacturing standards. The preventive maintenance that would have been used was postponed and only emergency repair was being carried out to keep production going. As a result of the pressure on the production group to focus on their machine there was machine downtime in the PCH and RH groups along with the demand for the parts led to more parts being rejected.…

    • 1143 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    So far, the world's medium-speed milling machines are dry law. Hot air carrier that is, separation, sorting products. Therefore in need of a massive and complicated: medium heat generator, fans, vents Central, separator , explosion-proof system (inert gas source), dedusting system, sealing measures and it is difficult to adapt to the high moisture materials, a fine-grained access-class products in the high temperature operating equipment damage and fast, and the situation difficult to control; complete machine too tall. principle but because of movement determined by the grinding efficiency, and in electricity, the cement industry in the milling system is widely used, but no First, wet operations. Therefore, the principle of movement determined by the grinding efficiency has not been fully exploited.…

    • 389 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Strategic Analysis of Hp

    • 5380 Words
    • 22 Pages

    IBISWorld. (2010c). Industry Report 33411. Computer & Peripheral Manufacturing in the US. Retrieved November 7, 2012, from http://0-www.ibisworld.com.helin.uri.edu/industryus/ default.aspx?indid=739…

    • 5380 Words
    • 22 Pages
    Powerful Essays
  • Satisfactory Essays

    Many different kinds of pulverizing equipment includes: Raymond mill, high-pressure grinder, high fineness of crusher, high pressure roller suspension mill and mill pulverizing equipment.Pulverizing equipment adopts advanced structure of similar products at home and abroad, and on the basis of Raymond mill industry update design improvements, the equipment than the ball mill with high efficiency, low power consumption, cover an area of an area small, one-time investment is small.…

    • 390 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    coarse hammer mill

    • 428 Words
    • 2 Pages

    Coarse hammer mill is widely used in metallurgy, mining, chemical,cement coal ,dry stone, construction, sand, refractories and ceramic industrial and mining enterprises, engaged in breaking and crushing the material in the operation.…

    • 428 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    With the agriculture development in these years, rice milling industry develops fast, too. Especially in some developed countries.…

    • 326 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Manufacturing Technology

    • 1245 Words
    • 36 Pages

    What is Manufacturing Technology? (2015, January 1). Retrieved January 18, 2015, from http://www.amtonline.org/aboutamt/WhatisManufacturingTechnology/ In this article, it lists out several manufacturing technologies that set out new and easier processes for not just the workload, but set for an easier lifestyle as well. (summary) The automated systems was best said on my end. Transfer machines, cell phones and other automated devices are used to set a communication establishment upon anyone. It’s all about producing faster and having more efficiency in the industrial world. They also help reduce costs such as a bank you have ATM’s rather than having a clerk or 2 handling your withdrawals and deposits. You also have development of apps. These apps can take pictures of your checks and deposit them from there. Also manage your accounts with transfers and payments. It’s claimed that many human interactions really don’t require the human touch to it, which is true. Transfers of virtual products and or cash don’t need to be manually human handled. The article has been developed this year, which defiantly will have a fair and accurate perspective on the manufacturing technology that we have in mind now.…

    • 1245 Words
    • 36 Pages
    Satisfactory Essays