Study of time and cost of labour productivity for a construction project
INDEPENDENT STUDY – I

“Study of time and cost of labour productivity for a construction project”
Submitted by: Eshani Kothari
Code: PT100513

Guided by:
Prof. P Akalkotkar
Chairman, M.Tech (CEM)
CEPT University

M.Tech. programme in construction Engineering and Management
CEPT University
Ahmedabad- 380009
1

INDEX
TABLE OF CONTENTS
Sr no
Chapter I
1.1
1.2
1.3
1.4
1.5
1.5.1
1.5.2
1.5.3
1.6
1.7
1.8
Chapter II
2.1
2.2
2.2.1
2.2.2
2.3
Chapter III
3.1
3.2
Chapter IV
4.1
4.2
4.2.1
4.2.2
4.2.3
4.3
Chapter V
5.1
5.2
5.2.1
5.2.2
5.2.3
5.3
5.3.1

Title
Research Proposal
Introduction
Need for study
Objectives of the study
Scope of study
Methodology
Literature review
Data collection
Data analysis
Conclusion
Future scope
Research plan
Literature review
Overview
Need for study
Factors affecting labour productivity
Work study
Research gap
Research methodology
Introduction
Methodology
Data collection
Site details
Data collection
Data collection for brickwork
Data collection for Plasterwork
Data collection for excavation
Job layout
Data analysis
Theory and formulas
Calculations for the standard cycle time
Brickwork
Plaster work
Excavation
Proposed cycle time and its cost impact
Brickwork
2

Page no
5
5
5
5
5
6
6
6
6
6
6
6
7
7
7
7
13
17
18
18
18
21
21
22
22
24
25
27
28
28
29
29
30
30
31
33

5.3.1.1
5.3.1.2
5.3.1.3
5.3.2
5.3.2.1
5.3.2.2
5.3.2.3
5.3.3
5.3.3.1
5.3.3.2
5.3.3.3
Chapter VI
6.1
6.2

Analysis on actual cycle time of brickwork
Analysis on proposed cycle time of brickwork
Cost impact of brickwork
Plasterwork
Analysis on actual cycle time of plasterwork
Analysis on proposed cycle time of plasterwork
Cost impact of plasterwork
Excavation
Analysis on actual cycle time of excavation
Analysis on proposed cycle time of excavation
Cost impact of excavation
Conclusion
Conclusions
Future scope
Bibliography

33
34
34



Bibliography: Adnan, E. and Peter, E.M. "Factors affecting Labour productivity in building projects in the gaza strip." Journal of construction engineering and management Volume XIII, pp-4 (2007): 245-254 chitkara, K.K. Construction project management. Tata Mcgraw hill education, 1998. English. Daniel W. Halpin, Ronald W. Woodhead. Construction management. Canada: John wiley and sons, 1980. Henry, M.A and Bengt, H. "Factors affecting the productivity of building craftsmen- studies of uganda." Journal of construction engineering and management vol XIII, pp-3 (2007): 169-176 ingit, Anand. Productivity improvement using work study in construction projects. Thesis. Ahmedabad, 2007 McCaffer, Ronald. Modern construction management. Wiley-blackwell, 2013. English. Oxley R., Poskitt J. Management techniques applied to construction industry. New york, 1996. English. of Engg. Research & Indu. Appls. (IJERIA) (2012). English. Rojas, Eddy M. Construction productivity. Canada: Electric international:The foundation for electric construction Inc, 2008 shah, Aesha. TIME MOTION AND WORK STUDY FOR A CONSTRUCTION PROJECT. Thesis. Ahmedabad, 2012 Thomas, Anu V and J Sudhakumar. "Labour Productivity Variability Among Labour Force – A Case Study." The International Journal Of Engineering And Science (IJES) (2013): 65 "Work study methods for construction projects." Thesis. 2008-09. English.

You May Also Find These Documents Helpful

  • Powerful Essays

    Chamberlin. G. (2011) Economic and Labour Market Review Vol.5, No.3, March. Office of National Statistics…

    • 6196 Words
    • 25 Pages
    Powerful Essays
  • Good Essays

    Work Study Definition: Work study can defined as the analysis of a task for the best optimal method and optimal time to perform. There for this method investigate two branches one is Method of work should carry out and the best timing to perform that task. So it focus on not only high production the efficiency of the production so called productivity. Influence of Work Study in Improving Productivity In order to recognize the function of work study, need to classify method study and that of time study. Method study is typically used to improve the method of performing work. It is applicable for new and existing task , method study focus to find more efficient and effective methods of doing the jobs that are cost-effective and safe, involve less man power input, and need shorter duration to complete. The better method associated with use of best materials and right manpower so that work is carryout in well controlled method towards to increased resource utilization, better quality and lower costs. Time study provides the standard time, the time duration actually required by worker to complete a task by the standard method. The standard time depend…

    • 621 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    COST PERFORMANCE FOR BUILDING CONSTRUCTION PROJECTS IN KLANG VALLEY A.S. Ali*, S.N. Kamaruzzaman University of Malaya, Faculty of Built Environment Building Performance and Diagnostic Group 50603 Kuala Lumpur, Malaysia Tel: +603-7967 4494 Fax: 603-7967 5713 Corresponding Author: asafab@um.edu.my Abstract Since seventies, the economic of Malaysia has undergone rapid growth. Construction industry constitutes an important element of Malaysian economy. It shows how important to control and manage the projects in good quality and efficiently. There are four fundamental constraints needed to be considered when managing the construction projects, which are scope, cost, time, and quality. In order to manage the projects successfully, it is necessary to consider whether the project is within those four constraints. However, it found that there were many problems on cost performance in many countries. One of the major problems was cost overrun in construction projects. In Malaysia, the problem of cost overrun considered significance in construction industry. There were many factors that contribute to cost overrun in Malaysian construction projects. The factors might become risks and lead to negative effect to the projects. Hence, this research is to identify factors that contribute to cost overrun and potential measures to overcome the problem with the focus given to construction projects within Klang Valley. The method used in this research is quantitative based. A questionnaire survey conducted to collect data from the respondents that consisted of project manager, quantity surveyor, M & E Engineer, C & S Engineer, and other related respondents. Questionnaires were distributed to 30 respondents from construction firms in Klang Valley. Data collected form a database for analysis using Statistic Package for Social Sciences (SPSS) version 17.0. Descriptive…

    • 4232 Words
    • 17 Pages
    Powerful Essays
  • Powerful Essays

    5. Hall, R and Jones, C. (1999). Why Do Some Countries Produce So Much More Output Per Worker Than Others? Quarterly Journal of Economics, 114(1), 83-116.…

    • 4313 Words
    • 18 Pages
    Powerful Essays
  • Good Essays

    The infrastructural development and socio-economic progress of a nation utterly depend upon the conceptual visualization of major projects. Construction industries play an important role in economic growth and development of any country especially for developing countries like, India. In recent development, witnessed globally, it is observed that the construction industry has become one of the largest industries and its contribution is more than 10% of global economy. On account of characteristics possessed by the construction industry it is very prone to risk and uncertainty. Such…

    • 4776 Words
    • 19 Pages
    Good Essays
  • Satisfactory Essays

    AN APPARAISAL OF THE EFFECT OF INFLATION ON THE DELIVERY OF CONSTRUCTION PROJECT IN NIGERIA.…

    • 939 Words
    • 4 Pages
    Satisfactory Essays
  • Better Essays

    Construction Management

    • 1103 Words
    • 5 Pages

    Construction contracts structure the way in which construction is purchased. There are variety between construction purchasing system and buying something in a store for instance mobile phone or sofa. When we have the finished product available for our inspection, we can decide whether it meets our requirements. Since the final product is available, we can purchase it from a single store. With the construction it works different. The facility is purchased before it is „manufactured” based on set of drawings and work descriptors. Finally item requires the purchaser to coordinate many entities to include:…

    • 1103 Words
    • 5 Pages
    Better Essays
  • Good Essays

    -The Kickoff Meeting is the first meeting with the project team and the client of the project. This meeting would follow definition of the base elements for the project and other project planning activities. This meeting introduces the members of the project team and the client and provides the opportunity to discuss the role of each team member. Other base elements in the project that involve the client may also be discussed at this meeting (schedule, status reporting, etc.).…

    • 763 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Ray, S. C. (1997), “Regional Variation in Productivity Growth in Indian Manufacturing: A Nonparametric Analysis”, Journal of Quantitative Economics, 13 (1), 73-94.…

    • 7616 Words
    • 31 Pages
    Powerful Essays
  • Good Essays

    Greek Crisis

    • 650 Words
    • 3 Pages

    • The disproportionately central role of construction as the ‘driving force of the economy’ dating back to the 1960s.…

    • 650 Words
    • 3 Pages
    Good Essays
  • Good Essays

    While the construction industry comprises 5.4% of the overall U.S. Gross Domestic Product (GDP) (Bureau of Economic Analysis, 2013 and Huesman et al., 2013), it lags the rest of the economy in terms of productivity measurement and improvement (Goodrum et al., 2002b). Due to changes in real output and differences in accounting procedures, there is no industry level measure of productivity (Bureau of Labor Statistics, 2012). The Bureau of Labor Statistics…

    • 457 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Construction Equipment

    • 2311 Words
    • 10 Pages

    You are a Project Manager on a site where works for 3KM long Tunnel has been undertaken. The site is remote and takes about 2 days travel to nearest town. Supervisors, technicians and skilled workers are engaged in dangerous / hazardous work. Absenteeism due to sickness, quarrels, drinking are adding to less output of work and chances of accident on the site are increasing. Management has urged to do something so that time target can be achieved. Discuss how will you tackle the problem and increase the output of the work.…

    • 2311 Words
    • 10 Pages
    Good Essays
  • Good Essays

    About 70% of the Ugandan people live in villages that continue to be under developed and backward. Lack of civic amenities, employment opportunities, roads, transport facilities, electricity, hospitals and schools in rural areas is a hard reality. The gains of industrialization and development during the past 50 years have mostly been cornered by the urban areas. On an average a city dweller earns nearly 2.5 times more than a ruralite. The gains of technological back-through and industrialization are yet to reach the villages.…

    • 867 Words
    • 4 Pages
    Good Essays
  • Good Essays

    working hours

    • 1210 Words
    • 4 Pages

    Golden, L 2012, ‘The Effects of Working Time on Productivity and Firm Performance: a research synthesis paper’, Conditions of Work and Employment, vol. 33, no. 2, July, p6-7.…

    • 1210 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    on labor productivity. We use a sample of around 450 individuals, across 4 countries (USA, UK,…

    • 2748 Words
    • 14 Pages
    Powerful Essays