Total (115) Marks Weightage 15%
|Q1 |Q2 |Q3 |Q4 |
|Milling |1 |3 |2259.72 |
|Painting |2 |2 |3756.92 |
|Riveting, inserting studs |2 |1 |712.99 |
|Mounting hinges |3 |1 |2534.95 |
|Gluing Carpet |2 |2 |546.72 |
|Attaching metal plastic fixtures |10 |1 |1054.5 |
The current scenario of workstation shows unbalanced workstation capacity in the plant leading to bottlenecks. Future Requirements:
|Operation |Operators |Shifts |Capacity per week |
|Milling |1 |2 |1506 |
|Painting |2 |1 |1878 |
|Riveting, inserting studs |2(SH-1), 1(SH-2) |2 |1783 |
|Mounting hinges |2 |1 |1690 |
|Gluing Carpet |3 |3 |1640 |
|Attaching metal plastic fixtures |8 |2 |1776 |
With adjustments in the number of operators and shifts worked, a more balanced line can be achieved.
a. Elimination of