Preview

Total Productive Maintenance

Powerful Essays
Open Document
Open Document
3296 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Total Productive Maintenance
Determination of interrelationship between Critical success factors in the implementation of Total Productive Maintenance (TPM)

Abstract

Purpose – The purpose of this paper is to determine the critical success factors in the implementation of TPM and establishing a relationship among them.

Approach – All the enabling variables responsible for successfully implementing TPM were identified through literature review. ISM and MIC MAC analysis were applied to find out the levels of their influence in the implementation of TPM.

Findings – Among all the identified variables; Overall Equipment Effectiveness (OEE), Quality, Cost, Delivery, Safety, Cross functional Employee Integration, HR Competency, 5S, Employee Flexibility and Employee suggestions are identified to be the critical enablers.

Research implications – A systematic approach to investigate the effects of aggressive TPM implementation plan for meeting the global standards.
Practical implications – The study focuses on the need of implementing TPM initiatives to enhance the existing maintenance practices.

Originality/value – The research establishes relationship between the variables, affecting TPM implementation, that were identified through intensive literature review.

Keywords - Overall Equipment Effectiveness (OEE), Quality, Cost, Delivery, Safety, Cross functional Employee Integration, HR Competency, 5S, Employee Flexibility and Employee suggestions, TPM, ISM, MICMAC Analysis.
Introduction

Generally Maintenance has been considered as a support function not as a main part. Though it is a Non-productive activity & not a core function adding little value to the product, but most of the manufacturers recognized that the importance of the assets & machines to the operation’s function & an effective strategy can significantly contribute through adding value to the production activities. Ultimately TPM aims to provide an effective & efficient maintenance approach in a manufacturing

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Bsa310 Week 2 Team

    • 546 Words
    • 3 Pages

    References: University of Phoenix. (n.d.). Riordan Manufacturing. Employee Site. Univerysity of Phoenix course materials. Retrieved from: https://ecampus.phoenix.edu/secure/aapd/cist/vop/Business/Riordan/index.asp…

    • 546 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Bsa 375 Week 1

    • 700 Words
    • 3 Pages

    The human resource department has gathered information through the analysis phase and the design phase. Here we will focus on the implementation phase. The implementation phase has six key activities which are critical when executing this phase. The six activities are coding, testing, installation, documentation, training and support. These factors can get quite complex and confusing if the plan is not implemented correctly. Riordan Manufacturing has chosen to follow through with this system to improve its functions and to keep certain employee information confidential.…

    • 700 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    DRAPER INSTRUMENTS

    • 4341 Words
    • 18 Pages

    Analysis: The current performance evaluation and incentive system is causing workers to behave dysfunctionally as employees are aggressively focusing all efforts on factors that are measured to maximize their performance ratings and compensation. Other areas have been left to suffer as employees are not motivated to excel in them. DI's performance evaluation system rewards poor-quality work and encourages high levels of production. Workers’ unmonitored access to an overabundance of materials has resulted in unecessary waste and the over or under production of various parts. Quality, reliability and process issues have been compounded by problematic suppliers and poor internal coordination.…

    • 4341 Words
    • 18 Pages
    Powerful Essays
  • Satisfactory Essays

    The purpose for a needs assessment is to determine the gaps between current conditions and desired conditions. A needs assessment is a critical part of the planning process which provides individuals with the opportunity for improvement, education, and training. In order to gather the information required to improve employees’ performance, an analysis of the work environment is a key aspect to creating better conditions. The company that is being assessed is Verizon and efforts by the company to maximize efficiency are under evaluation. The desired outcome of a needs assessment is to develop a business strategy that integrates the company’s actions, goals, and policies. The ability to have a functional organization with employees operating at their maximum potential requires new technologies for training delivery and the impact of these cutting-edge practices. A high-performance work system within a company is crucial and needs development strategies to achieve success among multiple departments.…

    • 781 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    ISCOM 305 Entire Course

    • 450 Words
    • 3 Pages

    ISCOM-305-Week-1-Individual-Assignment-Employee-Data-Collection-Training-PLEASE-ADD-OWN-IMAGES.ppt ISCOM-305-Week-1-Summary.doc ISCOM-305-Week-2-DQs.doc ISCOM-305-Week-2-Learning-Team-Parker-Earth-Moving-Company-Consulting.doc ISCOM-305-Week-2-Summary.doc ISCOM-305-Week-3-DQ-2.doc ISCOM-305-Week-3-DQ-3.doc ISCOM-305-Week-3-Parker-Earth-Moving-Consulting-Operational-Management.doc ISCOM-305-Week-3-Summary.doc ISCOM-305-Week-3-Taylor-Incorporated-Inventory-Management-Challenge-PLEASE-ADD-OWN-IMAGES.ppt ISCOM-305-Week-4-DQ-1.doc ISCOM-305-Week-4-DQ-2.doc…

    • 450 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Phase 1

    • 4833 Words
    • 27 Pages

    The first major issue that DCCL is facing is an increase in employee turnover, particularly with the TSS’s. Turnover rates are high and DCCL is finding it difficult to keep their TSS’s in particular. This, in turn, is affecting the company’s ability to train and have TSS’s gain a required level of experience. The success of Duplox depends highly on the motivation and quality of work that the TSSs do. Because the TSS’s are the face of the company and involved in both the install of equipment as well as the servicing up equipment, it is imperative that customers have good experiences with the TSS’s. This is currently not occurring for as displayed in several instances. To begin, the TSS’s are experiencing a decline in attitudes toward both their work and the company. Another major issue related to the TSS’s is that they seem to be struggling the most with maintaining a positive morale. TSS’s have little to no autonomy or ability to make any decisions on their own; everything is monitored and controlled by their supervisors. This is creating tension as they are being told what to do, even when company standards, such as safety, are not being met.…

    • 4833 Words
    • 27 Pages
    Powerful Essays
  • Best Essays

    Ginsters Report

    • 4217 Words
    • 17 Pages

    Zwikael. O. & Globersonz, S., (2006). “From Critical Success Factors to Critical Success Processes”, International Journal of Production Research, Vol. 44 No. 17, 2006, pp. 343-3449.…

    • 4217 Words
    • 17 Pages
    Best Essays
  • Satisfactory Essays

    Ans: Evolution is important to determine the process improvement and in this context TMP is really important. Attributes that depend directly on design characteristics are called design dependent parameters and TMPs are measure of this attributes. So it is very essential for tracking the performance.…

    • 319 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    The human resource department at Kaiser uses Epic’s workforce management system to help collect data and hire better employees. Hiring employees who are notably motivated, intelligent, and dedicated will improve efficiency and productivity within the hospital. Hard working efficient nurses and staff will lessen staffing needs and can reduce overtime which will save money in the long run. Hence, the Epic system can track goals that are being met and if not then management will be notified, and will then provide extra training or cross training to increase productivity. Additionally, capital resources play a role in developing efficiency and productivity in the workplace with tools, equipment, inventory, and system implementation. For example, choosing the right equipment is pivotal in a large hospital like Kaiser due to the high quantity of supplies that are needed. Choosing the right equipment such as, computers, blood pressure machines, and pharmacy medication dispensers are very costly but in the big picture will improve efficiency and productivity. Obviously, Epic’s system implementation and software has been the greatest resource for Kaiser, saving millions of dollars throughout the years with their technology, continually improving and upgrading their system to be current and competitive. Over decades, Epic’s computer system…

    • 1530 Words
    • 7 Pages
    Good Essays
  • Powerful Essays

    The Chernobyl

    • 1915 Words
    • 8 Pages

    There are four major methods of improving reliability: designing out the fail points in the operation,…

    • 1915 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Beyond Ergonomics, partners with leaders of organizations by providing consulting and training services to management teams through effective team building. There focus is on teamwork and team building seeing that it has a dramatic affect on organizational outcomes. They believe imperatively that leaders are competent on how to efficiently train new team members (new hires), be able to articulate the organizational vision, identify motivators for productive employees, and implement efficient goal setting. Strategic development of teams, roles, responsibilities, structure, and the skills for conflict resolution can all contribute or hinder growth and efficient operation of their organizations. They have indicated that the above factor have had an impact on whether their organization met their goals, effectively and efficiently.…

    • 885 Words
    • 4 Pages
    Good Essays
  • Good Essays

    NUMMI and GM

    • 592 Words
    • 3 Pages

    NUMMI success in achieving new quality and productivity standards by continuous improvement prove management’s “intrinsic vision”, however, by focusing on achieving superior quality and productivity…

    • 592 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Otis Elevators Case Study

    • 638 Words
    • 3 Pages

    • Managerial challenge – The challenge here is to standardize the process while retaining the key ingredient to success of the company which is the local empowerment and accountability for results. Managing the trade-off of standardizing processes globally while retaining the local empowerment, motivation and accountability will be an especially difficult task.…

    • 638 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    As specified in past projects when Heatway Corporation uses this methodology it is equipped towards the client. As procedures are re-designed and representatives convey a fantastic administration the client looks to profit. This is because of a decrease in the time and expense connected with PTP as those methodologies that included no quality would have been killed.…

    • 2400 Words
    • 10 Pages
    Powerful Essays
  • Good Essays

    Tata Ace

    • 688 Words
    • 3 Pages

    2. Implemented cross – functional teams which used 3P concept. (Production, preparation process) Extensive market study considering all possible factors like political, growth, development and also customer need and requirements.…

    • 688 Words
    • 3 Pages
    Good Essays