1
Ansaldo STS, India
ETCS Implementation in India
Ansaldo was awarded the First European Train Control Systems in India for 50 route Kms and 84 EMU coaches for Chennai suburban in Southern Railway Another order for 190 route Kms and 35 locos between Delhi and Agra in North Central Railway
2
Ansaldo STS, India
Pilot Project 1 : Chennai – Gummidipundi (TPWS-S)
Description
Section Number of stations Length Current signalling Transportation capacity On-board equipment Wayside equipment
Details
- Chennai Beach to Gummidipundi - Chennai Central to Korukkupet 19 50 Km - Relay interlocking - Absolute block working 60,000 passengers/day 84 EMUs to be fitted-out 150 Signals to be fitted-out
3
Ansaldo STS, India
Pilot Project 2 : Delhi – Agra (TPWS-N)
Description
Section Number of stations Length Current signalling Transportation capacity On-board equipment Wayside equipment
Details
New Delhi - Agra 27 168 Km - Relay interlocking - Absolute/Auto block 40,000 passengers/day 35 Locos 580 Signals to be fitted-out
4
Advantages of TPWS System
Assists Railway Operators to meet their safety and modernisation goals by
– Providing a safety protection mechanism against reduced headway of the trains for increasing line capacity – Eliminating human errors leading to : • Signals passed at danger • Overspeeding
The advantages are – Enhanced Safety beyond the capability of legacy ATP – Significant capacity improvement with reduced headway – Assures higher level of safety even at higher operational speed – Providing a widely accepted standard – Accommodating multiple vendors and interoperability – Providing a robust platform for technology upgradation in future – Permitting customisation to meet Indian Railway’s needs – Facilitates normal operation of train in dense foggy condition where visibility is near zero
5
TPWS – Benefits to the drivers
Aids the motormen of loco by various