Sta. Cruz Main Campus
College of Engineering
Supervised Industrial Training (SIT)
Weekly Report
June 24- 28, 2013
Submitted by:
Barile, Eleanor D.
Estimator/ Researcher
Approved by:
It is the first week of our Supervised Industrial Training (SIT) in Areza Development and Marketing Corporation so we are excited and slightly nervous on our first day because we face different kind of people in business world. And we all know that our supervisor is strict so that’s our first impression to him but our supervisor is very humble to us.
We have our orientation regarding the rules and regulations of the company. They assigned us to measure the parking lot of the areza town center mall project. We used measuring tape of 30 meters long to measure the area of the parking lot. The area of the parking lot is trapezoidal in figure and the measure we got is 90 meters on the base, 33 meters on the first height, 25.5 meters on the second height, and 90.3 meters on the hypotenuse.
After we got the measure of the parking lot, we assigned to design it. So we research the sizes of the vehicles, on our research we got the size of a bus is 3 by 10, for car is 2.5 by 5, for motorcycle is 0.8 by 2, and for tricycle is 1.5 by 2 in meters. And then we draw our own design on a bond paper then pass it to our supervisor.
They assigned us to research about the stiffener column and lintel beam that is used on the mall. Stiffener column is anything which is supporting to a beam or column to eliminate the buckling failure due to high deflection and unbalanced eccentric load with a shear tab. The shear tab is welded to the main part and bolted to the secondary part web. The secondary beam can be leveled or sloped. There is a Shaped shear tab with column stiffeners, shaped shear tab with column stiffeners, the secondary part is sloped. Shaped shear tab with column stiffeners. Bolts are aligned with the secondary part. Shaped shear tab