Work instruction for valve
Title : WORK INSTRUCTION OF VALVE REPAIR AND REFURBISH FOR BTE 16” CLASS 1500-SF CILIPADI VALVE

Prepared by:
Reviewed by:
Approved by:
Reviewed by:
(SSB 1)
Reviewed by:
(SSB 2)
Sign:

Name:

Position/Indicator:

Date:

Repair and Refurbish of Pipeline Valves
1 Scope
This recommended practice (RP)provides guidelines for the repair and refurbish of steel ball, check, gate, and plug valves normally use in pipeline applications, as defined by API Spec 6D.
This RP cover repairing or refurbishing of end user’s (owner’s) valves for continued service in the owner’s production applications. It does not cover repair or rerefurbish of used surplus valve intended for resale.
Repaired or refurbished valve may not meet API and/or the OEM standards requirements for new valves.
The owner is responsible for the correct application of valve repaired or refurbished per this document.
Fields repair is outside the scope of this document.

2 References Documents
The following documents contain provisions which, through reference in this text, constitute provisions of this standard. For date references, subsequent amendments to, or revisions of, any of these publications do not apply. However, parties to agreements base on this standard are encouraged to investigate the possibility of applying the most recent editions of the documents listed below. For undated references, the latest edition of the document referred to applies. Referenced standards may be either the applicable edition shown herein or the latest revision, provided the reconditioner can show that the latest edition meets or exceeds requirements of the specific edition listed. When the latest is specified, it may be used on issued, and shall become mandatory six month from the date of the revision.
API Spec 6D
Petroleum and Natural Gas Industries-Pipelines Transportation Systems-Pipelines Valves
ASME1
Section V

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Intro to Transportation

    • 374 Words
    • 2 Pages

    Responsibility: NB Power contracted services with Irving Equipment and BOL stated FOB Destination- damage or loss to the cargo up to the point of delivery to the buyer is responsibility of the shipper.…

    • 374 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    documentation

    • 457 Words
    • 2 Pages

    6. What does the Boiler and Pressure Vessel Regulation govern in the province of Ontario?…

    • 457 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Tm 9-1240-413

    • 3184 Words
    • 13 Pages

    required for administration and operational purposes, as determined 26 October 2005. Other requests for this document will be…

    • 3184 Words
    • 13 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Warranty Repair: The Shop Supervisor (SS) presents the documentation for a failed item to the Division Chief (DC) who disseminates the documents to the Supply Rep (SR) and the Inventory Manager (IM). The SR holds the documentation until further instructions from the IM. The IM contacts the Vendor Coordinator (VC) to provide a status report of the failed items. The VC determines a COA with the vendor to either replace or repair the failed item. If the items are returned to the vendor, the SR will generate a contract. The IM will ship the failed item to the vendor and perform a vendor loss (MIGO_GI). The Production Controller (PC) will determine if a replacement item from the warehouse stock is needed to fulfill a requirement. If a replacement…

    • 425 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Annual maintenance is a necessity so as to lubricate the hinge disk. Debris in the sewer line will cause failures.…

    • 505 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    One Paper

    • 396 Words
    • 2 Pages

    You are part of a group of newly hired team superintendents with Riordan Manufacturing. Your group was hired to lead new teams and begin production of the newly designed CardiCare Valve heart valves. This will be at the organization’s Pontiac, MI, location that is currently manufacturing custom plastic parts. Many of the production employees are current employees from other divisions, and the company expects to hire some new employees.…

    • 396 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Given the information above, what are the consequence of Waterways replacing the machine that is slowing down production because of breakdown?…

    • 325 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Wilkerson company

    • 1150 Words
    • 7 Pages

    VALVES: The valves are designed uniquely. They have loyal customer base because of its high quality. Four machine components are assembled to produce a valve. It has a gross margin of 35%.…

    • 1150 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    The identification number, model number, and serial number is recorded. Confirm that the equipment delivered and installed conforms to specifications. Materials of Construction: Vendor certification of materials of construction must conform to specifications. Valve Types and Connections: The valve types must conform to specifications. All connections in the equipment and from the equipment to utilities must conform to specifications.…

    • 410 Words
    • 2 Pages
    Good Essays
  • Good Essays

    NFPA 85 – Boiler and Combustion Systems Hazards Code – 2001 Edition (NFPA 85 is consolidation of NFPA 8501,8502,8503,8504,8505 &8506) Clauses applicable for Knife Gate valves for pulverized fuel application in NFPA 85 :1.3.171 1.3.171.1 Valve Barrier Valve – A valve, not necessarily gas tight, used to inhibit hot gases from traveling back into any system component open for inspection or maintenance. Burner Shut-off valve – In a pulverized fuel system, a valve that is installed in the fuel line between the pulverizer and the Burner. Dust tight Valve – In a pulverized fuel system, a tight sealing valve installed in the fuel supply pipe to the burner to allow or stop flow. Vent Valve – a valve used to allow venting of air or gas from the system to the atmosphere. Pulverizer System Component Design Requirements All components of the pulverized fuel system as described below that are designed to be operated at no more than gauge pressure of 2psi(13.8 kPa) shall be designed to withstand an internal explosion gauge pressure of 50psi(344 kPa) for containment of possible explosion pressures. For operating gauge pressures in excess of 2 psi (13.8 kPa) the equipment as described below shall be designed to withstand an internal explosion pressure 3.4 times the absolute operating pressure.…

    • 539 Words
    • 3 Pages
    Good Essays
  • Better Essays

    Life Cycle Cost

    • 1061 Words
    • 5 Pages

    – – – – – – – Engineering (e.g. design and drawings, regulatory issues) The bid process Purchase order administration Testing and inspection Inventory of spare parts Training Auxiliary equipment for cooling and sealing water…

    • 1061 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Tank

    • 718 Words
    • 3 Pages

    of problems with the switchover valve and the L & R return valves and the fuel level…

    • 718 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Valve as one of the key devices in flow control system is principally applied in petroleum & gas, energy & power and chemical areas. Subject to slackening economic growth and weakening downstream demand around the globe, sales of valve industry worldwide posted a CAGR of merely 3.3% during 2008-2013.…

    • 706 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Under the normal working pressure,the medium leakage more than allowed level occurs in the sealing surface of safety valve disc and seat,the continuous leak will lead to the hard sealing material destruction.…

    • 247 Words
    • 1 Page
    Satisfactory Essays
  • Powerful Essays

    Drainage and Service Ducts

    • 15620 Words
    • 63 Pages

    Volume 1 Specification for Road Works Series 500 Drainage and Service Ducts DRAINAGE AND SERVICE DUCTS Contents Clause Title 501 Pipes for Drainage and Service Ducts 2 502 Excavation for Pipes and Chambers 6 503 Bedding, Laying and Surrounding of Pipes 7 504 Jointing of Pipes 8 505 Backfilling of Trenches and Filter Drains 10 506 Connecting to Existing Drains Chambers and Channels 11 507 Chambers 11 508 Gullies and Pipe Junctions 14 509 Testing and Cleaning 15 510 Surface Water Channels and Drainage Channel blocks 16 511 Land Drains 16 512 Backfilling to Pipe Bays and Verges on Bridges 17 513 Permeable Backing to Earth Retaining Structures 17 514…

    • 15620 Words
    • 63 Pages
    Powerful Essays

Related Topics