Preview

XYZ-Research

Satisfactory Essays
Open Document
Open Document
408 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
XYZ-Research
traffic survey report BhavnathMahadev Temple at Bhavnath. It then proceeds onwards to various akharas of various sects of sadhus, which are in Girnar hill from ancient times. The procession of sadhus and pilgrims ends again at Bhavnath temple after visiting Madhi, Malavela and Bara Devi temple. The fair begins with...
Premium5914 Words24 Pages
Bhavanath
The case under study is based in a post-independence(near 1960) scenario. The main focus of the government is to boost the economic development throughout the nation. In such situation the government of Bombay Province has come with a plan, to build earthen dams on rivers Lokmata and Sadmata, in...
Premium859 Words4 Pages
Bhavnath Case written analysis and communication assignment 1: case analysis bhavnath temple name : mudit gupta roll no. : 101162 section : a date of submission : 16.07.10 name of institute : institute of managemet, NIRMA university eXECUTIVE SUMMARY:- While adverse...
Premium1141 Words5 Pages
Test
The Bhavnath temple case deals with the problem of convincing the people to relocate to another place in order to vacate space for the construction of the reservoir. Out of the available options educating the benefits of the project to the people is the best solution to the problem. To achieve this...
Premium1013 Words5 Pages
Bhavnath Case Solution
BHAVNATH TEMPLE JULY 16, 2010 Submitted by:- ADITYA LODHA SECTION-A ROLL NO- 101159 CONTINGENCY PLAN In case government is not able to build the dam without breaking the bhavanth temple. Government should choose other location or try to convince villagers for the development of the building...
Premium1069 Words5 Pages
Bhavnath Case Solution
Bhavnath Case Solution MAIN REPORT SITUATION ANALYSIS The fate of any country future’s depends on the decision taken in present. India attention after independence was towards all round economic development. A proposal of dams to be constructed across the rivers Lokmata and Sadmata, which would...

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Unit 5 Assignment 1

    • 297 Words
    • 2 Pages

    The main problem in the construction of the Dulhasti Power Plant Project is the project cost estimation and delivery. The project was based on a straight concept: Dilhasti was designed as a 390MW hydroelectric power plant to be built on Chenab River in the Doda region, The project was supposed to build a hydroelectric generating station, and string hundreds of miles of transmission lines starting near the headwaters of a system of rivers flowing onto the plain south of the mountain region.…

    • 297 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    “He worked himself to death, finally and precisely, at 3:00 a.m. Sunday morning.” The promise of reward for all the hard work and extra hours is wasted on a shortened life barely lived. Every day turned into a blur, barely distinguished from the next. In “The Company Man” by Ellen Goodman, she used a variety of rhetorical devices to tell how she feels Phil, and other working class Americans, work too hard and end up sacrificing their lives, hobbies, and families for a chance at success and how the ideology of big companies ruin the lives of their own.…

    • 616 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Bodie, Z., Kane, A., Marcus, A. J., & Mohanty, P. (2009). Investments. New Delhi: Tata…

    • 13749 Words
    • 86 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The first main concern for the construction of the project is the funds. So as the mayor of Calcutta my first step is to get the funds required to start up this project. These funds would be acquired from various sources like donations, taxes, and loans. Once the funds are acquired, the next step would be to look into the plan of the project. I would take the opinion of a few well-known engineers before an actual plan is taken up. I would make it a point to see to it that the various pros and cons of different plans are taken into consideration before starting the project. Then I would select that project which would give us the maximum benefits within the obtainable budget and least disturbances to the normal life in the city. I would consider the efficient labor to carry on the work of this project.…

    • 339 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    To first follow is the benefits of a dam, it is known that with a fully functional dam…

    • 1694 Words
    • 7 Pages
    Good Essays
  • Satisfactory Essays

    TOVREA AP World History 600 BCE-600 CE - Daily Schedule 15B 8000 BCE- 600 BCE Unit Assessment HW: Vocab/Study 2.1 16A In class: Lecture Americas; test analysis; map activity HW: Vocab/Study 2.1 17B In class: Lecture Americas; test analysis; map activity HW: Vocab/Study 2.1 18A In class: Quiz 2.1; Rome video Persia Webquest activity; Lecture What is an empire?…

    • 727 Words
    • 8 Pages
    Satisfactory Essays
  • Powerful Essays

    Gorges Dam!!!!!

    • 6453 Words
    • 26 Pages

    The conflict between the proponents and the opponents of the dam are based around the key issue of the reservoir that the dam will create. The water will rise an average of 290 meters within the gorges themselves (Chetham, 2002). The reservoir created by the dam will be 360 miles long and an anticipated 175 miles deep (Economy, 2004). The reservoir will cause the flooding of over 12,000 acres of tangerine orchards, 150 towns, 800 historical sites,…

    • 6453 Words
    • 26 Pages
    Powerful Essays
  • Good Essays

    References: Barber, M., Ryder, G. (Eds.), 1993. Damming the Three Gorges. What Dam Builders Don’t Want You…

    • 7896 Words
    • 32 Pages
    Good Essays
  • Good Essays

    The Gorges Dam

    • 1643 Words
    • 7 Pages

    Here we present the pros and cons of world famous and gigantic Three Gorges Dam project.…

    • 1643 Words
    • 7 Pages
    Good Essays
  • Powerful Essays

    The pilgrimage location under study is Tirumala located in Andhra Pradesh state in India. The number of visitors to this important location has been steadily increasing over time. As of 2011, the location attracted approximately 30 to 40 million visitors a year.…

    • 4481 Words
    • 18 Pages
    Powerful Essays
  • Powerful Essays

    References: [vi] Vaidyanathan, A. with Saravanan, J. ‘The Urban Water Scene: A Case Study -Water Situation in Chennai City’ in A. Vaidyanathan, India’s Water Resources: Contemporary Issues on Irrigation. New Delhi, Oxford University Press, 209-247 (2006).…

    • 3358 Words
    • 14 Pages
    Powerful Essays
  • Good Essays

    Oi[O[O[

    • 10498 Words
    • 42 Pages

    NOTICE CONVENING MEETING To The Secured Creditors of Brahmaputra Infraproject Ltd Take Notice that by an order dated 6th August, 2012, the Hon’ble High Court of Delhi has, inter alia, directed for convening of a meeting of Secured Creditors of Brahmaputra Infraproject Ltd for the purpose of considering and, if thought fit, approving, with or without modification(s), the proposed Scheme of Amalgamation of Brahmaputra Infraproject Ltd with Brahmaputra Infrastructure Ltd. Take Further Notice that in pursuance of the said order, a meeting of the Secured Creditors of Brahmaputra Infraproject Ltd will be held on Saturday, 15th September, 2012 at 2.00 p.m. at Modi Hall, PHD Chamber of Commerce and Industry, PHD House, 4/2, Siri Institutional Area, August Kranti Marg, New Delhi-110 016, when you are requested to attend. Take Further Notice that you may attend and vote at the said meeting in person or by proxy, provided that a proxy in the prescribed form, duly signed by you, is deposited at the registered office of the Company as mentioned above not later than 48 hours before the meeting. The Hon’ble Court has appointed Ms Radhika Sardana, Advocate, as the Chairperson and failing her Mr Suwinder Singh Chadha, Advocate as the Alternate Chairperson of the aforesaid meeting. A copy each of the Explanatory Statement under Section 393 of the Companies Act, 1956, the proposed Scheme of…

    • 10498 Words
    • 42 Pages
    Good Essays
  • Good Essays

    Dams of India

    • 1408 Words
    • 6 Pages

    Dams of India have been built across many perennial rivers since the independence of India. These dams in India are a part of several multi-purpose projects to serve a variety of needs. In a multi-purpose project, a river forms a unit and a river valley is developed, by exploiting all the resources of the river. Basically, dams are built to harness the river water so that it can be utilised according to the needs. A multipurpose project is launched often for storing water for irrigation purposes, generating hydro-electricity by utilising the water stored by the dams, preventing floods and facilitating afforestation in the catchments areas of the reservoirs. Moreover, the dams also provide drinking water, using the canals for navigation in some areas and also facilitating pisciculture and recreational activities. The main multipurpose projects constituting Indian dams are the Hirakud Dam in Orissa, the Bhakra-Nangal Project in Punjab, the Damodar Valley Project in Bihar and West Bengal, the Tungabhadra Project in Andhra Pradesh and Karnataka, the Rihand Project in Uttar Pradesh.…

    • 1408 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    Yoga

    • 7195 Words
    • 29 Pages

    of non-duality) in its pure form of ajatavada (theory of nonorigination) is expounded, with illustrative stories in between.…

    • 7195 Words
    • 29 Pages
    Satisfactory Essays
  • Powerful Essays

    Kali Kishen Tagore : In this case the Plaintiff and Defendant were proprietors of land and gardens on opposite sides of a khal in which the tide in the River Hooghly flowed and by which the surface water was carried in a direction from the east to the west into the Hooghly. The Plaintiff was the proprietor on the north side, the Defendant on the south side just at the mouth of the khal. It seemed a tidal creek which is daily subject to the flow of the river; for the protection of the banks on each side of the khal, walls had been erected, one at each side of the khal, and that the Defendant, upon the wall on his side becoming somewhat dilapidated, constructed a fresh one, and the person employed person altered the direction of the wall to some degree; a portion of it he built further in towards the Defendant's land than it had been before, and another small portion he built a little further out. The plaintiff said that the Defendant's wall was an obstruction to the public navigation in the khal which belonged to the Government. The government engineer declined, to interfere, on many grounds, one of which was that the khal was not navigable, and another that there was in his opinion no obstruction.…

    • 2440 Words
    • 10 Pages
    Powerful Essays

Related Topics