What does the project involve?
The primary purpose of the Akosombo Dam was to provide electricity for the aluminum industry. The Akosombo Dam was called "the largest single investment in the economic development plans of Ghana." Its original electrical output was 912 MW, which was upgraded to 1,020 MW in a retrofit project that was completed in 2006.The dam was conceived in 1915 by geologist Albert Ernest Kitson, but no plans were drawn until the 1940s. The development of the Volta River Basin was proposed in 1949, but because there was not sufficient funds, the American company Volta Aluminum Company (Valco) loaned money to Ghana so that the dam could be constructed. Kwame Nkrumah adopted the Volta River hydropower project
What are the advantages of this project to the local people?
The Akosombo Dam benefited some industrial and economic activities from the addition of lake transportation, increased fishing, new farming activities along the shoreline, and tourism. The power generated has provided for primary interests within Ghana, while also supplying power to the neighboring countries of Togo and Benin. Ghana’s industrial and economic expansion triggered a higher demand for power, beyond the Akosombo's power plant capabilities. By 1981, a smaller dam was built at the town of Kpong, downstream from Akosombo and further upgrades to Akosombo have become necessary for maintaining hydropower output.
Are there and disadvantages?
The presence of aquatic weed along the lake and within the tributaries has resulted in even greater detriment to local human health. The weeds provide the necessary habitat for black-fly, mosquitoes and snails, which are the vectors of water-borne illnesses such as bilharzia, river blindness and malaria.Since the installment of the dam, these diseases have increased remarkably. In particular, resettlement villages have showed an increase in disease prevalence since the establishment of Lake Volta, and a village’s