Carlos Carmona

MBA 683 – Project Management

May 15, 2011

Abstract
A work breakdown structure is a tool used by project managers and groups to help define a projects major tasks and discrete work elements. The work breakdown structure also helps us to better understand costs associated with the project by providing the necessary framework and guidance tools. Additionally the WBS is a dynamic tool and can be revised and updated as needed by the project manager (Booz, Allen & Hamilton). In this assignment we will examine the different elements associated with building a bicycle. There are three different levels associated with the framework of building the bicycle and creating a WBS that is easy and ready to use.

WBS Level 1 is showing the first level of building the bicycle. Here we will start to group together the two additional levels necessary to build the framework. The next level is level 2; here we start to identify the major components of the bike. There are seven different components in level 2: 1. Shifting System 2. Frame Set 3. Braking System 4. Wheels 5. Project Management 6. Crank Set 7. Integration

Within the second level there are three major components that are required to build the bicycle. The wheels, frame set, and integration all have separate parts that make up the three components as a whole. On level three there are we put together all the major parts and sub parts that make up the bicycle. Attached is a WBS structure for review.

Frame Set
1.1
Wheels
1.3
Integration
1.6
100

References
Larson, E. W., & Gray, C. F. (2011). Project Management: The Managerial Process (5th ed.). New York, NY: McGraw-Hill/Irwin.
Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure, Office of Project Assessment, doe.gov. Accessed 01. Dec

You May Also Find These Documents Helpful

  • Satisfactory Essays

    8 6 LIST OF REFERENCES ------------------------------------------------------------ Work Breakdown Structure Diagram…

    • 311 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Huntsville Plant

    • 654 Words
    • 3 Pages

    A Work Breakdown Structure can be the key to assurance that the employees will know what task that they are responsible for completing.…

    • 654 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    References: Chapman, James (2004) Work Breakdown Structure (WBS). Retrieved on July 14, 2008 from http://www.hyperthot.com/pm_wbs.htm…

    • 3456 Words
    • 14 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Pm 592 Week 1

    • 340 Words
    • 2 Pages

    Below is a graphic representation of the detailed Work Breakdown Structure to facilitate the project on hand:…

    • 340 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Is305 Project 1

    • 2310 Words
    • 10 Pages

    The project is divided into three major deliverables and four smaller assignments as detailed below:…

    • 2310 Words
    • 10 Pages
    Satisfactory Essays
  • Better Essays

    The Work Breakdown Structure (WBS) contains the different activities within a project. Every activity necessitates outputs from several experts following different measures and timelines. The total of these activities represent the end deliverable. In order to control the task effectively the project supervisor must track the logical order of the various parts. He must visualize the final project deliverable. Views regarding project management, benefits and restrictions, bottlenecks, changes to risk or time in a crisis, and four points touched.…

    • 1092 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    Project Manegement

    • 252 Words
    • 2 Pages

    The work breakdown structure (WBS) is a tool in project management because it offers the basis for deciding on how to do the work.…

    • 252 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Project Management

    • 2874 Words
    • 12 Pages

    Attachments:Part 1 - Attachment #1: WBS Outline. Part 2 - Attachment #1: Gantt Chart Part 2 - Attachment #2: Network Diagram Part 2 - Attachment #3: Schedule Table (ES, LS, EF, LF and Slack) Part 3A - Attachment #1: Q1 Resource Sheet Overallocated Part 3A - Attachment #2: Q2 Gantt Chart Part 3A - Attachment #3: Q2 Resource Sheet Part 3A - Attachment #4: Q4 Level Outside Slack Part 3B - Attachment #1: Q1 Gantt Chart Part 3B - Attachment #2: Q1 Resource Sheet After Add 3 Dev Part 4 - Attachment #1: Part 4 – Cost Table Part 4 - Attachment #2: Part 4 - Cost Flow Trend Part 5 - Attachment #1: 1st Quarter rev 3 Part 5 - Attachment #1: 2nd Quarter rev 3 Part 5 - Attachment #1: 3rd Quarter rev 3 Part 5 - Attachment #1: 4th Quarter rev 3 Part 6 - Attachment #1: Revised Schedule Part 6 - Attachment #2: Tracking Gantt Chart Part 6 - Attachment #3: Cost table…

    • 2874 Words
    • 12 Pages
    Powerful Essays
  • Satisfactory Essays

    Individual Project 2

    • 251 Words
    • 2 Pages

    3.Construct a Work Breakdown Structure (WBS) for your project by first identifying each deliverable required for your project. Then, for each deliverable, identify the activities that must be completed to produce that deliverable. You may use Microsoft Project now, or defer use of Microsoft Project to the Phase 4 IP.…

    • 251 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Project Management

    • 289 Words
    • 2 Pages

    Next, break out each of the Level 1 deliverables into 5–10 activities. This is Level 2 of the action plan. Then, break out Level 2 items into smaller activities. This is Level 3 of the action plan. Keep going with continuous sub-level activities until there is no reason to continue. Depending on your project, only 2 levels may be required for a particular deliverable, so not all level 2 activities are expected to be broken out into level 3 activities.…

    • 289 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Research Paper

    • 3695 Words
    • 15 Pages

    Part A includes four steps to complete, which will become your main post in Unit 3:…

    • 3695 Words
    • 15 Pages
    Satisfactory Essays
  • Good Essays

    PROJ 586 Final Exam

    • 814 Words
    • 4 Pages

    3. (TCO B) The lowest level item of any one branch of the WBS is called a(n) _____.…

    • 814 Words
    • 4 Pages
    Good Essays
  • Good Essays

    AUTOMATIC SPROCKET

    • 596 Words
    • 3 Pages

    in modern developing world, automobile plays important role especially two-wheeler i.e. (motorcycle & bicycle) plays a major role. Even though they are helpful there are some sad events like accidents due to carelessness of riders. Major accidents occur due to forgetting of lifting the side stand. To rectify this problem many advance measure have taken, but they are useless. So as a by considering that it should be implemented practically in all types bikes the new system “AUTOMATIC SPROCKET SIDE STAND RETRIVE SYSTEM ’’this system can be attached in all types of two-wheeler (moped, geared, non-geared, hand geared bikes) and it is designed based on the working principle of bikes.…

    • 596 Words
    • 3 Pages
    Good Essays
  • Good Essays

    6. The wiring loom, which is an inter-woven collection of between 1,200 and 2,000 electrical cables, connecting components, systems and controls.…

    • 1026 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    ATA100

    • 12581 Words
    • 79 Pages

    The complete operational unit. Includes dimensions and areas, lifting and shoring, leveling and weighing, towing and taxiing, parking and mooring,…

    • 12581 Words
    • 79 Pages
    Satisfactory Essays