building services
1.Understand soil and waste pipe system.
1.Discuss the one pipe system, two pipe system and single stack system.
2.Discuss types of siphon
3.Identify traps
4.Recognize materials, fixing and joints for soil and waste pipe
5.Discuss vent pipe

SUB-TOPIC
2.Understand rainwater management
1.Discuss the following :
1.rain water downpipe
2.gully trap
3.gutter
2.Discuss rain water harvesting methods

CA205 BUILDING SERVICES 1

TOPIC 3: SOIL AND WASTE SYSTEM

TWO PIPE SYSTEM

ONE PIPE SYSTEM

•Soil/Waste fixture such as urinals & water closets connected to vertical soil pipe.

• There is one soil pipe & all the waste matter from waster closets, baths, sinks etc., is discharged in this pipe.

• The connection of wastewater from baths, kitchens etc., are made to another vertical wastewater pipe.

• Then is also have vent pipe which provide ventilation only to the traps or water closets.

SINGLE STACK SYSTEM
• Single stack system eliminates the anti-siphonage pipe in the one pipe system.

CA205 BUILDING SERVICES 1

SOIL AND WASTE PIPE SYSTEM

ONE PIPE SYSTEM

CA205 BUILDING SERVICES 1

SOIL AND WASTE PIPE SYSTEM

CA205 BUILDING SERVICES 1

SOIL AND WASTE PIPE SYSTEM

CA205 BUILDING SERVICES 1

SOIL AND WASTE PIPE SYSTEM

CA205 BUILDING SERVICES 1

SOIL AND WASTE PIPE SYSTEM

TWO PIPE SYSTEM

CA205 BUILDING SERVICES 1

SOIL AND WASTE PIPE SYSTEM

CA205 BUILDING SERVICES 1

SOIL AND WASTE PIPE SYSTEM

CA205 BUILDING SERVICES 1

SOIL AND WASTE PIPE SYSTEM

SINGLE STACK SYSTEM

CA205 BUILDING SERVICES 1

SOIL AND WASTE PIPE SYSTEM

CA205 BUILDING SERVICES 1

SOIL AND WASTE PIPE SYSTEM

ONE PIPE

TWO PIPE

SINGLE STACK

+

_

ACTIVITY

CA205 BUILDING SERVICES 1

COMPARISON BETWEEN ONE PIPE, TWO PIPES &
SINGLE STACK

CA205 BUILDING SERVICES 1

TRAPS

• Foul air from the drain and sewer is prevented from penetrating buildings by applying a water trap to

You May Also Find These Documents Helpful

  • Powerful Essays

    Balfour Beatty Construction is a commercial construction company that was formulated in 1933. The headquarter of the company is in Dallas, Texas and service office in U.S. the parent company of the Balfour Beatty Construction is Balfour Beatty which is a London based group. The group is a world class construction, services and engineering organization. The competitive and strategic position of the company can be assessed by the management tools including SWOT and PESTLE analysis. The expertise of the Balfour Beatty varies from equipping, designing, manning, management and construction of the buildings. The basic aim of the company is to expand its business at global level. There are more than 20 operating companies working under the group name Balfour Beatty.…

    • 2114 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    Building Technology: Report

    • 8563 Words
    • 29 Pages

    Learner Name: Abubakr Mohammed [Type the document subtitle] | DELL Table of Contents Introduction…………………………………………………………………………………………………………………………………….. 3 Task 1 (P5) Explain principals of superstructure design……………………………………………………………….. 4 A Low Rise Domestic Dwelling………………………………………………………………………………………………………………….. 4 A portal Frame…………….…

    • 8563 Words
    • 29 Pages
    Powerful Essays
  • Better Essays

    | The client is looking to build a 2300 square foot single-family home in the Midwest region. The client desires to have…

    • 816 Words
    • 4 Pages
    Better Essays
  • Good Essays

    building services essay

    • 1054 Words
    • 5 Pages

    Learners Declaration : I certify that the work submitted for this assignment is my own…

    • 1054 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Construction

    • 1502 Words
    • 7 Pages

    (ASBEC) suggests that the building sector is directly responsible for around 24% of the total energy use. At present this is split fairly evenly between the residential and commercial building sectors. Reducing energy use and reducing greenhouse gas emissions are both worthwhile goals as it saves money and saves the environment. Reducing greenhouse gas (GHG) emissions has been presented with increasing urgency within recent years as it is driving climate change. There are many opportunities to reduce energy and emissions within the building sector.…

    • 1502 Words
    • 7 Pages
    Good Essays
  • Powerful Essays

    In the last few decades, the quest for continuous improvement and innovation has led to the discovery of new approaches to best practice by different players in the construction industry in the United Kingdom. These efforts have been initiated with the view to increase understanding of the needs of key business areas as well as increase client, users and stakeholders ' value. In this regard experts in the field of construction have proposed "rethinking of construction" (Egan 1998) by strategically rethinking operational stages in order to decrease cost and improve performance. One of these strategic operational stages, called the briefing process has perked the interests of the researcher in the course of producing a report on value management. During a research of a case study on ABC, the researcher has observed that without a clearly defined and articulated brief, the concept of "client value" can alter with each individual 's perception. Such alterations can have a deep impact on the quality and the performance of construction projects.…

    • 1657 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Construction Sequence

    • 1605 Words
    • 7 Pages

    Although the specific sequence of construction steps varies and overlaps, generally we build your home in the following order:…

    • 1605 Words
    • 7 Pages
    Good Essays
  • Powerful Essays

    Building Project

    • 7428 Words
    • 30 Pages

    The client requested that AkijGroup provide direction and oversight for the commissioning of Building X. Akij Group engaged AKH Group to work as part of the commissioning team and provide primary support for the construction phase commissioning. The project incorporated a highly energy efficient design with the goal of obtaining a high performance, low maintenance, low operating cost facility achieved through sustainable and energy efficient design features. The project had two primary commissioning-related goals: 1) to incorporate commissioning to ensure that the facility would operate to meet the energy efficient goals and design, and 2) to serve as a learning experience for the client. This is the first time the client has required commissioning starting in the design phase and continuing through the construction and acceptance phase of a project. Through the lessons learned, the client has gained a better understanding of how to more successfully incorporate commissioning into a construction project.…

    • 7428 Words
    • 30 Pages
    Powerful Essays
  • Good Essays

    Know the principles of wastewater treatment associated with septic-tank sewage disposal and wastewater treatment plants.…

    • 309 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Building Structures

    • 1663 Words
    • 7 Pages

    The materials I chose to use to build my three structures are toothpicks and small marshmallows. I chose these materials because I thought it would be fun to use with young children. It’s an activity that’s not messy just a little sticky and they can enjoy a sweet treat while working. The toothpicks and marshmallows are both small promoting help with fine motor development. The limit to only two types of materials to work with isn’t to over whelming. Also engaging their ability to think of different ways and types of structures to build.…

    • 1663 Words
    • 7 Pages
    Powerful Essays
  • Better Essays

    Building Automation

    • 2847 Words
    • 12 Pages

    DS, Danish Standard, DS 21906. P-Net, Multi-master, multi-net fieldbus for sensor, actuator and controller communications.…

    • 2847 Words
    • 12 Pages
    Better Essays
  • Satisfactory Essays

    Pipelining

    • 3624 Words
    • 15 Pages

    At any given point in time we should be able to identify an instruction so…

    • 3624 Words
    • 15 Pages
    Satisfactory Essays
  • Good Essays

    In addition, due to the long history of the campus, many of the on-campus structures were old. As a result, they didn’t meet current regulations or have the ability for substantial technological change. This included many old pipes that cannot be…

    • 708 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    SANITARY PLUMBING

    • 357 Words
    • 2 Pages

    10. All soil and waste for upper level floor to the vertical soil and waste…

    • 357 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Rainwater Harvesting

    • 329 Words
    • 2 Pages

    significantly by diverting the initial flow of runoff water to waste. Improved water quality can also…

    • 329 Words
    • 2 Pages
    Good Essays