I obtained my degree of Bachelors of Science in Electrical Engineering, with communications as a major from XYZ University of Engineering and Technology, in October 2004. I have been registered as a professional engineer with Pakistan Engineering Council (PEC).
After graduation, I joined XYZ Pvt. Ltd as an Engineer in CDMA department. XYZ had been awarded the 800K line WLL Project by client xxx. My main responsibilities were initially rolling out the BSS network in North region which included deployment of BTS and NEC transmission links. After the completion of the rollout phase I was assigned to perform operations and maintenance in North region which involved corrective maintenance and preventive maintenance. I also delivered training to fresh engineers and technical staff of xxx on the xxx’s equipment. (Jul 05 – Jul 07)
While serving in xxx, I got a better opportunity and joined xxx as a Transmission Engineer. I was responsible for the installation, commissioning, integration and supervision of BTS sites along with NEC transmission links. I successfully completed all the assigned projects within the awarded timelines. (Jul 07 – Aug 09)
Currently I am working as a Team Leader xxx Operations with xxx. I have carried out end to project management of Rollout & Expansion. All newly integrated sites in the network are cleared from defects and successfully handed over for operations and maintenance. I am also looking after the corrective and preventive maintenance of BSS network.
I have recently completed my Masters in Engineering Management from University of xxx. (CGPA 3.3,). During my M.Sc degree I presented a paper on “Impact of Poor Quality in Cellular Networks: a case study of cellular operators ”. The paper was selected for the presentation in 12th International QMOD and Toulon-Verona Conference on