Quiz Review
Questions Correct Responses Student Responses
1 MGT370-Ch10-044
a)
T/F LIFO sequencing is more equitable that FIFO sequencing.
FALSE
TRUE

Incorrect
2 MGT370-Ch10-009
a)
MC1 Determining whether activities are going to plan is known as:
Monitoring and control Monitoring and control

Correct
3 MGT370-Ch10-020
a)
MC1 The maximum output of an operations system in a given period is called the:
Designed capacity Designed capacity

Correct
4 MGT370-Ch10-024
a)
T/F Planning and control activities are concerned with providing long-term resources which are capable of satisfying customers' demands
FALSE
TRUE

Incorrect
5 MGT370-Ch10-010
a)
MC1 Determining in what order to do things is known as:
Sequencing
Scheduling

Incorrect
6 MGT370-Ch10-036
a)
MC1 The nature of decisions taken to plan and control an operation will depend on:
The nature of demand and supply for the operation The nature of demand and costs of supply

Incorrect
7 MGT370-Ch10-004
a)
T/F Finite loading is particularly relevant for operations where the cost of limiting the load is not prohibitive.
TRUE
FALSE

Incorrect
8 MGT370-Ch10-007
a)
MC1 Objectives set in both financial and operations terms is an example of long-term, medium-term or short-term planning and control?.
Medium-term planning and control Long-term planning and control

Incorrect
9 MGT370-Ch10-025
a)
T/F Planning and control activities are concerned with operating resources on a day-to-day basis and ensuring availability of materials and other variable resources in order to supply goods and services which will fulfill customers' demands.
TRUE
TRUE

Correct
10 MGT370-Ch10-042
a)
MC1 The approach to loading which does not limit accepting work, but instead tries to cope with it, is called:
Infinite loading Infinite loading

Correct