06CS82
UNIT - 1
INTRODUCTION
June 2012
1. List any three situations when simulation tool is appropriate and not appropriate tool. 6 M
b. Define the following terms used in simulation
i)discrete system ii)continuous system iii) stochastic system iv)deterministic system v)entity vi)Attribute 6M
c. Draw the flowchart of steps involved in simulation study.
8M
June 2010
1a) What is simulation? Explain with flow chart, the steps involved in simulation study
10 M
1b) Differentiate between continuous and discrete systems.
5M
1c)What is system and system environment?List the components of a system,with example. 5 M
Dec 2011
1a. List any five circumstances when the simulation is the appropriate tool and when it is not.
10 M
1b) Explain the steps in a simulation study, with a flow chart
10 M
June 2011
1a) What us system and system environment? Explain the components of a system with an example. 10 M
1b) Explain the various steps in simulation study with the help of a neat diagram
10 M
Dept of ISE, SJBIT
Page 1
SYSTEM SIMULATION AND MODELLING
06CS82
UNIT - 2
GENERAL PRINCIPLES, SIMULATION SOFTWARE
June 2012
2a)Consider the grocery store with one check out counter. Prepare the simulation table for eight customers and find out average waiting time of customer in queue,idle time of server and average service time .The inter arrival time (IAT) and service time (ST) are given in minutes.
IAT : 3,2,6,4,4,5,8
ST(min) :3,5,5,8,4,6,2,3
Assume first customer arrives at time t=0
10 M
2b) Suppose the maximum inventory level is M 11 units and the review period is 5 days estimate by simulation the average ending units in inventory and number of days when a shortage condition occurs .Initial simulation is started with level of 3 units and an order of 8 units scheduled to arrive in two days time.Simulate for three cycles (15 days) The probability for daily demand and