Rationale Laura’s IEP team constructed four following goals and objectives: 1) Communication: During small groups and meal times‚ Laura will use 1-2 word utterances‚ spoken and/or signed for a variety of intents (i.e. to request‚ deny‚ label‚ comment‚ state wants/needs‚ and share past experiences) with peers/adults in the classroom. 2) Communication: During small group and learning center times‚ Laura will increase overall intelligibility with peers/adults by producing age-appropriate speech sounds
Premium Education Teacher School
system. Figure 1: Layout off scanning Electron Microscope. In the optical part of instrument‚ the first thing we notice is the need for a source of illumination. No visible photons of light are produced within the SEM but an invisible beam of electrons. The beam is produced from an electron gun’ and a cross-section through a simplified electron gun is shown below. Figure 2: Cross-section through an electron gun A V-shaped tungsten filament (I) is heated electrically to about 2700Kand the
Premium Electron Scanning electron microscope Electron microscope
They are built using cantilevers; horizontal structures that are only supported on the ends. These bridges are anchored securely on one side‚ in order to hold up the necessary weight on the opposite side‚ which is freestanding. Cantilevers must also withstand tension in the upper supports and compression in the lower supports
Premium Management Project management Construction
School for Mechanical Engineering & Applied Mathematics IMNDNG NDip: Engineering: Mechanical LABORATORY GUIDE STRENGTH OF MATERIALS II (MSM21AI / MSM22AI) COMPILED BY: MNR / MR NP DU TOIT REVISED BY: Mr. O Y Odufuwa DATE REVISED: JANUARY 2013 2 CONTENTS 1. INFORMATION ABOUT THE PRACTICALS ASSIGNMENTS. ...........3 SAFETY AND SAFETY PRECAUTIONS………………………………..3 INTRODUCTION………………………………………………………….3 GENERAL SAFETY…………………….……….………..........................3 LABORATORY
Premium Force
portion is 15 cm deep (Figure 2). The above portion is casted while laying in-situ concrete over planks. The stirrups remain projected out of the precast joist. Thus‚ the total depth of the joist becomes 21 cm. The joist is designed as composite Tee-beam with 6 cm thick flange comprising of 3 cm precast and 3 cm in-situ concrete (Figure 3). This section of the joist can be adopted up to a span of 400 cm. For longer spans‚ the depth of the joist should be more and lifting would require simple chain
Premium Construction Concrete Costs
The first type of roller coaster is the wooden roller coaster. The wooden roller coaster braced by wooden cross ties and diagonal support beams. The entire track rest on wooden or steel beams. Some wooden roller coasters can even go upside down but not a lot of modern roller coasters do this anymore. They don’t do this any more because the wooden track is inflexible. This is also why wooden roller coasters don’t have complex twist or turns. The main motion of a wooden roller coaster is from going
Premium Roller coaster Force Classical mechanics
piles used with this method are usually small diameter bored piles Cantilever Beams This method stabilises existing wall foundations either internally or externally whichever the most appropriate. Two mini-piles are installed‚ one compression and one tension. A pocket is broken out into the existing wall and a reinforced concrete beam is cast linking the two piles. This system is used where traditional underpinning is not appropriate due to the existing
Premium Reinforced concrete Concrete Beam
Statics 1. A uniform flexible steel cable of mass m is suspended between two equal elevation points as shown in the figure below. (a) Determine the tension in the cable (i) at the points of attachment‚ [[pic]] (ii) at its lowest point in terms of (. [[pic]] b) What is the direction of the tension force in each case? 2. Two guy wires run from the top of a pole 2.6 m tall that supports a volleyball net. The two wires are anchored to the ground 2.0 m apart and each is 2.0 m
Premium Force Classical mechanics Mass
open a new store and I have to put together a strong team quickly to cover up and perform the task quickly. I have to choose the best group members so that the task is performed well and achieve the desired objectives in time. So I have chosen Jim Beam as the store manager‚ Julie Stevens as a production specialists and recruiting internal employees. Thus‚ it is my responsibility to increase their readiness level. Hence I as an executive director had to form an effective team with high performance
Free Performance Performing arts Organization
However‚ the landlord‚ Giles Allen‚ claimed that the building had become his with the expiry of the lease. On 28 December 1598‚ while Allen was celebrating Christmas at his country home‚ carpenter Peter Street‚ supported by the players and their friends‚ dismantled The Theatre beam by beam and transported it to Street’s waterfront warehouse near Bridewell. With the onset of more favourable weather in the following spring‚ the material was ferried over the Thames to reconstruct it as The Globe on some
Premium Globe Theatre William Shakespeare