"Concrete" Essays and Research Papers

Sort By:
Satisfactory Essays
Good Essays
Better Essays
Powerful Essays
Best Essays
Page 15 of 50 - About 500 Essays
  • Good Essays

    on-site concrete aggravating. Bags of cement‚ sand‚ aggregate and possibly other additives must be delivered to the construction area. A supply of clean water is also necessary‚ along with a rented concrete mixing hopper. Even after all the dusty and heavy ingredients have been loaded into the hopper‚ there may occur the problem of erroneous water-cement ratio. One common solution to this messy and time-consuming problem is “READYMIX CONCRETE”. 1.1 Readymix Concrete Ready-mix concrete (RMC) is

    Premium Concrete

    • 7651 Words
    • 31 Pages
    Good Essays
  • Powerful Essays

    Work Method Statement

    • 2758 Words
    • 12 Pages

    quality for cast-in-situ pre cast /pre-stressed plain and reinforced concrete with necessary props‚ staging centering scaffolding any temporary construction required for their support. Reinforcement: This work shall consist of furnishing and placing of high yield strength deformed bars of the shape and dimensions as shown in approved drawings. Concreting: This work shall consist of furnishing and placing of plane of reinforced concrete of all grades with 40 or 20mm down graded aggregates as defined

    Premium Concrete

    • 2758 Words
    • 12 Pages
    Powerful Essays
  • Powerful Essays

    asphalt‚ rubber and polysterene plastic (Styrofoam) as a concrete binder John Melvin V. Baranda Carl Jerwin F. Dangdang Gershey Jessa Mae M. De Guzman III-A (Pythagoras) Proponents Pangasinan National High School Lingayen‚ Pangasinan August‚ 2013 Mrs. Margie V. De Leon Adviser Abstract The study “The combination of asphalt‚ rubber and polysterene plastic (Styrofoam) as a concrete binder” sought to investigate the potential of combined

    Premium Construction aggregate Concrete

    • 2250 Words
    • 9 Pages
    Powerful Essays
  • Good Essays

    connected with no weld area. The concrete structure was initially made with a width‚ breadth and height of 1m. The area where the bolt would be placed was cut out using the cut extrusion function in ABAQUS. Due to the large design of the concrete block‚ it is difficult to define a workable size mesh for the problem‚ as can be seen in Figure 24 and 25. Figure 24:Assembled concrete block and bolt showing concrete area compared to the bolt area Figure 25:Assembled concrete block and bolt with mesh During

    Premium Construction Building Measurement

    • 1551 Words
    • 7 Pages
    Good Essays
  • Good Essays

    Task 1 And 3 Combined

    • 893 Words
    • 3 Pages

    The bridge was designed by the French structural engineer Michel Virlogeux and British architect Norman Foster. The bridge opened in 2004 on 16th December after costing around €400 million. The Construction of the Millau came in three parts: the concrete‚ the steel and then the final construction. The Viaduct used many different specialties in the field of civil engineering and innovations in their approach to construction of the bridge‚ which cut costs and increases speed of construction. Materials

    Premium Concrete Millau Viaduct Construction

    • 893 Words
    • 3 Pages
    Good Essays
  • Good Essays

    precast

    • 3517 Words
    • 15 Pages

    Precast Concrete Buildings Pre-Cast Concrete Elements in Construction - Emerging Scenario in India Pre-cast construction is gaining significance in Indian scenario in general and Urban areas in particular. Precast construction can be broadly classified in to three categories. - Project Specific Pre-Cast - General Pre-Cast for Sector Specific - Precast for Non Structural Elements While the first and last categories are very much prevalent in India for quite some time. The First

    Premium Concrete

    • 3517 Words
    • 15 Pages
    Good Essays
  • Powerful Essays

    Stub Setting

    • 5312 Words
    • 22 Pages

    CHAPTER – 4 STUB SETTING 1.0 1.1 EXCAVATION PIT MARKING: After the location marking has been done‚ the marking of the pits for excavation for the foundation of the location is carried out. This is based on the specific foundation drawing of the type and make of the tower which is to be erected at that location. 1.2 The tower legs‚ footings and faces are designated as shown in the drawing below. 1.3 The pit marking shall be carried out according to the pit marking drawing which

    Premium Concrete

    • 5312 Words
    • 22 Pages
    Powerful Essays
  • Good Essays

    Test 6. Conclusion 1. Introduction The purpose of this laboratory was to first test the effect that increasing water content would have on the workability of fresh concrete‚ completed by way of a slump test. The second part of the laboratory was to check what the influence of a superplasticiser would have on workability of fresh concrete‚ this was completed by completion of a Vebe test. 2. Materials and Equipment - Slump Equipment used within the slump test: 1. Slump Cone‚ Rod‚ Base plate Sampling

    Premium Concrete Portland cement

    • 704 Words
    • 3 Pages
    Good Essays
  • Better Essays

    Aluminum Formwork

    • 1361 Words
    • 6 Pages

    formwork is a rapid pace construction system for forming cast in place concrete structures. Formwork the term given to either temporary or permanent molds into which concrete or similar materials are poured. In the context of concrete construction‚ the “falsework” supports the shuttering molds. This formwork is built out of prefabricated modules with a metal frame (usually steel or aluminum) and covered on the application (concrete) side with material having the wanted surface structure (steel‚ aluminum

    Premium Construction Concrete Tensile strength

    • 1361 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    Building technology notes

    • 8719 Words
    • 65 Pages

    string/s 4. A massive concrete wall that resists overturning by virtue of its own weight 5. In masonry‚ a hard stone or brick used to reinforce an external corner Scarf joint Baluster of a wall 6. A type of half lapped joint used to resist tension 7. One of a number of short vertical member often circular in section‚ Fenestration Fig. A-1 12mm Inflection point used to support a stair handrail 8. The arrangement and design of window in a building 9. What concrete block that is used

    Premium Concrete

    • 8719 Words
    • 65 Pages
    Powerful Essays
Page 1 12 13 14 15 16 17 18 19 50