FINITE ELEMENT MODELING OF REINFORCED CONCRETE STRUCTURES STRENGTHENED WITH FRP LAMINATES Final Report SPR 316 Oregon Department of Transportation FINITE ELEMENT MODELING OF REINFORCED CONCRETE STRUCTURES STRENGTHENED WITH FRP LAMINATES Final Report SPR 316 by Damian Kachlakev‚ PhD Civil and Environmental Engineering Department‚ California Polytechnic State University‚ San Luis Obispo‚ CA 93407 and Thomas Miller‚ PhD‚ PE; Solomon Yim‚ PhD‚ PE; Kasidit Chansawat; Tanarat
Premium Concrete Tensile strength Reinforced concrete
1. How many bits in MAC address? 48 2. How bits in IPv4 IP address? In IPv6 IP ? 32‚ 128 3. How does a client app identify a server app on another computer on the network? Transmission Control Protocol (TCP) & Internet Protocol (IP) 4. What are IP addresses called that begin with 10‚172.161 or 192.168? Private IP addresses 5. In what class is the IP address 185.75.255.10 ? Class B 6. In what class is the IP address 193.200.30.5? Class C 7. Describe the difference between public and private
Premium IP address
Setting up a wireless network can be quite easy; if you have all the correct equipment to do so. Before you start to set it up‚ there are a few things you want to make sure you have before starting. First thing is make sure you have a active internet connection‚ second thing needed is a wireless router that you can let out a good wifi signal out‚ third is to ensure your computers and printer all have a wireless network adapter installed. Before we get started let’s check out the computers; we
Premium Wireless networking Computer network Wireless access point
Surfaces and Guideways Introduction Basic Components Structural Design of Pavements Portland Cement Concrete Design Asphalt Concrete Pavement Design THE END Thank you Surface - the term surface refers to Roadway pavement which includes Portland Cement concrete‚ treated soil (gravel or other aggregate materials) and Asphalt concrete Guideway - A track along which Automated Transit Vehicles are guided. Guideway include monorails‚ concrete guideway for rubber tired vehicles and conventional duo-rail
Premium Concrete Rail tracks
Companies List and describe the security controls in place. Where are the weaknesses? TJX companies had very little security measures in place‚ and even the ones they had were mostly outdated. The company was using a Wired Equivalent Privacy (WEP) network encryption system. By today’s standards‚ and even at the time of intrusion‚ it is a fairly insecure system and is considered easy to hack into. Wi-Fi Protected Access (WPA)‚ a more complex encryption system‚ was already available at the time
Premium Information security Fair Credit Reporting Act Credit card
Document Title:Risk Based Inspection Guide Lines Document Number:TID-GU- Revision:0 | Document Type:Manual | Corresponding Activity:Inspection | Purpose: This Gide Line is prepared to document the methodology used to PERFORM RISK BASED Inspection Analysis of B1 and B2 equipments and piping. This will guide the further RBI work on B3 equipment and piping. Scope: This document is applicable for performing RBI analysis of all the static equipments and piping at Borouge site. Table of Contents
Premium Risk management Risk assessment Risk
atmosphere and emotion to the novel as it adds great fear or drama to the scene. In chapter ten‚ Victor describes his surroundings and the cracking noise reverberating along the mountains. This particular use of onomatopoeia makes the reader sit on edge as the area is in solemn silence and the cracking of the thunder serves to scare and bring imaginations of a whip cracking. Personification is also a significant literary tool used by Shelley as she uses it constantly throughout the novel‚
Free Frankenstein Fiction Emotion
viable solution for recycling of plastics. Thus two universal problems such as problems of waste plastic and problems of fuel shortage are being tackled simultaneously. The waste plastics are subjected to depolymerisation‚ pyrolysis‚ catalytic cracking and fractional distillation to obtain different value added fuels such as petrol‚ kerosene‚ and diesel‚ lube oil‚ furnace oil traction and coke. The catalyst used here is a mixture of zeolite‚ clay‚ alumina and silicates in different proportions
Premium Petroleum Waste management
Before Hoover Dam After By- Balaji.T.K‚ CE02B011 CONTENTS No Description Page no 1. Hoover dam an Introduction 1 2. Requirements posed by structural design 2 3. Requirements posed by other details 6 4. Type of Concrete 7 5. Guidelines for Mix design 9 6. Fabrication and Installation 10 7. Formwork 11 8. Cooling of concrete 12 9. Temperature control of Mass Concrete 12 10. Quality Assurance 13 11. Bibliography 14 Hoover Dam- an Introduction! It still stands tall as an engineering marvel
Premium Concrete
WHITE-TOPPING A SOLUTION FOR DISTRESSED ROAD ABSTRACT India has one of the largest highway and road networks on the planet‚ third road network after United States and China. The road network has expanded from 0.4 million km in 1951 to about 3.32 million kilometres presently (2012)‚ a sevenfold increase‚ but traffic has increased 120 times. This leads to the deterioration of the surface of the asphalt pavements and a need to rehabilitate them before further damage could occur. Since the use of a
Premium Concrete