conveniently designed conductive disks allow the electrical load of the generator to be fed either with alternating current or direct current. the loop terminals is sinusoidal with zero mean value (Fig. 2). Its frequency is equal to the number of revolutions per second executed by the loop. Each terminal of the loop is connected to a metallic ring. The contacts with rings are made by means of fixed brushes. If the brushes are connected to an electrical load‚ an alternating current will be established
Premium Electrical generator Electromagnetism Alternating current
Distribution decisions Lesson 3 Objectives • Explain why companies use marketing channels and discuss the functions these channels perform. • Discuss how channel members interact and how they organize to perform the work of the channel. • • Identify the major channel alternatives open to a company. • Discuss the nature and importance of marketing logistics and integrated supply chain management. • Discuss the future of retailing Explain how companies select‚ motivate‚ and evaluate channel
Premium Supply chain management Logistics Supply chain
the field is given by the direction of that force. Electric fields contain electrical energy with energy density proportional to the square of the field amplitude. The electric field is to charge as gravitational acceleration is to mass and force density is to volume. 1. Suppose that two point charges‚ each with a charge of +1.00 Coulomb are separated by a distance of 1.00 meter. Determine the magnitude of the electrical force of repulsion between them. Given: Q1 = 1.00 C Q2 = 1.00 C
Premium Electric charge Magnetic field Electromagnetism
Elizabeth. The project will see the erection of four wind “The project will see the erection of four wind turbines‚ utilizing the most modern engineering design...” turbines‚ utilizing the most modern engineering design approved for electrical grid application. The project will cost JPS over J$800 Million‚ and is scheduled for completion by the 4th quarter of 2010. It will result in the addition of 3 megawatts of electricity to the national grid. In preparation for the new
Premium Wind power Renewable energy Expo
ENGR. JAY S. VILLAN‚ MEP-EE Introduction A multitester or multimeter is a device which can be used to gather data about electrical circuits. A basic multitester can measure resistance‚ voltage‚ and continuity; while more advanced versions may be able to provide additional data. This tool can be very useful to have around the house‚ and anyone who plans on doing electrical repairs should most definitely use a multitester for safety reasons. Multitesters can be used with the current off or on in
Premium Electrical resistance Multimeter
Electrical Safety and Tools Christopher McCoy Portfolio Development Abstract Since the widespread incorporation of electricity at the beginning of the 20th century‚ numerous advancements have been made‚ improving greatly upon the procedures involved in the maintenance of electrical components. From generating stations to distributors‚ and in both commercial and residential applications‚ safety involving electrical transmission and principles regarding its usage is continuously
Premium Occupational safety and health Safety Electricity
The ‘Hand Book’ covers the Code of Practice in Protection Circuitry including standard lead and device numbers‚ mode of connections at terminal strips‚ colour codes in multicore cables‚ Dos and Donts in execution. Also principles of various protective relays and schemes including special protection schemes like differential‚ restricted‚ directional and distance relays are explained with sketches. The norms of protection of generators‚ transformers‚ lines & Capacitor Banks are also given.
Premium Circuit breaker
Unit 36: Building Electrical Maintenance Delivery Pack Unit Type Optional EAL Code ETA/036 Level Advanced Notional Learning Hours 75 Description of Unit This unit will enable the candidate to acquire essential knowledge and understanding to carry out necessary electrical maintenance of building systems. Summary of Learning Outcomes To achieve this unit‚ candidates must: 36.1 Demonstrate Knowledge and Understanding of Building Electrical Supply and Maintenance
Premium Electrical engineering Electricity Alternating current
information to the customers about the functions of scooters. On the other hand‚ communication is sometimes ineffective‚ if the executive do not have to skills to influence the intermediaries. Improper communication channel creates disturbance in the distribution programming model. Effective Work Teams: Organization has to develop the effective work teams in order give tough competition to the rivalry firms. In
Premium Marketing
connected to a power source is called the primary winding or input winding. The winding connected to the loads is called the secondary winding or output winding. Introduction The open-circuit test‚ or "no-load test"‚ is one of the methods used in electrical engineering to determine the no-load impedance in the excitation branch of a transformer. In this experiment‚ open-circuit test is conducted on single-phase and three-phase transformer to determine the iron core resistance‚ Rc and magnetized reactance
Premium Transformer