INTRODUCTION Destin Brass Products Co.‚ was facing competition in brass pumps market due to low prices set by competitors. The company started in 1984 used to manufacture only valves initially but started brass pumps and flow controllers because they required the same manufacturing skills. Valves represented 24% of the total revenue of the company and had a gross margin of 35%. Destin was manufacturing 7500 units per month Pumps (55% of the revenues) also required the same setup. The targeted margin
Premium Cost Costs Revenue
Indo-German Energy Programme – Renewable Energy Component PN: 08.2144.7-002.00 Date: 02.06.2014 Terms of Reference for engaging the services of a consultant to develop a roadmap for promoting solar water pumps for irrigation in West Bengal The “Indo-German Energy Programme - Renewable Energy Component” (IGEN-RE) is a bilateral technical cooperation measure between the Federal Ministry for Economic Cooperation and Development (BMZ)‚ Germany and the Ministry of New and Renewable Energy (MNRE)‚ Government
Premium Renewable energy Water
method The Direct Material cost per unit and the direct labour cost per unit for the valves‚ pumps and the flow controller is given below. Direct Material Direct Labour Total Units Cost/unit cost/unit Valves 7500 16 12.35 Pumps 12500 20 16.25 Flow Controller 4000 22 13 The total manufacturing overhead of $654600 should be apportioned based on the activity required for manufacturing each of the valves‚ the pumps and the flow controller. The various manufacturing overheads required for the production
Premium Costs Variable cost Activity-based costing
CHAPTER-2: COMMISSIONING METHODOLOGY CRUDE TANK COMMISSIONING A) CRUDE TANK COMMISSIONING BY GRAVITATION OF PHBPL CRUDE B) CRUDE TANK COMMISSIONING BY CRUDE FROM SPM DIRECTLY C) COMMISSIONING OF SOUTH JETTY CRUDE D) COMMISSIONING OF CRUDE PUMPS E) CRUDE DESPATCH TO AVU F) INTER TANK TRANSFER CHAPTER-3: 3.1 FACILITIES INSTALLED IN CRUDE TANKAGE 3.2 MECHANICAL 3.3 ELECTRICAL 3.4 CIVIL 3.5 INSTRUMENTATION CHAPTER-4: COMMISSIONING REQUIREMENTS 4.1 STATUTORY CLEARANCE
Premium Petroleum Water
Journal‚ 1994‚ 40(3)‚ 496 - 550. 3. Parmar‚ J. C. and Less‚ F. P.‚ The propagation of faults in process plants: hazard identification. Reliability Engineering‚ 1987‚ 17‚277-302. [24] Parmar‚ J. C 4. Requirements and Guidance for the Procurement of Pumps for Auxiliary System Def Stan 02-327/Issue 11 April 2000 5. Requirements for the Design and Installation of Fuel Systems for Gas Turbine Engines and Diesel Engines in HM Surface Ships and Submarines: Defence Standard 02-320 Issue 2 Publication Date
Premium Case study Valve Fluid dynamics
massive front end weight created by the new hemi V-8. Other manufacturers quickly followed.Two power steering designs emerged. Linkage assist steering and the integral power steering gear-each use a constant flow‚ positive displacement hydraulic pump. The pump‚ belt-driven by the engine‚ pressurizes and circulates power steering fluid.Linkage assist steering consists of a hydraulic control valve attached to one end of the drag link or centerlink. The valve receives input signals from the steering wheel
Premium Steering Power steering Hydraulic machinery
How Your Heart Works [pic] Your heart is a pump. It keeps blood moving around your body. The blood delivers oxygen and nutrients to all parts of your body‚ and carries away unwanted carbon dioxide and other waste products. The heart has four chambers - two on the left side and two on the right. The two upper chambers are called the atria‚ and the two lower chambers are called the ventricles. The two sides of the heart are divided by a muscular wall called the septum. Each side of the heart
Premium Heart
the work upgrade on the gas pumps continues. Several small leaks were noted‚ but not concerned about. Procedures were over looked‚ as this risk was a common occurrence. 3. Pressure valve was removed from pump A during servicing and replaced with a thin plate. Time was up on that shift and the engineer wasn’t prepared to do over time to replace valve. Costs were put before safety. 4. Engineer filled out the permit to work form; this is to let everyone know that pump A was out of action. Two permits
Premium Risk Risk management Pipeline transport
LNG CARRIERS History The first LNG carrier Methane Pioneer (dwt 5034 tons) left the Calcasieu River on the Louisiana Gulf coast on 25 January 1959. Carrying the world’s first ocean cargo of LNG‚ it sailed to the UK where the cargo was delivered. Subsequent expansion of that trade has brought on a large expansion of the fleet to today where giant LNG ships carrying up to 266‚000 m3 are sailing worldwide. At the end of 2005‚ a total of 203 vessels have been built‚ of which 193 are still in service
Premium LNG carrier Natural gas Petroleum
Pre-lab Quiz Results You scored 100% by answering 4 out of 4 questions correctly. 1. The movement of sodium and potassium maintained by the Na+ -K+ pump You correctly answered: e. requires energy and is against a concentration gradient. 2. The sodium-potassium pump is classified as a(n) You correctly answered: a. antiporter. 3. The sodium-potassium pump moves _____ sodium ions and _____ potassium ions simultaneously. You correctly answered: b. 3‚ 2 4. Solutes that require active transport for movement
Premium Computer High school Education