CAREER EPISODE 1 "Designing of the Side Arm Charger" During the time I have worked at XXXXX since February 2001 for approximately 5 continuous years as a full time mechanical engineering expert I have been assigned several engineering design projects. One of the projects I have been assigned at October 2005 to work on was to design the side arm charger of a wagon un-loader system. XXXXX was selected as the designer and execution supervisor of this project. The wagon un-loader system
Premium Engineering Mechanical engineering Design
don’t! Better an old PC with fast internet‚ than vice-versa.) 3. Shipping/receiving desk – counter height w/ computer‚ telephone‚ space for P.O.’s‚ receiving scale on floor‚ hand truck. Also postage scale‚ UPS boxes & forms. Needs floor space for racks. 4. Public office – desk‚ chair‚ computer‚ telephone‚ all-in-one printer/scanner/fax/copier. Files/records storage. Space above for water cooler & coffee machine. Bakers will use this space for ordering‚ inventory‚ and break-time. 5. Employee break
Premium Plumbing Refrigerator Burglar alarm
Jell-O Lab Guiding Question: Are some laundry detergents better than others? Purpose: We intend to test if the cost of a detergent affects its quality but putting 3 drops of Jell-O into 25mL of Jell-O and examining how much of the Jell-O dissolves. Hypothesis: If the cost of the detergent increases‚ then the amount of Jell-O dissolved will increase by 0.3 cm. Materials/Equipments: * 4-1mL Pipettes * 5cm long standard drinking straw with a diameter of .6cm. * Jell-O brand
Premium Procter & Gamble Water Carboxylic acid
SUPPLY CHAIN OF IRON ORE With the increasing demand in iron ore due to rapid industrialisation and increase in demand of steel‚ the need for a proper distribution network or a supply chain has been realised. The following section takes into account the supply chain system of iron ore with some examples quoted from the Australia-China supply chain‚ which is one of the most important supply chains due to Australia being the largest exporter and China being the largest importer of iron ore. Logistic
Premium Iron ore Mining
Module 2 Flexi EDGE BTS Installation Planning Confidential – IPR applies 1 © Nokia Siemens Networks Module 2 - Installation Planning / MNa / 2007-05-08 Module 2 - Flexi EDGE BTS installation planning After completing this module‚ the participant will be able to: Theory: • Describe the site requirements for Flexi EDGE BTS • Describe installation options for Flexi EDGE BTS • Describe the DC Power options for Flexi EDGE BTS • Describe transmission options for Flexi EDGE BTS • Describe external
Premium Cable Nokia Coaxial cable
Chapter 1 INTRODUCTION 1.1 Background of the Study In the manufacturing industry‚ a material or a product must be moved from one place to another. In some companies‚ it is done through the use of automated material handling machines‚ but most often‚ it is done by manual effort like pushing/pulling‚ and lifting. All along‚ carts had always played a significant role in the transportation of materials (Torres‚ 2010). Manual efforts had always been a center of study for many people because of the
Premium Toyota
branch of the APA/CPA league to play for. Knowing the terminology‚ their meanings and becoming acquainted with a general description for each branch is essential in learning the rules to the game. Eight-ball is played with a cue ball and a normal rack of 15 object balls. The object of this game is for one player to pocket all of the solid colored balls‚ numbers one through seven or the striped balls‚ numbers nine through 15 and then mark and pocket the eight ball before the opposing team member
Premium Pool
duct for enclosing electric wires or cable. 6. Racks: A computer rack (commonly called a rack) is a metal frame used to hold various hardware devices such as servers‚ hard disk drives‚ modems and other electronic equipment. Some may refer to a rack as "LAN or network furniture" as resembles a shelving structure where components can be attached vertically‚ stacked on top of one another. A computer rack can also be called a relay rack or open rack. 7. Punch-Down Blocks: is a type of electrical
Premium Optical fiber Ethernet Cable
MEMORANDUM FOR PERSONNEL CONCERNED 21 May 2016 SUBJECT: ARMS ROOM STANDING OPERATING PROCEDURES (SOP) 1. References. a. DoD 5100.76-M‚ Physical Security of Sensitive Conventional Arms‚ Ammunition and Explosives b. AR 190-11‚ Physical Security of Arms‚ Ammunition‚ and Explosives c. AR 190-13‚ The Army Physical Security Program d. AR 190-14‚ Carrying of Firearms and Use of Force for Law Enforcement and Security Duties e. AR 190-40‚ Serious Incident
Premium Security United States Army Computer security
resistance. Secondly You have to understand the crusher frame repair ‚ cast steel racks are generally not in direct contact with the material ‚ but the chassis side machine side cover plate and is subject to the material between the chisel -type abrasive wear . In addition‚ the rack shaft shaft hole hammer ‚ hammer crusher after long-term work‚ the hole will be ground into a flat round hole‚ impact hammer work. Fix the rack is carried out with manganese steel surfacing surfacing . Before welding ‚ welding
Premium Steel Wear Tribology