Introduction In Nigeria‚ there are several power generating plants of different types‚ in different locations‚ with different capacities‚ and different modes of operation. A power station or a power generating plant is an industrial facility for the generation of electric power. At the center of nearly all power stations is a generator‚ a rotating machine that converts mechanical power into electrical power by creating relative motion between a magnetic field and a conductor. The energy source
Premium Nuclear power Electricity generation Coal
Draft Water Safety Plan For Kandana Water Treatment Plant Step 1: Catchment and intake Source: Surface water: Kalu Ganga Capacity (Max.): 60‚000 m3/day Kalu Ganga • Kalu Ganga is the second largest river basin (2719 km2)‚ starting from central hills (2250m) and running across the wet zone. • Main sources of water of the river are mountainous forests in the central province and the Sinharaja Forest Reserve. • Largest amount of water (4000 m3) is discharged to the sea at
Premium Drainage basin Water Water pollution
Executive Summary Rohm & Haas recently introduced a new product‚ Kathon MWX‚ in order to exploit an untapped portion (reservoir capacity under 1‚000 gallons) of the biocide market. Even with limited competition within this segment‚ Kathon MWX has not been able to produce its annual target revenues‚ only capitalizing on roughly 6% of said target in a 5 month period. Large-scale distributors‚ who exhibit the most buyer power and influence over end customers in the industry‚ threaten manufacturer
Premium Brand Brand management Branding
[pic] 1.0 Introduction We seem to have an ever-increasing need for more energy. Both households and industries require large amounts of power. At the same time our means of production face new problems. International treaties aim to limit the levels of pollution‚ global warming prompts action to reduce the output of carbon dioxide and several countries have decided to decommission old nuclear power plants and not build new ones. Such development brings about the need to replace old energy
Premium Wind power Energy Energy development
input to any surface water system is precipitation within its watershed‚ the total quantity of water in that system at any given time is also dependent on many other factors. These factors include storage capacity in lakes‚ wetlands and artificial reservoirs‚ the permeability of the soil beneath these storage bodies‚ the runoff characteristics of the land in the watershed‚ the timing of the precipitation and local evaporation rates. All of these factors also affect the proportions of water loss.
Premium Water Hydroelectricity
operate motors‚ actuators‚ and cylinders which then cause a robot to operate. 2) The energy source (electric motor or combustion engine) powers a compressor which forces conditioned air into a pressurized storage tank (which serves as the system reservoir). Constant pressure‚ maintained by pressure regulator valve‚ is automatically adjusted by motor-driven air compressors during system operation. No return lines to a storage tank like hydraulic systems‚ air is vented to atmosphere. The load device
Premium Vacuum Fluid dynamics Hydraulics
MODULE III DIVERSION HEAD WORKS A hydraulic structure which supplies water to the off taking canal is called a head work. Head works are of two types. 1.Storage head works 2.Diversion head works. 1.Storage head works. It stores water during the period of excess supplies in the river and releases it when demand overtakes available supplies. 1.Diversion head works It serves to divert the required supply in to the canal from the river. A diversion head works serves the following
Premium Hydroelectricity Water wheel Water turbine
“water poor.” Alternatives are urgently needed. The water Singapore imports from Malaysia makes up around 30 percent of its total supply. With 2.4 meters of precipitation a year and another 30 percent come from the island’s 17 reservoirs. But digging further reservoirs is not feasible because space is at a premium in Singapore. Instead‚ officials have been forced to find other options. The desalination of seawater is another source of water‚ but it is cost-intensive and therefore only makes up
Premium Water Sewage treatment
AN OVERVIEW OF THE Shed: This shed was set up in Feb. 1976 by Railway Electrification Organization as a part of Tundla – Delhi electrification scheme and was designed to home 50 electric locomotives at an initial cost of 1.5 crore. The prime objective of setting up this shed was to maintain Electric locomotives required for hauling important mail/express trains on Delhi – Howrah section. The initial holding of the shed was 34‚ all of which were WAM4. At present‚ holding has increased to 138
Premium Locomotive Electric motor Steam locomotive
The Sustainability of Experience — Investing in the Human Factor 28th Annual USSD Conference Portland‚ Oregon‚ April 28 - May 2‚ 2008 Hosted by Portland General Electric On the Cover Portland General Electric’s North Fork Dam‚ on the Clackamas River southeast of Portland‚ is a thin‚ variable-radius concrete arch dam with a maximum height of 207 feet and a thickness varying from 32 feet at the base to 8 feet at the crest. The spillway is a 200-foot-long gated ogee-type structure with
Premium Electric current Magnetic field