During Part A (Determination of the Coefficient of Friction) of this experiment‚ as we determine Wb and Wp‚ we are then able to calculate for the coefficient of friction (µ) using the formula: µ = F/N = Wp (g)/ Wb (g) In the first trial‚ we’ve used the wooden block alone and adjusted weights on top of the block and on the pans for the rest of the trials. It has been recorded under Wb and Wp respectively. As we’ve calculated for its coefficient of friction‚ we’ve accumulated the value
Premium Friction Force Classical mechanics
Primavera® P6™ Project Management Reference Manual Copyright © Primavera 1999 - 2007. All rights reserved. While reasonable efforts have been made to ensure the accuracy of this document‚ Primavera assumes no liability resulting from any omission or inaccuracies in this document or from use of the information obtained herein. Primavera reserves the right to make changes to any products described herein to improve reliability‚ function‚ or design‚ and reserves the right to revise this document
Premium Project management
Answers to Red Brand Canners Case Part I 1. Based on the availability of 600‚000 pounds of grade “A” tomatoes (grade 9)‚ one can mix in some grade “B” tomatoes (grade 5) to generate a mix of grade 8. Let X denote the pounds of grade “B” tomatoes that can be mixed in. Then: (600‚000*9+X*5)/(600‚000+X)=8. Solving this‚ yields X=200‚000 lbs for a total weight of 800‚000 lbs. 2. Cooper’s suggestion restricts the usage of tomatoes to merely 800‚000 lbs (as shown in 1). The leftover tomatoes
Premium Management Mind Marketing
in contrast to wide area networks (WANs)‚ include their smaller geographic area‚ and non-inclusion of leased telecommunication lines. ARCNET‚ Token Ring and other technology standards have been used in the past‚ but Ethernet over twisted pair cabling‚ and Wi-Fi are the two most common technologies currently used to build LANs. The increasing demand and use of computers in universities and research labs in the late 1960s generated the need to provide high-speed interconnections between computer
Premium Ethernet Computer network
Bus Topology http://compnetworking.about.com/od/networkdesign/a/topologies.htm http://fallsconnect.com/topology.htm Bus topology Bus topology refers to a single cable that connects all the workstations‚ servers‚ printers and other devices on the network. The cable runs from device to device by using tee connectors that plug into the network adapter cards. Each end device has a terminator on one end of the tee and a cable going out to the next device on the other end‚ while all devices in the
Premium Network topology Ethernet
New Building-Optical Networks The new structure has been given a grant to make its network state of the art by making it a fiber optic network. The topics of discussion that will be mentioned in this paper are the hardware that will be necessary for the inside and outside of the building and how we would expand the fiber to an adjacent building if it is built. Another topic to be discussed will be describing the safety procedures that will be following during the installation. INSTALLATION HARDWARE
Premium Management Marketing OSI model
network administrators have control and security at the foundation or physical layer of their network. With "wire once technology" built into every IntellaPatch switch‚ network administrators have the ability to manage and re-arrange the physical cabling topology of network closets or wire racks without the manual effort of pulling and patching a single wire. The network is cabled to IntellaPatch switches‚ then‚ using the graphical user interface (GUI) of Apcon ’s Control software‚ instantaneously
Premium OSI model Data Link Layer Access control
This is the part of the network that connects the individual to the telecommunications system. It consists of a series of fiber optic and copper cabling along with a number of passive and active devices that is connected to the local exchange .The access network is a critical part of the network because it is the final piece of it that actually connects the end users. The local exchange is where information
Premium Game Massively multiplayer online game Online game
register and computer. This information can be used to generate monthly reports and tax information. The total cost of purchasing these tools includes hardware‚ software and installation. Total hardware costs‚ including the register‚ computer‚ and cabling‚ will cost $777.91. The cost for all software that is needed will be $247.51. The installation costs will be $150.00. The total costs for the complete system will be $1175.42. Implementation of the system can be done on a Sunday when the salon is
Premium Personal computer Computer program Costs
breakdown structure (WBS)‚ establishing a cost and schedule performance measurement baseline‚ earned value management (EVM) and how it relates to the project status‚ how the use of control charts affect status and value‚ and finally how effective change management processes can ensure a successful project. There are multiple parts to an initial project startup. A project manager will identify a need‚ define a scope and then flow down into the work breakdown structure (WBS). “The WBS is a hierarchical
Premium Project management