Case Study on Bhavnath Temple
GOSAI NILESH H.

DIVISION – A

SUB: CASE OF BHAVNATH TEMPLE

SUBMITED TO: Dr. D.R.D.
Introduction:

The case is all about an increasing irrigation facilities after independence but there was certain problems with the removing location of BHAVNATH TEMPLE which is between the dam and people don’t want to change place of temple with that there are some other issue also there.

After independence in 1947, the both central & state government want overall economic development. In undivided Bombay province a proposal given to build dam on river. It calculated 4700 million cu. ft. Water to develop 92000 acre of land, In 3 district. To do that 8 villages are totally submerged and resettled at other place. This all require to providing new livelihood to people.

The reservoir was to have catchments area of 230 sq. miles. The average rainfall was 34”. In this 1 plan the F.S.L., was 592 H.F.L. was 596 and R.L. was 601. Directed irrigable area was 19300 acres and the indirect irrigation flow to some 73600acre. It yields 15.83 lacks revenue per year. Agricultural production increase as 30400 tons. It was 147.74 lacks. This project was fully feasible in the eyes of government. If plan 1 was accepted than temple was saved by using gates to save from flood.

After making 1 proposal government made 2 proposal. In that, if all of three levels rose so that ultimate capacity raise to 1000 million cu. Ft. in that F.S.L. 595 &H.F.L. 606. By doing this the agricultural production increasing and irrigation facilities provide to larger areas. But in 2 plan temple could not be saved but people remained adamant in there demand.

IN 1960 state of Bombay bifurcated and now Gujarat PWD department began to think about reopened the plan again. They find this scheme was good for development. The problem is that what should do to become success of this plan.

Objectives:

• To build the dam, • To increase agricultural production, • Do ultimate overall

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Bharti Mandal Case Study

    • 410 Words
    • 2 Pages

    Bharti Mandal clearly admitted in the trial court that she had been coached. The honourable judge justifies this coaching, explaining in the judgment that there is nothing wrong in tutoring witnesses who are from a lower class and uneducated. I disagree with this fundamentally, their social standing and perceived intelligence according to the judge is not what makes them credible witnesses or not.…

    • 410 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Unit 5 Assignment 1

    • 297 Words
    • 2 Pages

    The main problem in the construction of the Dulhasti Power Plant Project is the project cost estimation and delivery. The project was based on a straight concept: Dilhasti was designed as a 390MW hydroelectric power plant to be built on Chenab River in the Doda region, The project was supposed to build a hydroelectric generating station, and string hundreds of miles of transmission lines starting near the headwaters of a system of rivers flowing onto the plain south of the mountain region.…

    • 297 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    The need for teamwork for big irrigation plans led to the development of government…

    • 796 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Although the recharge and filtering of the pure water source was significantly curtailed, many more times the amount of water available to the growing population was now contained in the formal reservoir system. Also, building so all 2750 monuments must have required a lot of trees. They must have sacrificed a lot of trees for the plaster too, which contributed to…

    • 519 Words
    • 3 Pages
    Good Essays
  • Good Essays

    To first follow is the benefits of a dam, it is known that with a fully functional dam…

    • 1694 Words
    • 7 Pages
    Good Essays
  • Good Essays

    “The Politics of the Andolan,” by [Patrick Mccully] discusses the damaging effects of the Sardar Sarovar Project (SSP). This text details that the Sardar Sarovar Dam is the largest dam and part of the Narmada Valley Project, project involving the construction of large irrigation and hydroelectric multi-purpose dams on the Narmada River. Large dams are to a country's expansion what nuclear bombs are to its military arsenal. Similar to “The Human Cost of Dams,” the SSP ignores that families moved to resettlement locations but have not received new land, water or other privileges. Other natives did not receive recognition as affected because their land rights were never established.…

    • 210 Words
    • 1 Page
    Good Essays
  • Powerful Essays

    Never I my life did I ever imagine walking into a religious building that is not in my nature. As me and my friend park into the Hindu temple parking lot, we saw an amazing white structure that looked enormous. We attended a Hindu Temple near 28th Ave and Maryland named Bharitaya Ekta Mandir. It was a Saturday morning at 9:30 am and that day was the day they worship the deity named Shree Vishnu Sahastranama and Sri Venkateshwara Suprabhatam. It is common for Hindus to perform Puja, daily worship, and this temple had a calendar for each day of the week to worship a different deity at a certain time. Temple Pujas are performed at dawn, dusk, and midnight. We were welcomed by kind people and a man who managed the temple. He led us to the entrance where there was a sign that said “Shoes must be removed before going inside the temple.” We had to abide by the rules and regulations for their religious purposes such as: No shoes, no food/drinks, do not disrespect or touch the shrines and wear clothes that is conservative and non-revealing. Once we have made sure we were dressed properly, we entered the Temple.…

    • 1212 Words
    • 5 Pages
    Powerful Essays
  • Better Essays

    Sikh Case Study

    • 1372 Words
    • 6 Pages

    The case of the Sikh Temple has erupted many concerns both for the Sikh temple supporters and the neighboring citizens. The families who live in Evergreen, San Jose love their neighborhood. This same serenity attracted a man named Bob Singh Dhillon, when he first saw it he was determined he found the ideal site for his congregation’s Sikh temple. As talk of building a beautiful, but large temple in a rural community begins it stirs up many concerns. This temple ahs plans to be 94,000 square feet, a façade of over 316 feet long, and in some places the temple will rise over 60 feet tall. These concerns of this potential temple are as follows: with an estimated 45,000 Sikhs in the bay area, an incline in tourism will result in high traffic concerns and problems and it will degrade the tranquility of the neighborhood lifestyle. Also, the neighborhood doesn’t believe it is suitable for a facility of that size. On the other side the Sikhs are raising a fight for prejudice, a nearby city had the same thing happen to them and the Sikhish people thought they were an “undesirable neighbor”. As a member of the City Council, I will conduct a situation analysis, also known as SWOT to review and conclude this debate. A situation analysis is, an assessment of the strengths and weaknesses in an organization’s internal environment and the opportunities and threats in its external environment (Situational Analysis, 2013). I will identify what the strengths and weaknesses this temple will have if being built versus not being built, and if it does get passed to being built, I will look at, and weigh in the opportunities and threats this temple could produce.…

    • 1372 Words
    • 6 Pages
    Better Essays
  • Good Essays

    The economy of India is based in part on planning through its five-year plans, which are developed, executed and monitored by the Planning Commission. The tenth plan completed its term in March 2007 and the eleventh plan is currently underway…

    • 3059 Words
    • 13 Pages
    Good Essays
  • Powerful Essays

    The History of the Tehri Dam

    • 5230 Words
    • 21 Pages

    A preliminary investigation for the Tehri Dam Project was completed in 1961 and its design was completed in 1972 with a 600 MW capacity power plant based on the study. Construction began in 1978 after feasibility studies but was delayed due to financial, environmental and social impacts. In 1986, technical and financial assistance was provided by the USSR but this was interrupted years later with political instability. India was forced to take control of the project and at first it was placed under the direction of the Irrigation Department of Uttar Pradesh. However, in 1988 the Tehri Hydro Development Corporation was formed to manage the dam and 75% of the funding would be provide by the federal government, 25% by the state. Uttar Pradesh would finance the entire irrigation portion of the project. In 1990, the project was reconsidered and the design changed to its current multi-purpose.[1] Construction of the Tehri Dam was complete in 2006 while the second part of the project, the Koteshwar Dam, is nearly complete with two out of four generators operational. The other two are expected to be commissioned in March 2012 while the pumped storage power planned is slated for commissioning in February 2016.[2]…

    • 5230 Words
    • 21 Pages
    Powerful Essays
  • Powerful Essays

    The Ayodhya issue is a political, historical and socio-religious debate. The controversial issue of Ram Janambhoomi and Babri Masjid has always been a big influence on Indian politics for several decades.…

    • 993 Words
    • 4 Pages
    Powerful Essays
  • Satisfactory Essays

    MRVP- construction of Mini dam with bridge cum regulator across meenachil river at Assisi kadavu in Bhananganam panchayath.…

    • 521 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    Project report

    • 1476 Words
    • 6 Pages

    The charitable trust wants to develop and build facilities on 10,000 sq m of land in prime locality of Pune. Where 5,000 sq of area will be used by the trust for housing, health facility for senior citizens. 5000 sq m will be given free to developer as a cost of development. The cost of land is Rs. 10,000/ sq m. The specifications of flooring for housing, health facility:…

    • 1476 Words
    • 6 Pages
    Better Essays
  • Satisfactory Essays

    facturing sector has been the major force in Bombay creating potential for employment, and that had resulted in migration of rural population. This influx…

    • 3832 Words
    • 16 Pages
    Satisfactory Essays
  • Good Essays

    Dams of India

    • 1408 Words
    • 6 Pages

    Dams of India have been built across many perennial rivers since the independence of India. These dams in India are a part of several multi-purpose projects to serve a variety of needs. In a multi-purpose project, a river forms a unit and a river valley is developed, by exploiting all the resources of the river. Basically, dams are built to harness the river water so that it can be utilised according to the needs. A multipurpose project is launched often for storing water for irrigation purposes, generating hydro-electricity by utilising the water stored by the dams, preventing floods and facilitating afforestation in the catchments areas of the reservoirs. Moreover, the dams also provide drinking water, using the canals for navigation in some areas and also facilitating pisciculture and recreational activities. The main multipurpose projects constituting Indian dams are the Hirakud Dam in Orissa, the Bhakra-Nangal Project in Punjab, the Damodar Valley Project in Bihar and West Bengal, the Tungabhadra Project in Andhra Pradesh and Karnataka, the Rihand Project in Uttar Pradesh.…

    • 1408 Words
    • 6 Pages
    Good Essays

Related Topics