Name: _____________________ Date: __________ Instructor: ___________
Topology Diagram
Assessment Objectives
• Design the Logical topology. 35 points, 20 minutes.
• Configure the physical topology. 15 points, 5 minutes.
• Configure the logical topology. 30 points, 20 minutes.
• Verify network connectivity. 20 points, 15 minutes.
Background
|Hardware |Qty |Description |
|Cisco Router |2 |Part of CCNA Lab bundle. |
|Cisco Switch |2 |Part of CCNA Lab bundle. |
|*Computer (host) |2 |Lab computers. |
|CAT-5 or better straight-through UTP cables |2 | |
|CAT-5 cross-over UTP cable |2 | |
|Console (rollover) cable |1 | |
Table 1. Equipment and hardware for Eagle 1 lab.
Gather the necessary equipment and cables. To configure the Skills Based Final, make sure the equipment listed in Table 1 is available.
Scenario
In this Skills Based Assessment students will create a small network that requires connecting network devices and configuring host computers and one Cisco router for basic network connectivity. The Corporate router and Eagle Server will already be set up. Switch1 has a default configuration, and does not require