1.0 Mind Mapping 2
2.0 Case Study 3
2.1 Case 1 3
2.1.1 Solution 5
2.2 Case 2 6
2.2.1 Solution 9
3.0 Reference 10
1.0 Mind Mapping
2.0 Case Study
2.1 Case 1
TRANSFORMER REPLACEMENT AT MOUNTAIN STATES ELECTRIC SERVICE
Mountain States Electric Service is an electrical utility company serving several states in the Rocky Mountains region. It is considering replacing some of its equipment at a generating substation and is attempting to decide whether it should replace an older, existing PCB transformer. (PCB is a toxic chemical known formally as polychlorinated biphenyl.) Even though the PCB generator meets all current regulations, if an incident occurred, such as a fire, and PCB contamination caused harm either to neighboring businesses or farms or to the environment, the company would be liable for damages. Recent court cases have shown that simply meeting utility regulations does not relieve a utility of liability if an incident causes harm to others. Also, courts have been awarding large damages to individuals and businesses harmed by hazardous incidents.
If the utility replaces the PCB transformer, no PCB incidents will occur, and the only cost will be the cost of the transformer, $85,000. Alternatively, if the company decides to keep the existing PCB transformer, then management estimates that there is a 5050 chance of there being a high likelihood of an incident or a low likelihood of an incident. For the case in which there is a high likelihood that an incident will occur, there is a .004 probability that a fire will occur sometime during the remaining life of the transformer and a .996 probability that no fire will occur. If a fire occurs, there is a .20 probability that it will be bad and the utility will incur a very high cost of approximately $90 million for the cleanup, whereas there is an .80 probability that the fire will be minor and cleanup can be accomplished at a low cost of approximately $8 million. If no fire