Custom Molds, Inc
Case is about family business (father and son : Tom and Mason Miller), which began producing molds and later added production of plastic parts to main business. Although production is traditionally being focused on quality and design of both molds and plastic parts (mass production/ customization accordingly), total number of order is remained the same, but client's desires have been shifted.

1). Custom Molds Inc. has faced the following major issues:

Although the number of parts orders remained virtually constant, the volume per order for parts has increased significantly during last 3 years. These, has created bottlenecks and has led to late deliveries of parts.

Two different processes (fabricating molds/producing plastic parts) take place in a single facility.

Above-mentioned processes serve different customer needs. Fabricating molds requires more skill-oriented stuff, more flexible and qualitative process. Competitive advantage for finished molds (fabricating molds process) is based on delivery and low cost, and moreover this process has much more higher margin that for producing plastic parts.

Sales mix changing has created excess capacity in mold fabrication.

Changing electronics manufactures (Custom Molds`s major clients) strategies has influenced order needs in unexpected way.

Difficult to predict "when?" and "where?".

2). The competitive priorities for each of the individual processes are the quality, cost effectiveness and customer responsiveness. The changing nature of the industry was in the tendency of manufacturers to develop strategic partnerships with suppliers. Hence, more and more demand for responsiveness was laid upon suppliers to sustain the competition. In the Custom Molds' case, as order for multiple molds began declining, the responsiveness of the individual processes began suffering due to the capacity constrains (bottlenecks) at different stages of operations. This naturally entailed the lost sales to customers.

(All the

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Riordan Supply Chain

    • 348 Words
    • 2 Pages

    Moving forward with a new system process design dictates the need to make minor changes that will yield a significant improvement in our supply chain process. We will transition from a forecasting method of production to an agile supply chain process. Last year our on-time deliveries average 93% as the result of an inadequate supply of motors. An agile supply chain process will allow us the flexibility to be responsive to the needs of our customers and minimize the risk of shortages and disruptions of supply (Chase, Jacobs, and Aquilano,2006). Further, an agile process will eliminate much of the difficulty associated the periodic orders placed by our contractual customer. We will install mechanisms to…

    • 348 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Five Star Tools is a small family-owned firm that manufactures diamond coated cutting tools used by jewelers. The production line consists of three major processes: the steel ‘blanks’ are first cut to size and then sent through a chemical bath before the final step in which the prepared tools are diamond-coated and sharpened. The coating and sharpening process requires highly skilled workers, expensive equipment, and utilizes a proprietary process, which simultaneously coats and sharpens the blade of each tool. This stage of production is currently at capacity and causing delays in the completion and delivery of customer orders. Management has identified the final stage of production as the bottleneck, or the binding constraint of production. Delayed orders and eschewed business could be damaging to the firm’s reputation and result in loss of market share to competitors. Either the constraint must be loosened or the firm must turn down business beyond the scope of its current production capacity. Loss of market share and a declining reputation will likely have a negative impact on the firm’s long-term profitability.…

    • 771 Words
    • 4 Pages
    Good Essays
  • Good Essays

    you now have orders flooding in—in fact, so many orders that your manufacturing division can’t…

    • 903 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Anixter Case

    • 1098 Words
    • 5 Pages

    Customer Medical equipment manufacturer Challenge Minimize turnaround on delivered parts Solution Anixter’s just-in-time supply chain solution Results • Shifted inventory to Anixter’s distribution center • Created usage forecasts and generated weekly usage reports • Consolidated and reduced part numbers Benefits • Reduced amount and costs of on-hand materials • Gained greater control over inventory • Minimized paperwork with consolidated process Instead of everything going through separate steps, from a buyer and expediter to receiver, quality control manager and builder, everything is managed by Anixter.…

    • 1098 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    1) Edwards Manufacturing Company purchases two component parts from three different suppliers. The suppliers have limited capacity, and no one supplier can meet all the company’s needs. In addition, the suppliers charge different prices for the components.…

    • 2095 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    For operation problem, there is a production bottleneck exist in company’s operation, the shifting bottleneck. The shifting of process changed frequently from one to another in the manufacturing system. Every individual orders of different customers always change details because variable request or unqualified items. That will definitely bring our workers and workload a lot of trouble. At the same time, we have the pattern of four-day rush orders. This item will delay the process as it sometimes needs rework at one or two operations. It is due to workers are shifted from one operation to another one as demand’s changing so that some workstations are overloaded. But this situation only happened during bulk orders, while in short orders such as less than 8 circuit boards, Arthur Dief can finish it solo and perfect. Also, when the customer’s engineers have design problems, they are permitted to make a call to operation part which can interrupt normal production. That can be one problem which bothered the process. There is a policy that the shipment should be finished before end of a month, which directly lead to the big amount of shipment at the end of the month. This will not only bring big pressure to transportation office, but also has a bad effect on sales. At the same time, workers are hurrying up for finishing shipment, they would not care more about products’ quality. Also, standards of order keep changing frequently will also bring us the same result.…

    • 2420 Words
    • 10 Pages
    Powerful Essays
  • Satisfactory Essays

    Custom Molds Case Summary

    • 502 Words
    • 3 Pages

    Tom and Mason Miller, the owners of Custom Molds, face a number of major issues in their business. The first issue lies in the changing environment. Electronics manufacturers are developing strategic partnerships with parts suppliers, such as Custom Molds. This has changed their sales mix: there are decreased orders for multiple molds and increased order sizes for plastic parts.…

    • 502 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    The long cycle time is creating a bottleneck in getting the products to the customer on time. Additionally, the process is a made-to-order system, as opposed to made-to-stock, so the product is not created until the order is received. The variance in the way the company receives the orders is also creating problems,…

    • 629 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    The Client is a small tooling manufacturer based in Sheffield. The business of the Client is essentially the design, analysis and manufacture of tools for the molding of plastic bottles (various shapes and sizes). The Client receives orders from around twenty regular customers throughout the year, some of which use Solidworks, Pro/engineer, AutoCAD, Intergraph NX or 3D Studio Max.…

    • 2513 Words
    • 11 Pages
    Powerful Essays
  • Good Essays

    Polymer Lab

    • 1013 Words
    • 5 Pages

    Injection molding is the most productive and popular polymer processing techniques. Almost 70% of all plastic parts are made using injection molding. Injection molding of plastics is a process similar to die casting of metals. Molten polymer is injected under pressure into a mold.…

    • 1013 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Cheese Grater Report

    • 744 Words
    • 3 Pages

    3. For die casting, it is usually being done by using a permanent mold. This will results in having a high production rate, plus all 100,000 parts needed can be manufactured from one single mold. The high rate will also turned out to save a lot of production time.…

    • 744 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Injection Molding

    • 1438 Words
    • 6 Pages

    Introduction: Injection molding is the process of producing parts using meltable plastics material through the use of an injection-molding machine. Figure 1 displays a schematic illustration of the process of injection molding. Figure 1: Schematic illustration of an injection-molding machine, part and mold. Injection molding can be costly and difficult process so the engineer must consider part performance requirements, process and material constraints.…

    • 1438 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Magnetic Moulding

    • 1454 Words
    • 6 Pages

    Organizations in today’s competitive environment face dynamic and unpredictable demand from customers. The need to manufacture small quantities of highly…

    • 1454 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    Products and their components are designed to perform certain specific functions. Every product has some design specifications which ensure its functionality aspects. The task of manufacturing is to produce components such that they meet design specifications. Process planning acts as a bridge between design and manufacturing by translating design specifications into manufacturing process details. It refers to a set of instructions that are used to make a component or a part so that the design specifications are met, therefore it is major determinant of manufacturing cost and profitability of products. Process planning answers the questions regarding required information and activities involved in transforming raw materials into a finished product. The process starts with the selection of raw material and ends with the completion of part. The development of process plans involves mainly a set of following activities;…

    • 284 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Business Ia

    • 4660 Words
    • 19 Pages

    There are certain customise services on which this business has to work on. Cut throat competition in market has pressurized the supplier to work on new parameter to grab the attention of customer and survive in the market for longer. Various players in this particular segment are holding strong position like Tanishq, gili, gitanjali, asmi nakshatra, aurra, agni etc.…

    • 4660 Words
    • 19 Pages
    Powerful Essays