factors of conflicts in construction industry
Contents

FACTORS OF CONFLICT AND DISPUTE IN CONSTRUCTION INDUSTRY

1.0 MAIN RESEARCH TITLE

Factors of Conflict and Dispute in Construction Industry

ABSTRACT
Today‘s construction projects become more complex in nature. The complex, relational and lengthy process of designing and building makes construction a process in which disputes are virtually ensured. Furthermore, the involvement of multidisciplinary in the construction project also leads to conflicts among the parties. It seems that conflict and disputes are inevitable to the construction industry especially when most of construction projects are facing with so many uncertainties. Conflict seems to be very synonym with construction projects and giving the impressions of problems includes in increasing project cost, project delays, reduce productivity, loss of profit or damage in business relationships. The main goal of this paper is to overview the factors of conflict in construction industry. The study highlighted three (3) types of conflict factors which are conflict factors due to behavioral problems, contractual problems and technical problems. Factors of conflict due to behavioral factors includes reluctant to check for constructability, clarity and completeness and poor communication among project team. Meanwhile the factors of conflict which is due to contractual problems are such as late giving of possession, delay interim payment from client and unclear of contractual terms. Whereas, contractor fails to proceed in a competent manner and late instructions from architect or engineer are the factors of conflict which arise due to technical problems. This paper was hoped to be guidance for conflict management in future construction projects.

2.0 LITERATURE REVIEW

2.1 DEFINITION OF CONFLICT AND DISPUTE

Conflict is doubt or questioning, opposition, incompatible behavior, controversy or antagonistic interaction and disputes is one of the range of events considered as



References: 1. Brown, H. J. & Marriott, A.L. (1993). ADR: Principles and Practice. London: Sweet & Maxwell. 2. Kumaraswamy, M., & Yogeswaran, K. (1998). Significant souces of construction claims. International Construction Law Review, 15 (1), 144-160. 3. Vorster, M. C. (1993). Dispute prevention and resolution. Austin, Texas: Construction Industry Institute (CII) 4. Deutsch, M 5. Williamson, O. (1979). Transaction cost economics: The governance of contractual relations. Journal of Law Economy, 22, 233–261. 6. Hohns, H. M. (1979). Preventing and solving construction contract disputes. New York: Van Nostrand Reinhold. 7. Carmicheal, D. G. (2002). Disputes and international projects: A.A.Balkema Publishers. 8. MacNeil, I. R. (1974). The many futures of contracts. Southern California Law Review, 47, 691. 9. Diekmann, J 10. Kumaraswamy, M. M. (1997). Conflicts, claims and disputes in Construction. Journal of Engineering, Construction, Architecture Management, 4(2), 95-111 11. Hall, J 12. Galbraith, J. (1973). Designing complex organizations: Addison-Wesley. 13. Mitropoulos, P., & Howell, G. (2001). Model for understanding, preventing and resolving project disputes. Journal of Construction Engineering And Management, 223-231. 14. Jessup, W. E., Jr., & Jessup, W. E. (1963). Law and specifications for engineers and scientists. 15. CheungEssex, J. R. (1996). Means of avoiding and resolving disputes during construction. Elsevier science Ltd: Tunneling and underground space technology, 11(1), 27-31 16. Stipanowich, T 17. Emmitt, S. (2010). Managing Interdisciplinary Projects: A Primer for Architecture, Engineering and Construction. Oxon: Spon Press. 18. Murdoch, J., & Hughes, W. (2000). Construction Contracts: Law and Management. Florence, KY: Routledge. 19. Fenn, P 20. Stephenson, R. J. (1996). Project Partnering for the Design and Construction Industry. New York: John Wiley & Sons Inc. 21. Edgerton, W. W. (Ed.). (2008). Recommended Contract Practices for Underground Construction. USA: Society for Mining, Metallurgy, and Exploration 22. Bunting, S 23. Brooker, P. & Wilkinson, S. (Eds.) (2010). Mediation in the Construction Industry: An International Review. Oxon: Spon Press. 24. Hess, S 25. Simmonds, D. (2003). Statutory Adjudication: A Practical Guide. UK: Blackwell Publishing Ltd 26. John, M 27. Feld, J. & Carper, K. L. (1997). Construction Failure (2nded.). Canada: John Wiley & Sons. 28. Mubarak, S. (2010). Construction Project Scheduling and Control (2nded.). New Jersey: John Wiley & Sons. 29. Wright, D. (2004). Forms of Contract User Guide: The Purple Book (4thed.). UK: Institution of Chemical Engineers. 30. Ramsey, V., Minogue, A., Baster, J. & O‟Reilly, M. (2007). Construction Law Handbook. London: Thomas Telford Publishing. 31. Ashworth, A 32. Egbu, C., Ellis, R. & Gorse, C. (2004). The Practice of Construction Management (4thed.). UK: Blackwell. 33. Klinger, M. & Susong, M. (2006). The Construction Project. USA: American Bar Association. 34. Naoum, S. G. (2007). Dissertation research and Writing for Construction Student (2nded.). UK: Elsevier. 35. Krysik, J. L. & Finn, J. (2010). Research for Effective Social Work Practice (2nded.). New York: Routledge. 36. Oppenheim, A.N. (2004): Questionnaire Design, Interviewing and Attitude Measurement New Ed., Continuum, 11 York Road, London SE1 7NX.

You May Also Find These Documents Helpful

  • Powerful Essays

    As the world evolves through time, the business industry keeps on developing, indicating a fast growth rate of the numbers of merchants around the globe. Each seller will try to sell their goods and services more than their rivals and this merely shows that the current competition is extensive. Since sellers are eager to sell their goods and services, the buyer is often mislead and trapped into business dealings which the buyer’s have had to regret in the end. In order to succeed in their business dealings, the seller, in many situations, tend to withhold important information regarding the good or service they are selling. ‘Consider an injury caused by a product. A person consumes contaminated ginger beer. A child’s toy snaps and injures the child. The brakes in a car fail.’[1]…

    • 3375 Words
    • 14 Pages
    Powerful Essays
  • Better Essays

    Contract Breach

    • 1284 Words
    • 6 Pages

    References: Liuzzo, A. (2013, Ch.15, pg.235) Essentials of Business Law (8th Edition) McGraw-Hill, New York, NY, USA.…

    • 1284 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    In the previous century, the rate of disputes and conflicts related to designing and construction works were very much common not only in private sector; but equally in the public sector. The reason was all the things in which manner they were conceived to work, were not working in that manner. The design consultants were blamed by the contractors for preparing the documents of construction in an incomplete form. In the same…

    • 2072 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    Paseo Caribe Project

    • 1830 Words
    • 8 Pages

    This project involved multiple parties with differing values, interests and opinions. A breakdown in communication, transparency, and collaboration delayed the project from the beginning. Each group fought for their own interests causing conflicts which hindered the progress of the project and negatively affected the reputation of both the country and the construction sector. Irregularities and revisions clouded the legality of the construction project as stakeholders squabbled to make their voices heard.…

    • 1830 Words
    • 8 Pages
    Powerful Essays
  • Powerful Essays

    Bibliography: Sidney M. Levy (2002) Project Management in Construction Project Planning, Management and Delivery | Whole Building Design McGraw-Hill, 2002.…

    • 2275 Words
    • 10 Pages
    Powerful Essays
  • Good Essays

    In answering the question, I will explain the difference between subjective and objective views of agreement. Identify which is used in English Law and why? Examine the relevant theories applicable to objective views on agreement. Look at the types of evidence that are used to make objective assessments and finally identify any exceptions to rule.…

    • 1395 Words
    • 6 Pages
    Good Essays
  • Powerful Essays

    INTRODUCTION Contrary to popular belief and knowledge, arbitration is not the only means of resolving disputes arising from construction contracts.1 Compared to other means of dispute resolution, arbitration as a means of resolving disputes does however have well-defined and generally well-understood mechanisms: this enables it to gain recognition as occupying its very definite place in the arena of dispute resolution “industry”. Further, even though there is some erosion to arbitration’s monopoly in standard forms of construction contracts as the sole and compulsory means of dispute resolution, it will not be wrong to state that arbitration as a means of resolving construction industry disputes is at the moment relatively well-entrenched. Besides, or because of this, there is also the legislative protection and control for arbitration principally in the form of Arbitration Act 1952 (hereinafter referred to as “the 1952 Act”). That is the reason why apart from arbitration and litigation, the rest of the dispute resolution mechanisms are collectively referred to as Alternative Dispute Resolution (or ADR for short). This paper is a brief overview of the legal and procedural landscape of arbitration from its commencement to its conclusion and thereafter. Being an overview, this paper cannot be treated as an exhaustive treatment of the subject, nor is it an attempt so to do: detailed and authoritative expositions can be found elsewhere.2…

    • 6266 Words
    • 26 Pages
    Powerful Essays
  • Good Essays

    The experts suggested that negotiation should be employed as the first method to resolve disputes. Unlike mediation and arbitration, negotiation does not involve a third party in the process of resolution. Some of the identifed advanatges with negotiation are: speedy resolution; flexibility; quick and simple procedure; informality; and privacy. The disputing parties would get together to discuss the problem voluntarily and reach a mutual agreement. Resolving disputes through negotiation is an indispenable part of construction project management. It is an essential skill that…

    • 1524 Words
    • 7 Pages
    Good Essays
  • Satisfactory Essays

    Cv Sunny Yeung

    • 398 Words
    • 2 Pages

    Sunny Yeung has worked in China, Hong Kong and Australia, developing an impressive depth of experience and ability in all facets of the practice of architecture and project management and is well experienced in assessment of claims, arbitration, dispute resolution and expert testimony. He has also been actively involved in land-use applications, lease modifications, land and DMC matters, marketing and product disposal, syndicate loan negotiations and assets enhancement. He is also experienced in client – consultant dispute resolution and professional negligence litigations.…

    • 398 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    4. JC Smith & Thomas: A casebook on contract, eleventh edition, 2000 London: Sweet & Maxwell…

    • 3667 Words
    • 12 Pages
    Powerful Essays
  • Powerful Essays

    Sir Edward Fry, A Treatise on the Specific Performance of Contracts, 6th edition, 1995, Universal Law Publishing House, New Delhi…

    • 5952 Words
    • 21 Pages
    Powerful Essays
  • Good Essays

    Quantity Surveying

    • 46501 Words
    • 187 Pages

    Other books by David Chappell Parris's Standard Form of Building Contract Third edition David Chappell 0-632-02195-0 Building Contract Dictionary Third edition David Chappell, Derek Marshall, Vincent Powell-Smith and Simon Cavender 0-632-03964-7 The JCT Intermediate Form of Contract Second edition David Chappell and Vincent Powell-Smith 0-632-03965-5 The JCT Minor Works Form of Contract Third edition David Chappell 1-4051-1523-8 The JCT Design and Build Contract Second edition David Chappell and Vincent Powell-Smith 0-632-04899-9 Building Contract Claims Fourth edition David Chappell, Vincent Powell-Smith and John Sims 1-4051-1763-X Standard Letters in Architectural Practice Third edition David Chappell 1-4051-1556-4…

    • 46501 Words
    • 187 Pages
    Good Essays
  • Satisfactory Essays

    procurement risk design

    • 11392 Words
    • 62 Pages

    The construction industry is often characterized by the traditional adversarial working relationships between contracting parties. There has been a strong…

    • 11392 Words
    • 62 Pages
    Satisfactory Essays
  • Good Essays

    Excelo construction Ltd was employed by Twobob Ltd to construct a mixed us development. Problems started to arise from the start of the project when Twobob failed to hand the site over to Excelo Construction on the agreed date. Twobob’s nominated sub-contractor caused interruptions when Excelo accused them of interfering with their use of site. Excelo Construction began to become unhappy when representatives of Twobob Ltd started to become fussy with the work Excelo was producing and went as far as delaying the release of interim payments. The representatives also approached the contractor (Excelo) about the removal of a wall in the building, Excelo said that the wall was load bearing and could not be removed but the representative concluded…

    • 1514 Words
    • 7 Pages
    Good Essays
  • Better Essays

    Construction Economics

    • 1856 Words
    • 8 Pages

    The term value added is used to describe the value of a good at a particular stage of production, compared to the value of the product at the previous stage of production. This value can be measured in monetary terms and provides an alternative way to calculate the total value of the production of a commodity. The point to be emphasized here is that while the value added can be compared in terms of value of the product at the first stage of production and at its last stage of the product, that is the output itself, it can also be calculated on a step-by-step production level basis. To illustrate, suppose a production process has four stages, starting from raw materials, to usable inputs and intermediate inputs, before culminating into the final product. Let’s also assume that the raw the monetary value of the product at the four stages are 10, 17, 23 and 31 respectively. So, while the total value added is 21 (31- 0), we can also see that the series of value added at each production step is 10, 7, 6 and 8 respectively. If we add these four individual step value added, we get the same number as that of total value added (10+7+6+8 = 31). Therefore, summation of value addition at each step is equivalent to total value added. One very relevant and practical use of value addition is applied in the calculation of Gross Domestic Product (GDP), where we calculate the value addition at the economy wide level and hence, derive the total GDP.…

    • 1856 Words
    • 8 Pages
    Better Essays